Power Development Department has published Tender For Fixing Of Rate Contract For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda For The Year 2023 24. Submission Date for this Tender is 12-10-2023. Transformer Supply Tenders in doda Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Unloading of PCC Poles 11 Mtr Long |
2 | Unloading of PCC Poles 9 Mtr Long |
3 | Unloading of PCC Poles 8 Mtr Long |
4 | Unloading of ST Poles 13 Mtr Long |
5 | Unloading of ST Poles 11Mtr Long |
6 | Unloading of ST Poles 9 Mtr Long |
7 | Unloading of ST Poles 8 Mtr Long |
8 | Loading of PCC Poles 11 Mtr Long |
9 | Loading of PCC Poles 9 Mtr Long |
10 | Loading of PCC Poles 8 Mtr Long |
11 | Loading of ST Poles 13 Mtr Long |
12 | Loading of ST Poles 11Mtr Long |
13 | Loading of ST Poles 9 Mtr Long |
14 | Loading of ST Poles 8 Mtr Long |
15 | Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking toaccesibleplace for loading/Unoading Purpose and its stacking |
16 | Unloading of /New ACSR Conductor |
17 | Loading of Old/New ACSR Conductor |
18 | Shifting of Old/New ACSR Conductor from unloading site to stacking siteat an average distance upto 50 Mtr and its stacking |
19 | Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking |
20 | Unloading of 25 KVA Transformer(New/Write BackTransformer) |
21 | Unloading of 63 KVA Transformer(New/Write BackTransformer) |
22 | Unloading of 100 KVA Transformer(New/Write BackTransformer) |
23 | Unloading of 250 KVA Transformer(New/Write BackTransformer) |
24 | Unloading of 400 KVA Transformer(New/Write BackTransformer) |
25 | Unloading of 630 KVA Transformer(New/Write BackTransformer) |
26 | Loading of 25 KVA Transformer |
27 | Loading of 63 KVA Transformer |
28 | Loading of 100 KVA Transformer |
29 | Loading of 250 KVA Transformer |
30 | Loading of 400 KVA Transformer |
31 | Loading of 630 KVA Transformer |
32 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
33 | Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
34 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly |
35 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly |
36 | Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
37 | Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
38 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
39 | Dragging of existing /New63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
40 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
41 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
42 | Dragging of existing /New/Damaged400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking |
43 | Dragging of existing /New/Damaged630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
44 | Unloading of Channel/Angle/Flat Iron |
45 | Loading of Channel/Angle/Flat Iron |
46 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
47 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking |
48 | Unloading of Link/Knife/HG/DO/LA Set |
49 | Loading of Link/Knife/HG/DO/LA/GO Set |
50 | Unloading of CT/PT Unit |
51 | Loading of CT/PT Unit |
52 | Unloading of DPC CU/AL Wire |
53 | Unloading of Bush Rods and other allied workshop material |
54 | Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rodsetc) |
55 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc) |
56 | Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly |
57 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rodsetc) for making space for other store material |
58 | Unloading/Loading of BammbooLadder |
59 | Unloading/Loading of Single/Three Phase Meters |
60 | Unloading of PVC Cable single core 95/120/185mmsq |
61 | Unloading of PVC Cable single core 300/400/630mmsq |
62 | Loading of PVC Cable single core 95/120/185mmsq |
63 | Loading of PVC Cable single core 300/400/630mmsq |
64 | Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines |
65 | Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines |
66 | Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines |
67 | Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines |
68 | Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly |
69 | Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly |
70 | Loading of Aluminium and Copper wire |
71 | loading of Bush Rods and other allied Workshop material |
72 | Unloading/Loading of Single phase/three phase meters |
73 | Stacking of Single/Three phase meters |
74 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines |
75 | Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc |
76 | Unreeling of theXLPE/AB/PVC Single core cables ofsizes from the drum, measuring , cutting ,bundling etc |
77 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc |
78 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. |
79 | Unloading of Cement Bags |
80 | Carrigae of Cement Bags from unloading site to stacking site (Upto 50 Mtr) |
81 | Stacking of Cement bags |
82 | Loading of Cement Bags |
83 | Cutting of Green Vegetable Bushes , Wild Grass, treesin the store to avoid any mishappening of untoward incidents |
84 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store |
85 | Straightening of tilted fencing posts in the store premises for repair of fecning |
86 | Insertion of new fencing Posts in the store for repair of fencing |
87 | Dismantling of existing mesh fencing |
88 | Fixing of mesh Fencing |
89 | Fixiing of CGI Sheets |
90 | Dismantling of CGI sheets |
91 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 25/63/100 KVA |
92 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspectionsof Transfomers 250/400/630KVA |
93 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking |
94 | Painting(Red oxide/Aluminium Paint) ofFabricated Material. |
95 | Unloading of old loose conductor and making bundles |
96 | Checking & maggeringof 11Kv LA setHG set GO set CT/PT unit |
97 | Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6 |
98 | Fabrication of Angle iron braces /Belts/Guard Netting angles, fencing posts etc from angle iron of sizes |
99 | Fabrication of Channel Cross Arms of sorts from MS Channel 75x40x6 |
100 | Fabrication of Mukhi clamps from MS flat (suitable for 9mtr,11mtr and 13 mtr poles) |
101 | Fabrication of U- clamps from MS flat |
102 | Drilling holes per unit hole |
103 | Fabrication of Guy Rods from MS round iron |
104 | Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards |
105 | Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards |
106 | Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards |
107 | Painting(Red oxide/Aluminium Paint) of Fabricated Material. |