}

Tender For Repair/Maintenance Of Cental Ac Plant At Ralawas Under Ge Banar, Jodhpur-Rajasthan

Military Engineer Services-MES has published Tender For Repair/Maintenance Of Cental Ac Plant At Ralawas Under Ge Banar. Submission Date for this Tender is 18-11-2023. HVAC Tenders in Jodhpur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

40344279
Corrigendum : Tender For Repair/Maintenance Of Cental Ac Plant At Ralawas Under Ge Banar
Open Tender
Indian
Rajasthan
Jodhpur
18-11-2023

Tender Details

Tender For Repair/Maintenance Of Cental Ac Plant At Ralawas Under Ge Banar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-Nov-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 13-11-2023
2 13-Nov-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 18-11-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 14860.0 /-
Tender Value
INR 7.43 Lakhs /-

BOQ Items

Name of Work: REPAIR/MAINT OF CENTRAL AC PLANT AT RALAWAS UNDER GE BANAR
Sl. No. Item Description
1Preventive maintenance/routine checking of central AC plant equipments like Chiller system, AHU, cooling tower items, motor/pump sets, LT control paneland otherconnected machinery /equipments and rectify minor defects during observed checking by exeperienced high skilled refrizeration mechanic OR reported to concern JE /Engr-in-Charge if major defects noticed. Contractor shall arranged/deployed a well exeperienced high skilled refrizeration mechanic as on required basis for the above routine checking of central AC plant as directed by Engr-in-Charge.The following mechinary/equipments are to be checked during site visit for preventive maintance of central AC plant:-
2EQUIPMENT DETAILS:- a) Chiller Sysem : 3 Nos.Capacity : 85 TR.Compressor Make & Model : Danfoss , SY300A4PBE (3x4 Nos.)Motor rating : (3x15)HP. b) Condensor Water pump : (3x4Nos).Make & Model : Mater Platt, 125*100-250, ET-150 19.Motor rating : 3Nosx9.3 KW. c) Chilled Water pump : 2 Nos. motor rating : 5.5 KW d) AirHandling Unit : 15 Nos.Make & Model : Blue star. e) Cooling Tower: 3 Nos.Make: Suthern (f) Other Connected Equipmets to all above CentralAC plants as under- i)Refrigerant controls like Pressure Gauges, Pressure switches, Thermostats & Solenoid valves. ii) Chilled water pipe lines & its control valves. iii) Connected air ducting, dampers, grills, air diffusers and insulation both acoustic and thermal. iv) Connected instrumentation, controls & cabling and filling of refrigerant as existing.
3Recovery for Non timely deployment of Trademan:- (a) The quoted rate is deemed to be inclusive of Attending to emergency complaints/break-down by employing Ref Mechanic/trademan as required within the quoted rates. (b) Contractor will be informed telephonic call /SMS/What"s up chat for deployment of trademan. After getting information to contractor, trademan shall have to be deployed wihin 24 Hrs failing which the recovey @Rs 650 per day (Maximum Rs 10000/- per event) for non deployment of trademan services will be imposed against contractor by the Deptt. (c) The firm has to attend the unscheduled service calls as and when requiredfor locating the faults and rectify the same immediately. The contractor should attend the breakdown of plant on priority basis. Records of the break down should be maintained by him as directed by Engr-in-Charge.Efforts should be made to restore working of plant so that regular air conditioned supply to users is maintained. If need be, the extra workmen shall be arranged by the contractor without any extra coast. (d) The corrective/breakdown maintenance has to be carried out any time during 24hrsX 7days inclusive of all Sundays & Holidays. (e) Replacement of spare parts will be measured and paid seperately under relevant items of schedule.
4M&L for strip opening of condenser cover of both sides including disconnecting of water pipe lines for inlet and outlet of the condenser of each plant.Removing scale/sludge precipitated in the copper tube by push and pull method with iron rod connected with steel wire brush of suitable size as per condenser copper tube size at the entire length of condenser and scraping down the sludge precipitated inside the tube. Closing both side of condenser and circulating the descaling solution, supplied in sealed containers, by mono block pump set after mixing it in water in ratio of 1:5 in all tubes of three condenser of each plant through the circulating pump and allow to hold it for 30 minutes for chemical reaction. Opening the condenser from both sides and clean with iron rod connected with nylon brush of suitable size as per condenser copper tube size at the entire length of condenser ensuring that descaling process has been complete; then closing the condenser at both ends and circulating clean water in all the tubes of three condensers of each plant and draining out the same. These processess have to be continued till the tubes are of scales to the complete satisfaction of Engr-in-Charge including fixing new gasket for both ends of the three condensers of each plant, tighten with new nut end bolts. The job also includes Material and labour for making leak proof refrigerent system by vaccumising with in 7.6 mm HG carried out using N-2 gas and maintaining for three hours; at the end of this period vaccum should be maintained for 24 hours complete all as specified and directed by Engr-in-Charge for AC plants of 3X85TR capacity. Note :- (a) Supplying the chemical solutionfor descaling is included in the unit rate quoted. (b) Strength of descaling solution shall be measured with pH paper and if the strength is less than 30%, then the descaling has to be done again by the contractor at his own cost to achieve the desired level of pH and nothing shall be payable extra on this account.
5Supply ( in company sealed cylinders of any capacity) and charging refrigerent gas R-407C for filling in 3 x 85 TRACcompressor as per requirment complete all as directed by Engr-in-Charge. Note: If the recharged refrigerent gas is leaked within 45 days of running of AC plant, the contractor shall recharge gas (including supply) without any extra cost to department.
6M&L for topping up/charging compressor oil non freezing type (factory sealed containers) in compressor units complete all as specified and directed by Engr-in-Charge.
7Supply and fix in replacement "V" Belt size of A-26 as per sample of existing specifications complete all as specified and directed by Engr-in-Charge.
8M&L fordisconnecting, strip opening, taking down burnt out motor from its base and transporting the motor to workshop and back.Refixing, testing and commissioning the same on full load, after carrying out the following repairs - (i) opening the side covers and removing the rotor and cutting/ removing the burnt coils / winding from stator, (ii)Cleaning the slots carefully, (iii) Rewinding the stator using super enamelled copper conductor wire with same size, number of coils, number of turns / coils as per data acquired from the old burnt motor,including varnishing of two coats, drying using electric furnace, (iv) Testing the coils for there continuity and no current passing through the stator core, (v) Dynamic testing of the rotor and alignment of the main shaft and ensure that no imbalance vibtrations, (vi) Re-assembling the rotor and connecting the end terminals to the terminal plate of the motor, closing the ends with side covers. (vii)Testing and commissioing theelectric motor connecting to the electric supply to its full load by connecting the compressor, (viii) Renewal of Bolts, nuts and washers for motors of following size - Note :- Parts renewed i.e Ball bearing shall be measured and paid separately. However cost of filling of grease and oiling shall be deemed to be included in quoted rate.
915 HP
1012.5 HP
117.5 HP
122.5 HP
131.5 HP
14Strip openiningof existing Monoblock pump set with motor 1.5 HP to 15 HP, 3 Phase, 415 Volts, servicing of pump and motor by opening of pump, machining of pump shaft, renewal of gaskets, gland packing, Gun metal bushes, greasing of bearing complete all as directed. Note:- Renewal of Ball bearing and motor winding shallbe measured and paid separately.
15Taking out unserviceable pipes and supply and fixing Mild Steel medium grade pipe of following dia, connecting, welding, smoothing and making leak proof all as per site requirment and as directed by Engr-in-Charge including testing complete.
1640mm dia MS pipe
1765mm dia MS pipe
18100mm dia MS pipe
19M&L for strip opening of blower shaft of AHU of existing capacity by removingthe belt and pulley, blower drum, dismantling the shaft and carrying out the necessary jobs at workshop including transportation (To and Fro) like welding, turning, grinding, etc. to have it"s original dimension including balancing of the shaft and refitting it in AHU, reassembling the blower, pulley, etc with new bearing of existing size, testing and commissioning the AHU for satisfactory operation complete all as specified and as directed. NOTE - Bearing to be replaced will be paid and measured under the relevant item of this schedule.
20Removing of all Alpha filters of AHUfrom their existing positions and laying out the filters at site for refixing after cleaning them including cleaning of AHU cooling coil using chemical with water jet/ brass brush in-order to remove all type of sludge/dust precipitated on the coil and filter without any damage to the copper cooling coil and then washing the cooling coil with fresh water and then air blowing the same to the complete satisfaction of Engr-in-Charge. Cooling coil drain water line shall be clean, if any type of obstacle is there in the flow of water, iron body of the AHU inside and outside shall be scrapped down and rubbed out with sand paper including applying one coat primer over a coat of synthetic enamel paint including part of duct portion in the AHU all to the complete satisfaction of Engr-in-Charge.
