Tender For Addition/ Alteration Of Protection Wall Around The Transformer In Front Of The Air Maint Det Maint Gate At Happy Valley, Shillong, East Khasi Hills-Meghalaya

Assam Rifles-AR has published Tender For Addition/ Alteration Of Protection Wall Around The Transformer In Front Of The Air Maint Det Maint Gate At Happy Valley, Shillong. Submission Date for this Tender is 18-11-2023. Transformer Supply Tenders in East Khasi Hills Meghalaya. Bidders can get complete Tender details and download the document.




Tender Notice

40394065
Tender For Addition/ Alteration Of Protection Wall Around The Transformer In Front Of The Air Maint Det Maint Gate At Happy Valley, Shillong
Open Tender
Indian
Meghalaya
East Khasi Hills
18-11-2023

Tender Details

Addition/ Alteration Of Protection Wall Around The Transformer In Front Of The Air Maint Det Maint Gate At Happy Valley, Shillong

Key Value

Document Fees
INR 1000 /-
EMD
INR 125500.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Addition/ alteration of Protection wall around the transformer in front of the Air Maint Det main gate at Happy Valley, Shillong
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
4Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
6Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above/ below plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
8Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand)
912 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
1015 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand)
11M&L for WPC compound mixing in cement mortar
12Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
14Taking down steel gate and re-fixing the same in RCC colm, Fixing with 75x75x6mm angle iron 45 cm long embedded in cement concrete block 30x30x30 cm of C.C. 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) The wk be executed as per dirn of Engr-in-charge
15Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately).Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
16Painting with aluminium paint of approved brand and manufacture to give an even shade . Two or more coats on new work
17Earth work in excavation by mechanical means (Hydraulic excavator) / manual means infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
18Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
19Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
20Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
2112 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
22Supplying and laying 53 mm to 22.4 mm size stone aggregate
23Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
24Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
25Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : Light shade pigment using white cement
26Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed : All kinds of soil
27Preparation and consolidation of sub gradeconsolidating with 63 mm to 45 mm size stone aggregate
28Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.5 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) cum 4,024.00
29Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete,on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Medium shade pigment using 50% white cement 50% Grey cement
30Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work
31Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
32Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
33Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
34Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
35Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars
36Steel work in built up tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
37Providing andFixingprecoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
3815 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)as in post
39White washing with lime to give an even shade : New work (three or more coats)
40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
41Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
42Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade pigment using white cement
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail