Gorakhpur Municipal Corporation has published Tender For Selection Of System Integrator (Msi) For Integration Of Cctv Surveillance With Existing Itms Control Room. Submission Date for this Tender is 04-11-2023. CCTV System Tenders in gorakhpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 19-Oct-2023 | other corrigendum | Other | 28-10-2023 |
2 | 25-Oct-2023 | corrigendum | Other | 28-10-2023 |
3 | 28-Oct-2023 | Date Extended | Date | 04-11-2023 |
Sl. No. | Item Description |
1 | CCTV Surveillance |
2 | 49 Inches Video wall Panel |
3 | Push-Pull Video wall Mounts |
4 | 10 Meter HDMI Cable 4k support |
5 | Installation & Commissioning |
6 | 2X3 Video wall Controller |
7 | Workstation |
8 | Ring Switch and SFP |
9 | L3 Switch with MPLS Router 1Gx10 Port |
10 | Rack 42U |
11 | Server IP Gateway for SMS Feedback |
12 | IPPBX with IVR and SMS Feedback support |
13 | Lan Wiring 6 Node with IO and Cable |
14 | Online UPS 1 KVA |
15 | Offline UPS 10 KVA |
16 | Battery 180AH |
17 | Battery 26AH |
18 | Electrical Wiring for computer |
19 | Installation, Provision and User Training |
20 | Customised VMS (Video Management System) 5 Years License |
21 | Customised HMS (Health Monitoring System) 5 Years License |
22 | LLD Integration from Operation Trinetra Cameras |
23 | Fiber connectivity laying with Ring |
24 | Firewalls |
25 | PA Transmitter System 20Kms to 25Kms Range |
26 | Fall ceiling, Wall panelling, 4 Cassette AC 1.5 ton, Ceiling LED Light, Electric Wiring, Floor Mat, 6 Tables, 12 Chairs, CCTV Camera, 2 Sofa, 1 Centre table, 25 Kva Genset |
27 | Civil Works of control room including Site Assessment and Preparation, Layout and Space Design, Wall Partition, Glass Partition, Wall Panelling, Premium Flooring and Finishes, False Ceiling, Ceiling and Lighting, AC and Environmental Control, Electrical and Data Infrastructure. (Approx Area 80 Sq.m) *In case of major variation in the area the payment shall be made on pro-rata basis. |
28 | Comprehensive OPEX for 1st year |
29 | Comprehensive OPEX for 2nd year |
30 | Comprehensive OPEX for 3rd year |
31 | Comprehensive OPEX for 4th year |
32 | Comprehensive OPEX for 5th year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail