}

Supply, Installation, Testing And Commissioning Of Bms(Building Management System), chandrapur-Maharashtra

District Collector has published Supply, Installation, Testing And Commissioning Of Bms(Building Management System). Submission Date for this Tender is 08-12-2023. Building Management System Tenders in chandrapur Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

40376710
Corrigendum : Supply, Installation, Testing And Commissioning Of Bms(Building Management System)
Open Tender
Indian
Maharashtra
Chandrapur
08-12-2023

Tender Details

Supply, Installation, Testing And Commissioning Of Bms ( Building Management System ) -2 Bms Machine:Intel Quad Core Processor ( Latest Technology ) , Windows® 2010 Sp2 Or Above Operating System, 1 Tb Hdd, 8 Gb Ram, Enhanced Graphic Card, Dvd Combo Drive, Ethernet Port With 32 Color Monitor Flat Screen Led Display, Multimedia Keyboard & Optical Mouse And Microsoft Office 2013 And Anti Virus As Per Specification. 3 A4 B / W Laser Printer 4 Software:Supplying, Installing, Testing & Commissioning Of Following Web Based Graphical Interface Software. The System Should Be Accessible From Anywhere On Lan Or Wan Or Ethernet Without Additional Licenses. The Communication Protocol Shall Be One Of The Industry Standard Open Protocols Such As Bacnet, Lon Etc. System Should Be Scalable And Software Should Be Integrable With Access Control, Cctv Vms Seamlessly To Generate A Holistic View. Software Shall Have 3 Simultaneous User License.Note: The Offered Software Has To Support A Min Of 4000 Data Points Or The Data Points Required By This Project Whichever Is Higher. 5 Third Party Integartion: Supplying, Installing, Testing & Commissioning Of Following Ul & Btl Listed Gateway / Open Protocol Software For Integrating The Foll Third Party System Communicating On One Of The Standard Open Protocols Such As Bacnet, Modbus, M-Bus, J Bus Etc - Vendor To Consider Required No. Of Integrators For QtyS Mentioned In Io Summary. Integrator / Gateway / Supervisory Controller Shall Be Of The Same Oem As Field Controllers & Software. Integration Of Following Services Should Be Considered: Chillers Ahu, Pump Vfds Dg Sets Access Control System Cctv Systemfire Alarm & Detection System Lift / Elevators Ups Mfm / Kwh Meters 6 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Deviceddc For Chiller Plant 7 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Deviceddc For Air Handling Units ( Fm, Cs ) ( 2 Units / Ddc Panel ) 8 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Deviceddc For Fcus ( 2 Units / Ddc Panel ) 9 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Deviceddc For Treated Fresh Air Units ( 2 Units / Ddc Panel ) 10 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Deviceddc For Toilet Exhaust Fans 11 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Pressurisation Fans ( 4 Fans / Ddc Panel ) 12 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Plant Room Ventilation ( 4 Fans / Ddc Panel ) 13 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Fire Fighting / Plumbing 14 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Smoke Extraction Fans 15 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Ht Panels 16 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Lt Panels, Transformers, Dg Panels 17 Ip Based Controllers With I / O Modules Etc As Per I / O Summary. The Controller Shall Be Ul / Btl Listed Capable Of Networked Operations To Exchange Data With Other Controllers And Workstations. The Ddc Controllers Shall Be Web Enabled, Ram Of Min 3 Gb And Processor Speed Of Min. 1.2 Ghz. Ddc Controller Shall Have Battery Backup For Atleast 10 Days.All Ddc Controllers Shall Be Provided With Hinged Doors With Locking Facility. Apart From The Controllers, The Enclosers Shall House The Terminal Blocks, Load Relays And Associaetd Equipment. The Internal Wiring In The Enclosure Shall Be Factory Wired. The Packaging Shall Be Such That Complete Installation Of The Field Equipment And Field Wiring Can Be Done Prior To The Installation Of The Electronics. The Controller Shall Be Independent In Operation And The Failure Of Any Other Device / Controller Or The Operator Workstations, Shall Not Cause Any Disruption To The Function Of The Rest Of The System. The Ddc Controllers Shall Have The Facility To Implement User Modifiable Time Schedules As Daily, Weekly, Monthly Annual Temporary Schedules. The Ddc Controllers Would Reboot Automatically On Resumption Of Power. Controllers Shall Not Require Manual Intervention For The Reboot Of The Controller Software. The Ddc Controllers Shall Have Integration Facility With Atleast 2 Ports Of Integration.Note - Should Have Suitable Volt Power Provision For Hvac Field Device Like- Picv, Mbfv, Modulatining Bfv, Othe Bms Field Device Ddc For Server Room, Hub Room Monitoring, Field Devices 18 Differential Pressure Transmitters For Measuring Pressure In Duct As Per Technical Specification. 19 Differential Pressure Switches For Indicating The Blower & Filter Status In Air As Per Technical Specification. 20 Differential Pressure Switches For Pump Status As Per Technical Specification 21 Duct Mount Temperature Sensor As Per Technical Specification 22 Duct Mount Temperature & Humidity Sensor As Per Technical Specification 23 Outside Air Temperature & Humidity Sensor As Per Technical Specification 24 Duct Mount Co2 Sensors 25 Outside Co2 Sensors 26 Wall Mounted Temperature + Rh Sensor 27 Immersion Type Temperature Sensor For Chilled Water Temperature 28 Bi-Level Switch For Hi-Lo Level Monitoring 29 Flameproof Level Transmitter 30 Water Pressure Transmitter 31 Ph Sensor 32 Tds Sensor 33 Current Relay 34 Networking Devices & Accessories Supply, Installation, Testing And Commissioning Of Layer 2 Unmanaged 10 / 100 Switch. The Switch Shall Have Work With Cat6 Armourded Utp Cable Within The Building Complete As Per Specifications And As Required For Bms Ddc Panel Networking. 16 Port Switch 35 Supply, Installation, Testing & Commissioning Of 12 Ports Full Loaded Liu Box With All The Required Sfp Module With Accessories Complete In All Respect Asapproved By Engineer In Charge Of Works. 36 Cables & Cable Trays, 2 X 1.5 Sq.Mm Annealed Tinned Copper Shielded Armoured Cable For Signal And Power As Per Specification. ( For I / O Points Hard Wired To Ddc ) . 37 Cables & Cable Trays, 4 X 1.0 Sq.Mm Annealed Tinned Copper Shielded Armoured Cable For Signal And Power As Per Specification. ( For I / O Points Hard Wired To Ddc ) . 38 Cables & Cable Trays, Cat 6 A Unarmoured Cables With Required Accessories Like Rj45 Connector Etc. 39 Cables & Cable Trays, 3 X 1.5 Sq.Mm Annealed Tinned Copper Shielded Armoured Cable For Signal And Power As Per Specification. ( Power Cable ) . 40 Cables & Cable Trays, Supply, Installation, Testing And Commissioning Of Networking Devices Including 6 Core Multimode Armored Ofc 41 1.6 Mm Thick Gi Cable Tray With Of The Following Sizes Complete With Angle Iron Supports / Hanging Arrangement Etc. And Cable Tray Supports Shall At Every 1 Meter.300 X 50 X 2 Mm 42 1.6 Mm Thick Gi Cable Tray With Of The Following Sizes Complete With Angle Iron Supports / Hanging Arrangement Etc. And Cable Tray Supports Shall At Every 1 Meter. 150 X 50 X 2 Mm 43 1.6 Mm Thick Gi Cable Tray With Of The Following Sizes Complete With Angle Iron Supports / Hanging Arrangement Etc. And Cable Tray Supports Shall At Every 1 Meter. 100 X 50 X 2 Mm 44 Magnahelic Gauges For Ot And Isolation Room Sitc, Magnahelic Gauge Housed In A Ss304 Front Cover ( 10-0-10 Pa ) Complete With 300Mm Length Pvc Tubing And Ss Perforated Nozzle For Ots / Isolation Room / Transplant Room. ( As Per Client Requirement Make List-Dwyer ) 45 Pvc Trunking - For Interior Conduits Supply And Installation Of Pvc Trunking With Cover Between Bms Room False Ceiling And Bms Components. 175 Mm Wide 46 20Mm Dia Hm Frls Pvc Conduit. ( 2 Cables Of 2C Or 1 Cables Of 4C Shall Be Limited To This Conduit ) Note : Cables Running Inside The Conduit Shall Not Be Run In Cable Trays.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 05-12-2023 Date Extenssion1 Date 08-12-2023
2 08-11-2023 Amendment in Contract and Clarification on Pre-Bid Queries Other 29-11-2023
3 23-11-2023 Clarification on BoQ and Tender Submission Other 29-11-2023
4 27-10-2023 Pre bid meeting link Other 29-11-2023

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail