|
| 1 | All the Removal of median New Jersey Crash Barrier from MCW to other site including closing & diversion of MCW traffic of Agra lucknow Expressway.Rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. |
| 2 | Washing of Airstrip by water ofAgra lucknow Expressway .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. |
| 3 | Providing lighting arrangement for shifting work at Airstrip Location .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. |
| 4 | Placing of median New Jersey Crash Barrier from site to MCW including opening & diversion of MCW traffic of Agra Lucknow access controlled (green-field) Expressway. .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. |
| 5 | Retro-reflectorised Traffic sign as per IRC-67-2012Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC 87 2012 made of high intensity grade sheeting type-XI vide clause 801.3, fixed over aluminum sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of property designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 80 cm. 80 cm below ground level as per approved drawing. In such a situation, the Employer / Client, if so desires. could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67 2012. Legends, letters numerals and borders etc should be as per MoRTH specification No-801.3.7. Proof of the same in form of government report shall be uploaded while quoting tender. All the work shall be carried out as per relavent MoRTH Specification .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. (Speed Limit Board 60 cm Circular with diffinitation plate (20 cmX 60 cm) |
| 6 | Retro-reflectorised Traffic sign as per IRC-67-2012Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC 87 2012 made of high intensity grade sheeting type-XI vide clause 801.3, fixed over aluminum sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of property designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 80 cm. 80 cm below ground level as per approved drawing. In such a situation, the Employer / Client, if so desires. could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67 2012. Legends, letters numerals and borders etc should be as per MoRTH specification No-801.3.7. Proof of the same in form of government report shall be uploaded while quoting tender. All the work shall be carried out as per relavent MoRTH Specification .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. (Diversion Board80X60 mm rectangular with diffinitation plate (20 cmX 60 cm) |
| 7 | Supply & fixing of Retroreflective sticker .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T. |
| 8 | Surafce painting with emulsion paint of approved brand manufacture to give and an even shade two coat.- All the work shall be carried out as per relavent MoRTH Specification .The rate of work shall include cost of all material, labour, T&P etc.required for proper completion of work as directed byEngineer-In-Charge including all taxes,labour cess etc.but excluding G.S.T |