21M&L for Painting on all chiller & condenser pipes with colour code & Marking of flow of fluids/gas on Chillar plant/pipes inside the pump room complete for 3 unitas specified and directed.
22M&L for Servicing of exisiting various size of motors & pump sets and compressors of central AC plantincluding greasing of DE/NDE side & cleaning to remove any scales, dust particles, grease, oil marks etc complete all as specified and directed.
23M&L for Pressure testing of entire system of AC plant comprising of three set of condenser, compressor and circulating system with CO2/Nitrogen gas and retain the gas in the system for three days. After three days checking the system to check for any leakage or reduction in the scale of pressure. If any leakage(s) is (are) found, it(they) shall be located and arrested by soldering or by taking an appropriate measure(s) to stop the leakage permenantly complete all as directed.
24Dismantling inlet & outlet connection of water pipe lines, wiremesh all-around the cooling tower,PVC fins, CT fan and motor, PVC water storage tank and incoming connection of electric supply and other related items all as per site requirement complete for cleaning works and replacement ofthe wiremesh all around the cooling tower as per directed by EIC .
25Cleaning the cooling tower by scraping with wire brush, washing powder and other solvent by removing the deposited impurities such as silt, dust particles mud/sand inside the dome and around the fins, on wiremesh, main shaft, etc and other connected items all as specified and directed by Engineer-in-Charge.
26S&F in replacement fresh air ventilator made out of MS grill and angle iron frame with louvers on AHU without any damage to the existing wall and finishing the surfaces to match with existing one, complete all as specified and directed by Engr-in-Charge.
27Servicing and maintenance of Rapid cool cap 110 KW Hot water generator (total- 2 Nos) completeby opening the existing assy and draining out complete water including cleaning of the connected components like container, checking of serviceability of heating element, pressure gauge, etc. and reassembling and testing the same after replacement of unserviceable spares all as specified and as directed. NOTE - Spares to be replaced will be measured and paid separately under the relavant items of this schedule.
28Supply only in repairheating element for 110KW hot gen approved by EIC
29Supply only in repair timer and other connected accessories.-01set approved by EIC
30Supply only in repair onlythermostat for 110KW hot gen approved by EIC
31Taking out the defective dehumidification pump set 1.5 HP to 2.5 HP, 230 volts alongwith motor from the AHU ( CSU Type)by disconnecting electrically and mechanically, shifting to civil workshop,dismantling the same to remove burnt out windings and defective parts, rewinding the motor with super enemelled copper winding wire including all insulating materials all as per existing, varnishing,drying etc complete and replacing the bearings,bushes as per existing size replacing the pump impeller, reassembling the same and shifting to original site, reconnecting electrically and mechanically and testing for proper working complete all as specified and as per directed by EIC .
32Taking down unserviceable AC ductand Supply ,fabricating, assembly and erection of galvanised sheet of 24 gauge with C & SS rectangular/ square duct made out of "L" shaped hollow profile, duly factory boxed, incl all accessories such as Corner, Cleat, Carriage bolt, gasket and appropriate seal to make leake proof and on longitudinal joints including complete insulation etc all as directed by Engr-in-charge.
33Supply & fix replacement of water pressure gauge 0-150 Kg/sq cm suitable for fixing with 150 mm dia water circulating inlet & out let pipeby means of proper welding and connection with checking the running water pressure as per specification all as directed by engineer in charge. Make H Guru or equivalent of approved make complete all as specified and directed.
34M&L for replacement of water temp gauge dial type 0-120 degree F make H Guru or equivalent of approved make complete all as specified and directed
35Supply and fix in replacement of flexible rubber coupling for 85TR compressor & upto 20HP elecric motor, 415volts, 3 phase of existing specification complete all as specified and directed by Engr-in-Charge.
36Supply & fix in replacement CTcoil rating 250/5 amps, 415 volts of as per existing specification and make complete all as specified and directed by Engr-in-Charge.
37Supply and fix in replacement ON/OFF Push button switch with two push buttons of existing specification complete all as specified and directed by Engr-in-Charge.
38Supply and fix in replacementof pre- filter, pleated EU4/G4 type, GI frame, media-non wooen synthetic media + alluminium jalli, efficiency 90% down to 10 Micron size 590mm x 590mm x 50mm for central AC plant AHU with new one complete all as specified and directed by Engr-in-Charge.
39Supply anfd fix in replacement of pre filter, pleated EU4/G4 type, GI frame, media-non wooen synthetic media + alluminium jalli, efficiency 90% down to 10 Micron size 590mm x 290mm x 50mm for central AC plant AHU with new one complete all as specified and directed by Engr-in-Charge.
40Supply and fix in replacement indicator holder complete with lamps for RYB phase, 415 volts, 50 HZ AC complete all as specified and directed by Engr-in-Charge.
41Supply and fix in replacement Electronic sensor suitable for 85 TR compressor unit (for chiller & condenser unit) of existing specifications and makecomplete all as specified and directed by Engr-in-Charge.
42Supply and fix inreplacement of microprocessor electronic control cardchiller PCB suitable for 85 TRScroll chiller Cat part No EACOZ0060 of existing specifications and makecomplete all as specified and directed by Engr-in-Charge.
43S&F replacement of thermostatic expansion valve of 3x85 TRworking on R-407C ( Ecofriendly) suitable forAC plant ( Make - Blue Star)including collecting the refrigerent in the empty cylinders arranged by Contractor at his own resources by any means , cutting, welding, brazing, renewal of gasket, nuts, bolts and washers etc. complete all as specified and directed.by Engr-in-Charge.
44Supply and fix in repair ofHigh pressure and low pressure control (HP&LP) switch suitable for water Cooled central type AC unit as per sample complete all as specified and directed.by Engr-in-Charge.
45S&F in repairs Digital volt meter 96 x 96 mm square flush mounted type 0-500 volts, 3 phase, accuracy class 1.0 with selector switch all as specified.and directed.by Engr-in-Charge.
46S&F in repairs Digital Amp meter 96x96mm square flush mounted type 0-100 Amps, 3 phase, accuracy class 1.0 with selector switch and ring type resin cast suitable rating CT all as specified.and directed.by Engr-in-Charge.
47Supply and fix in repair Thermometer 0-60 Degree centrigrade suitable for fixing with 150 mm dia water circulating pipe by means of proper welding and connection with checking the running water temperature as per specification all asdirected.by Engr-in-Charge.
48M&L for digital type electronic temperature meter sensing the temperature from in side the user room and display on outside the AHU including wiring for sensing cable in case and copping, complete all as specified and directed.
49Supply and fix in repair suction pressure sensor suitable for 3x 85 TR AC plant complete all as specified.
50Supply and fix in repair discharge pressure sensor suitable for3x 85 TR AC plant complete all as specified.
51Supply and fix in repair oil pressure sensor suitable for 3x 85 TR AC plant complete all as specified.
52S&F air flow switch suitable for Central type AC plants complete all as specified.
53S&F anti freeze switch suitable for Central type AC plants complete all as specified.
54M&L for replacement of water flow switch type, IPS industrial pressure switch complete all as specified and directed. make: INDFOSS or equivalent as approved.
55S&F in repair single phase preventer 230 Volts complete all as specified.
56S&F ball bearing of different sizes of motor as per existing size complete all as specified.
57Taking down old unsv fins/cells of cooling tower and supply and fix PVC fins(honey comb) suitable for fiber glass cooling towercomplete suitable forupto 85TR of AC plant as specified.
58M&L PVC eliminator from cooling tower of capacity 3x85 TR complete all as specified and directed by Engr-in-Charge.
59Supply and fix in replacement air release valve of gun metal 15 mm dia of existing specification and make complete all as specified and as directed by Engr-in-Charge.
60Supply and fix in replacement butterfly valvewith handle made out of brass/gun metal of 100 mm dia of existing specification and make complete all as specified and as directed by Engr-in-Charge.
61Supply and fix in replacement butterfly valvewith handle made out of brass/gun metal of 80 mm dia of existing specification and make complete all as specified and as directed by Engr-in-Charge.
62Supply and fix in replacement butterfly valvewith handle made out of brass/gun metal of 50 mm dia of existing specification and make complete all as specified and as directed by Engr-in-Charge.
63Supply and fix in replacementdryer for liquid line 5/8"" Sutaible for 85 TR compressor complete all as specified and as directed by Engr-in-Charge.
64Supply and fix in replacement Gate valve 40mm dia made of gun metal complete all as specified and directed by Engr-in-Charge
65Complete removing of paint from old painted surfaces of steel and preparation of steel surfaces of AC plant cooling tower of 85 TR complete including all pipe lines of any dia or size with accessories,and applying two coat ofsynthetic enamel paint over a coat of red oxide primer by spray paintingto protect extra spreading paint from manufacturers stickers and plates complete all as specified and directed.
66S&F in replacement First Aid box andchart with clear glass cover & wooden frame of existing size complete all as specified and directed and as per sample.
67Supply and fixin replacement solinoid coil suitable for 3x85 TR compressor complete all as specified and directed by Engr-in-Charge.
68Servicing ofservo auto manual voltage stabilizer of capacity 300KVA 415 V 3 phase opening the existing assy andcleaning of the connected components,Checking electrical wiring connection,checking of serviceability of Contractor ,coil etc. and reassembling and testing the same after replacement of unserviceable spares all as specified and as directed. NOTE - Spares to be replaced will be measured and paid separately under the relavant items of this schedule.as directed by Engr-in-Charge.
69Supply only in repair contractor kit 4 Pole AC 415V as per existing rating upto 80 Amp complete all as specified.
70Supply only in repair Coil 4 Pole AC 415V as per existing rating upto 80 Amp complete all as specified.
71M&L for filteration / dehydration of transformer oil at site so as to achieve diaelectric strengh not less than 30kv when tested at 4mm air gap complete all as specified.
72Supply and filling transformer oil of diaelectric strengh not less than 30KV in topping up level of voltage stabiliser complete all as specified.
73M&L for cleaning of voltage stabilizer body with cleaning agent carefully of capaciity 300 KVA installed on platform and painting two coats of synethtic enamel paint of approved makes all as directed by Engr-In-Charge.
74S&F in replacement MNX-A2type power Contactor, 3 pole,415 V, 50Hz, with auxulary Contact 2 NO+2NCsuitable for Non-Inductive or Slightly Inductive ,Resistive Load (AC1- up to 80 Amps rating complete all as specified.
75S&F in replacement power Contactor, 3 pole,415 V, 50Hz, with auxulary Contact 2 NO+2NCsuitable for Non-Inductive or Slightly Inductive ,Resistive Load (AC1- uptp 80 Amps rating (as per model No LC1DT32) complete all as specified.
76S&F in replacement of control Voltage contactor mechanical interlocks horizontal mounted & configuration415 V, 50HZ, AC 1NO+1NC suitable for water cooled chillerControl panelAC Coilcontroler make :- Siemens/L&T,all as specified and directed by engineer in charge.
77Supply and fix in repair 3 pole power contactor rated current AC1 32A and AC3 32 A with auxiliary contact block, 3 phase 415 volts, with coil voltage 220 volts complete as per existing modelall as directed.
78Supply and fixing in repairs front mounting add-on-aux control block MNX/MCX 9-80, MCX 01-23 CS 94114 of make L&T complete all as directed as per existing size
79Supply and fixing in repair motor protection circuit braker (MPCB) rotary type with over load + short corcuit protectionrating upto 30 Amps cat No ST419140000 of L&T or equivalent complete all as specified.
80Supply and fix in repair Over load relay Type MN-2 range 9Amp to 25Amp complete all as directed.
81Supply and fix in repair Over load relay Type MN-2 range 3Amp to 8 Amp complete all as directed.
82S&F in replacement of 4 Pole MCCB 200Amp 415V adjustable type with breaking capacity 36KA complete all as specified.
83Supply and fix in replacement Volt meter 0-500 volt, rectangle of size 96x 96 sqmm 3 phase 440 volt, 50 Hz ACof existing specification and make complete all as specified and as directed by Engr-in-Charge.
84S&F in repair 4 Pole contactor coil 240 V 50Hz suitable for MCX44 complete all as specified.
85S&F in repair 4 Pole contactor Kit240 V 50Hz suitable for MCX44 complete all as specified.
86M&L for Plaster of Paris 30mm thick overinsulated pipe of dia 80mm to 150mm of Chilled water pipe of AC Plant above ground level as per specified as dirtected
87S&F in repair air Purzzer Valve of suitable size as per existing all as specified .
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail