}

Construction Of Sheds (Porta Cabins For P-17A Ships) And Associated Works At Grse Foj Unit, kolkata-West Bengal

Garden Reach Shipbuilders And Engineers Limited-GRSE has published Construction Of Sheds (Porta Cabins For P-17A Ships) And Associated Works At Grse Foj Unit. Submission Date for this Tender is 10-11-2023. Shed Construction Tenders in kolkata West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

40307958
Corrigendum : Construction Of Sheds (Porta Cabins For P-17A Ships) And Associated Works At Grse Foj Unit
Open Tender
Indian
West Bengal
kolkata
10-11-2023

Tender Details

Construction Of Sheds ( Porta Cabins For P-17A Ships ) And Associated Works At Grse Foj Unit

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 01-Nov-2023 CORRIGENDUM-I-ET-2020-Date-TC Date 10-11-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 510000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Construction of Sheds (Porta Cabins for P-17A Ships) and associated works at GRSE FOJ Unit
Sl. No. Item Description
1Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
2Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. (a) Depth of excavation not exceeding 1,500 mm.
3Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
4Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.:- In ground floor / upto 150 mm. thick
5Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars (a) In ground floor including roof
6Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
7Supplying ready mixed concrete of M 20 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cum of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [Cement to be supplied by the Manufacturer or supplier] :- In ground floor and foundation. (i) Without approved concrete pump
8Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
9Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground. floor/upto 4 mi) Tor steel/Mild Steel :- SAIL/ TATA/RINL
10Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
11Ordinary Cement Concrete (mix 1:1.5:3)with graded stone chips(20mm nominal size) excluding shuttering & reinforcement. (As per Rate Analysis)
12Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing the hole with cement concrete or cement grout as directed. (ii) 20 mm dia bolt.(b) 450 mm long
13MS structural work in columns beams etc with simple rolled structure members…i) for structural member of specified section weight less than 22.5kg/m(Consider 3rd Corrigenda & Addenda, P-84,SL-01)
14Supplying, fitting & fixing Zn-Al Coloured sheet, 0.5 mm thick
15Priming one coat On steel or other metal surface:
16Painting one coat (b) On steel or other metal surface, other than hi-gloss,(iv) Two coats (with any shade except white)
17Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised “C” clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc (I) 50 mm. x 50 mm. x 8 g
18Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
19Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. (a) Depth of excavation not exceeding 1,500 mm.
20Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.:- In ground floor / upto 150 mm. thick
21Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
22Supplying ready mixed concrete of M 20 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [Cement to be supplied by the Manufacturer or supplier] :- In ground floor and foundation. (i) Without approved concrete pump
23Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor):-(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
24Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m:-(i) Tor steel/Mild Steel :- SAIL/ TATA/RINL
25Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail