| 1 | Making Bandha with Sand bags, soil and other ways … etc …………………. Including all complete. |
| 2 | Surface dewatering of fundation including all arrangement by 10 KV diesel pump set PWD chap-19 SI No. 11 |
| 3 | Surface dewatering of fundation including all arrangement by 20 KV diesel pump set PWD chap-19 SI No. 11 |
| 4 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). PWD 694 |
| 5 | Dismantling cement concrete orbrick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters |
| 6 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance ............. all complete. |
| 7 | Earth work in cutting ……………………………… including all complete. |
| 8 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge.(PWD SOR 2017-18, Chepter-3,Item No. 231a ) |
| 9 | Supply 900 mm dia RCC NP-3 hume pipe for naala diversion …………………. Including all complete. |
| 10 | Laying and fixing of N.P.-3 Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance (labour only) excluding cost of pipes/collars. …………………. Including all complete. |
| 11 | Earth work cutting/ filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) |
| 12 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 13 | Hiring hydra machine for shifting pipe .......... including all complete. |
| 14 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work in Foundation and floors. PWD- 4.1 |
| 15 | Providing and laying in position 1:1.5;3 cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (Sl No. 5.1 |
| 16 | Reinforced cement concrete work in1:1.5:3 in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). PWD- 5.2 |
| 17 | Mild steel or iron work in heavy sizes such as built up gates record rack, roof work, gates etc. brought to required form including drilling holes revitting or welding where necessary, and also including supply of steel bolts, nuts, wastage etc. and their fixing require for proper completion of the work. (Sl No. 503) |
| 18 | Supply and laying Red sand stone ………………. Including all complete. |
| 19 | RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). PWD - 5.1 |
| 20 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504) |
| 21 | M-150 B/W in 1:4 Cement and coarse sand of 2.2 fineness modulous mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (S.I. No. 305) |
| 22 | 12 mm thick cement plaster in single coat on fair side of single or hair brick well for interior plastering upto floor two level including brick wall for plastering upto floor two level including internal rounded angles not exceeding 80 mm in girth,hamfers and finished even and Stooth. No. extra for mixing any 1 cement : 3 coarse sand(S.I. No. 17.58 |
| 23 | Proving and laying unreinforced cement concrete in 1:1.5:3 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work including all complete. |
| 24 | Proving and laying cement concrete in 1:2:4 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work. (Sl No. 279) |
| 25 | Shifting water pipe line ……………. Including all complete |
| 26 | Making and grouting Manak Board made of Mild steel including written contentt.......... including all complete. |
| 27 | Construction of shilapatt/Inaugration Board with brick work and Granite stone including written content etc........... including all complete. |
| 28 | Add 18 % G.S.T |