}

Tender For Fixing Of Rate Contract For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda For The Year 2023 24, doda-Jammu And Kashmir

Power Development Department has published Tender For Fixing Of Rate Contract For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda For The Year 2023 24. Submission Date for this Tender is 12-10-2023. Transformer Supply Tenders in doda Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

40026073
Tender For Fixing Of Rate Contract For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda For The Year 2023 24
Open Tender
Indian
Jammu And Kashmir
doda
12-10-2023

Tender Details

Fixing Of Rate Contract For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda For The Year 2023 24- 1 Unloading Of Pcc Poles 11 Mtr Long 2 Unloading Of Pcc Poles 9 Mtr Long 3 Unloading Of Pcc Poles 8 Mtr Long 4 Unloading Of St Poles 13 Mtr Long 5 Unloading Of St Poles 11Mtr Long 6 Unloading Of St Poles 9 Mtr Long 7 Unloading Of St Poles 8 Mtr Long 8 Loading Of Pcc Poles 11 Mtr Long 9 Loading Of Pcc Poles 9 Mtr Long 10 Loading Of Pcc Poles 8 Mtr Long 11 Loading Of St Poles 13 Mtr Long 12 Loading Of St Poles 11Mtr Long 13 Loading Of St Poles 9 Mtr Long 14 Loading Of St Poles 8 Mtr Long 15 Dragging Of Pcc / St Poles At An Average Distance Upto 50 Mtr For Stacking Toaccesibleplace For Loading / Unoading Purpose And Its Stacking 16 Unloading Of / New Acsr Conductor 17 Loading Of Old / New Acsr Conductor 18 Shifting Of Old / New Acsr Conductor From Unloading Site To Stacking Siteat An Average Distance Upto 50 Mtr And Its Stacking 19 Shifting Of Old / New Acsr Conductor To Other Place For Making Space For Other Store Material At An Average Distance Upto 50 Mtr And Its Stacking 20 Unloading Of 25 Kva Transformer ( New / Write Backtransformer ) 21 Unloading Of 63 Kva Transformer ( New / Write Backtransformer ) 22 Unloading Of 100 Kva Transformer ( New / Write Backtransformer ) 23 Unloading Of 250 Kva Transformer ( New / Write Backtransformer ) 24 Unloading Of 400 Kva Transformer ( New / Write Backtransformer ) 25 Unloading Of 630 Kva Transformer ( New / Write Backtransformer ) 26 Loading Of 25 Kva Transformer 27 Loading Of 63 Kva Transformer 28 Loading Of 100 Kva Transformer 29 Loading Of 250 Kva Transformer 30 Loading Of 400 Kva Transformer 31 Loading Of 630 Kva Transformer 32 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 33 Dragging Of Existing / New63 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 34 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 35 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 36 Dragging Of Existing / New / Damaged400kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 37 Dragging Of Existing / New / Damaged630kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 38 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 39 Dragging Of Existing / New63 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 40 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 41 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 42 Dragging Of Existing / New / Damaged400kva Tranformer At An Average Distance Upto 50 Mtrfor Making Space For Other Store Material And Its Stacking 43 Dragging Of Existing / New / Damaged630kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 44 Unloading Of Channel / Angle / Flat Iron 45 Loading Of Channel / Angle / Flat Iron 46 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 47 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 48 Unloading Of Link / Knife / Hg / Do / La Set 49 Loading Of Link / Knife / Hg / Do / La / Go Set 50 Unloading Of Ct / Pt Unit 51 Loading Of Ct / Pt Unit 52 Unloading Of Dpc Cu / Al Wire 53 Unloading Of Bush Rods And Other Allied Workshop Material 54 Unloading Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rodsetc ) 55 Loading Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods / Cu / Al Wire / Bushrods Etc Etc ) 56 Shifting Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods Etc ) From Unloading Site To Stacking Site And Stacking Properly 57 Shifting Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods / Al / Cu Wire / Bush Rodsetc ) For Making Space For Other Store Material 58 Unloading / Loading Of Bammbooladder 59 Unloading / Loading Of Single / Three Phase Meters 60 Unloading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 61 Unloading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 62 Loading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 63 Loading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 64 Unloading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 65 Unloading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 66 Loading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 67 Loading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 68 Shifting Of Ab / Xlpe25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly 69 Shifting Of Ab / Xlpe120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly 70 Loading Of Aluminium And Copper Wire 71 Loading Of Bush Rods And Other Allied Workshop Material 72 Unloading / Loading Of Single Phase / Three Phase Meters 73 Stacking Of Single / Three Phase Meters 74 Unloading / Loading Of Straight Jointer Kit / Heat Shrinkable Kit For Ab / Xlpe Cables Of Ht / Lt Lines 75 Unreeling Of The Acsr Dog / Rabbit, Weasel / Squirell Conductor From The Drum, Measuring , Cutting , Bundling Etc 76 Unreeling Of Thexlpe / Ab / Pvc Single Core Cables Ofsizes From The Drum, Measuring , Cutting , Bundling Etc 77 Checking / Counting / Meggering Of Line / Hardware Materials Viz Disc Insulators With Fittings, Pin Insulators With Pins Etc 78 Checking / Measuring / Weighing Of Line / Workorkkshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu / Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc. 79 Unloading Of Cement Bags 80 Carrigae Of Cement Bags From Unloading Site To Stacking Site ( Upto 50 Mtr ) 81 Stacking Of Cement Bags 82 Loading Of Cement Bags 83 Cutting Of Green Vegetable Bushes , Wild Grass, Treesin The Store To Avoid Any Mishappening Of Untoward Incidents 84 Carriage Of Green Vegetable Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store 85 Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning 86 Insertion Of New Fencing Posts In The Store For Repair Of Fencing 87 Dismantling Of Existing Mesh Fencing 88 Fixing Of Mesh Fencing 89 Fixiing Of Cgi Sheets 90 Dismantling Of Cgi Sheets 91 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspectionsof Transfomers 25 / 63 / 100 Kva 92 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspectionsof Transfomers 250 / 400 / 630Kva 93 Lifting Of Unserviceable Items Like, Damaged Transformers ( Outer Frame Of Dts ) , Broken Insulators Of Sorts, , Al / Cu / Scrap / Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct / Pts Sets From Existing Place To Another Suitable Place And Its Stacking 94 Painting ( Red Oxide / Aluminium Paint ) Offabricated Material. 95 Unloading Of Old Loose Conductor And Making Bundles 96 Checking & Maggeringof 11Kv La Sethg Set Go Set Ct / Pt Unit 97 Fabrication Of Channel Cross Arms Of Sorts From Ms Channel100x50x6 98 Fabrication Of Angle Iron Braces / Belts / Guard Netting Angles, Fencing Posts Etc From Angle Iron Of Sizes 99 Fabrication Of Channel Cross Arms Of Sorts From Ms Channel75x40x6 100 Fabrication Of Mukhi Clamps From Ms Flat ( Suitable For 9Mtr, 11Mtr And 13 Mtr Poles ) 101 Fabrication Of U- Clamps From Ms Flat 102 Drilling Holes Per Unit Hole 103 Fabrication Of Guy Rods From Ms Round Iron 104 Fabrication Of Earthing Plates , Cable Duct Cover From Ms Plate As Per Rec Standards 105 Fabrication Of Earthing Spikes From Ms Tor Steel Of Sorts As Perrec Standards 106 Fabrication Of Earthing Pipe From Gi Pipe And Welding Of Earthing Plate As Per Rec Standards 107 Painting ( Red Oxide / Aluminium Paint ) Of Fabricated Material.

Key Value

Document Fees
INR 1000 /-
EMD
INR 25000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Rate Contract for handling and fabrication of various materials in Divisional Stores at Doda, Electric Division-Doda JPDCL JAMMU for the FY 2022-23
Sl. No. Item Description
1Unloading of PCC Poles 11 Mtr Long
2Unloading of PCC Poles 9 Mtr Long
3Unloading of PCC Poles 8 Mtr Long
4Unloading of ST Poles 13 Mtr Long
5Unloading of ST Poles 11Mtr Long
6Unloading of ST Poles 9 Mtr Long
7Unloading of ST Poles 8 Mtr Long
8Loading of PCC Poles 11 Mtr Long
9Loading of PCC Poles 9 Mtr Long
10Loading of PCC Poles 8 Mtr Long
11Loading of ST Poles 13 Mtr Long
12Loading of ST Poles 11Mtr Long
13Loading of ST Poles 9 Mtr Long
14Loading of ST Poles 8 Mtr Long
15Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking
16Unloading of /New ACSR Conductor
17Loading of Old/New ACSR Conductor
18Shifting of Old/New ACSR Conductor from unloading site to stacking siteat an average distance upto 50 Mtr and its stacking
19Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking
20Unloading of 25 KVA Transformer(New/Write BackTransformer)
21Unloading of 63 KVA Transformer(New/Write BackTransformer)
22Unloading of 100 KVA Transformer(New/Write BackTransformer)
23Unloading of 250 KVA Transformer(New/Write BackTransformer)
24Unloading of 400 KVA Transformer(New/Write BackTransformer)
25Unloading of 630 KVA Transformer(New/Write BackTransformer)
26Loading of 25 KVA Transformer
27Loading of 63 KVA Transformer
28Loading of 100 KVA Transformer
29Loading of 250 KVA Transformer
30Loading of 400 KVA Transformer
31Loading of 630 KVA Transformer
32Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
33Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
34Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
35Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
36Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
37Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
38Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
39Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
40Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
41Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
42Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking
43Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
44Unloading of Channel/Angle/Flat Iron
45Loading of Channel/Angle/Flat Iron
46Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
47Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
48Unloading of Link/Knife/HG/DO/LA Set
49Loading of Link/Knife/HG/DO/LA/GO Set
50Unloading of CT/PT Unit
51Loading of CT/PT Unit
52Unloading of DPC CU/AL Wire
53Unloading of Bush Rods and other allied workshop material
54Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rodsetc)
55Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc)
56Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
57Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rodsetc) for making space for other store material
58Unloading/Loading of BammbooLadder
59Unloading/Loading of Single/Three Phase Meters
60Unloading of PVC Cable single core 95/120/185mmsq
61Unloading of PVC Cable single core 300/400/630mmsq
62Loading of PVC Cable single core 95/120/185mmsq
63Loading of PVC Cable single core 300/400/630mmsq
64Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
65Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
66Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
67Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
68Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
69Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
70Loading of Aluminium and Copper wire
71loading of Bush Rods and other allied Workshop material
72Unloading/Loading of Single phase/three phase meters
73Stacking of Single/Three phase meters
74Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
75Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc
76Unreeling of theXLPE/AB/PVC Single core cables ofsizes from the drum, measuring , cutting ,bundling etc
77Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc
78Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.
79Unloading of Cement Bags
80Carrigae of Cement Bags from unloading site to stacking site (Upto 50 Mtr)
81Stacking of Cement bags
82Loading of Cement Bags
83Cutting of Green Vegetable Bushes , Wild Grass, treesin the store to avoid any mishappening of untoward incidents
84Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store
85Straightening of tilted fencing posts in the store premises for repair of fecning
86Insertion of new fencing Posts in the store for repair of fencing
87Dismantling of existing mesh fencing
88Fixing of mesh Fencing
89Fixiing of CGI Sheets
90Dismantling of CGI sheets
91Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 25/63/100 KVA
92Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 250/400/630KVA
93Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
94Painting(Red oxide/Aluminium Paint) ofFabricated Material.
95Unloading of old loose conductor and making bundles
96Checking & maggeringof 11Kv LA setHG set GO set CT/PT unit
97Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
98Fabrication of Angle iron braces /Belts/Guard Netting angles, fencing posts etc from angle iron of sizes
99Fabrication of Channel Cross Arms of sorts from MS Channel 75x40x6
100Fabrication of Mukhi clamps from MS flat (suitable for 9mtr,11mtr and 13 mtr poles)
101Fabrication of U- clamps from MS flat
102Drilling holes per unit hole
103Fabrication of Guy Rods from MS round iron
104Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards
105Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards
106Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
107Painting(Red oxide/Aluminium Paint) of Fabricated Material.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail