| Sl. No. | Item Description |
| 1 | Excavationforfoundationinearth,soilofalltypes,sand,gravelandsoftmurum, including removingtheexcavatedmaterialuptoadistanceof50m.beyondthe buildingareaand stackingandspreadingasdirected,dewatering,preparingthebed forthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means |
| 2 | ExcavationforfoundationinSoftrockandoldcementorlimemasonryfoundations includingremovingtheexcavatedmaterialuptoadistanceof50metresbeyondthe buildingareaandstackingasdirected,includingdewatering,preparingthebedforthe foundationandnecessarybackfillingwithavailableearth/murum,ramming,watering including shoring and strutting etc. complete (lift upto 1.5m)By Mechanical Means |
| 3 | Excavation for foundation in hard murum includingremovingtheexcavatedmaterial upto distanceof50metresbeyondthebuildingareaandstackingandspreadingas directed,dewatering, preparing the bed for the foundation and necessary back filling,ramming, wateringincludingshoringandstruttingetc.complete.(Liftupto 1.50m)ByMechanical Means |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreadingasdirected, dewatering, preparing the bed for the foundationand necessary back filling,ramming, watering including shoring and strutting etc. complete.(Liftupto1.5m.)By Mechanical Means |
| 5 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metresbeyond the building area stacking as directed, dewatering and back filling with available earth / murum watering, ramming etc. complete. (Lift upto 1.5 m).By Mechanical Means |
| 6 | Excavation for foundation in Hard-rock including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5m To 3.0 m) By Mechanical Means |
| 7 | Filling in plinth and floors with approved excavated materialin15cm.to20cm.Layers including watering and compacting etc. complete. |
| 8 | Filling in plinth and floors with contractors material / brought from outside and approvedby Engineer in charge in layers of 15 cm to 20 cm including watering and compactionetc. complete. |
| 9 | Providingdry/trap/granite/quartzite/gneissrubblestonesoling15cmto20 cm Thick including hand packing and compacting etc. complete. |
| 10 | Providing soling using 80mm size trap metal in 15cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. |
| 11 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating thebottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. |
| 12 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of5 litres of emulsion concentrate at 1.0 percent ofclorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper. |
| 13 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at15cmc/casclosetothewallaspossibleandtoinject0.5percentof aldrinor clorophyrifosatthe rate of 7.5litresperhole andsealing the same with proper filling and covering 10 years guarantee on bond paper. |
| 14 | Conveying materials from site of deposition. |
| 15 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. |
| 16 | Providing and laying Cast in situ / Ready Mix cement concrete in M-10 of trap / granite /quartzite / gneiss metal for foundation and bedding including bailing out water, Steel centering,formwork,laying / pumping,compacting,rougheningthemif special finish is to be provided,finishingifrequiredandcuringcomplete, without SCADA reversible Drum Type mixer / concrete Batch mix plant (Pan mixer) etc. complete.With fine aggregate (Crushed sand VSI Grade) |
| 17 | Providing and laying Cast in situ / Ready Mix cement concrete in M-15 of trap /granite / quartzite / gneiss metal for foundation and bedding / stepsincludingsteel centering, formwork, laying/pumping, compacting,rougheningthemifspecialfinish istobeprovided,finishingunevenand honeycombed surface and curing etc. complete. TheCementMortar1:3plasterisconsideredforrenderingunevenandhoneycombed surface, only. Newly laid concrete shall be covered bygunnybag,plastic,tarpaulinetc. (Wooden centering will not be allowed.), without SCADA reversible Drum Type mixer/concreteBatch mixplant(Panmixer)etc. complete. Withfineaggregate(Crushed sand VSI Grade)B.7 Page No 38 |
| 18 | Providing and laying Cast in situ / Ready Mix cement concrete M-25 of trap / granite / quartzite / gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering, formwork, cover blocks, laying / pumping, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcementand structural steel) etc.complete, withfully automaticmicro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 19 | Providing and laying Cast in situ / Ready Mix cement concrete M-30 of trap / granite / quartzite/ gneiss metal for R.C.C. Columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to giveasmoothandevensurfaceorrougheningifspecialfinishistobe provided and curing etc. complete, (Excluding reinforcement and structural steel) without SCADA reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor Quantity |
| 20 | First Floor Quantity |
| 21 | Second Floor Quantity |
| 22 | Providingand layingCast in situ/ReadyMix cement concretein M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. Beams and Lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structuralsteel) without SCADA reversibleDrumTypemixer/concrete Batch mix plant (Pan mixer) etc.complete.Withfineaggregate(CrushedsandVSI Grade) Ground Floor Quantity |
| 23 | First Floor Quantity |
| 24 | Second Floor Quantity |
| 25 | ProvidingandlayingCastinsitu / ReadyMixcementconcreteM-25oftrap / granite/quartzite/gneissmetal forR.C.C. Slabs and Landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to givea smooth and even surface or roughening if special finish is to be provided and curing etc. complete, (Excluding reinforcement and structural steel) without SCADA reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Ground Floor Quantity |
| 26 | First Floor Quantity |
| 27 | Second Floor Quantity |
| 28 | ProvidingandlayingCastinsitu/ReadyMixcementconcreteM-25oftrap/granite/ quartzite/gneissmetal forR.C.C. Chajjaasperdetaileddesignanddrawingsincluding steel centering, formwork, cover blocks, laying/pumping, compacting androughening the surface ifspecial finish is to be provided and curing complete. (Excluding reinforcement and structural steel) without SCADA reversible Drum Type mixer / concrete Batch mix plant (Pan mixer) etc. complete.Withfineaggregate (Crushed sand VSI Grade) Ground Floor Quantity |
| 29 | First Floor Quantity |
| 30 | Second Floor & Above Quantity |
| 31 | Providingand layingCast in situ/ReadyMix cement concretein M-25 of trap/ granite/ quartzite/gneissmetalforR.C.C. Pardi ofrequiredthicknessincludingsteel centering, formwork, cover blocks, laying/pumping,compacting and roughening them if special finish istobeprovidedandcuringcomplete.(Excludingreinforcementand structural steel) without SCADA reversible Drum Typemixer/ concrete Batch mix plant (Pan mixer) etc. complete.Withfineaggregate(Crushed sand VSI Grade)Ground Floor Quantity |
| 32 | First Floor Quantity |
| 33 | Second Floor & Above Quantity |
| 34 | Providing and laying Cast in situ/Ready Mix cement concrete in M-20 of trap/ granite/ quartzite / gneiss metal for R.C.C. Coping to plinth or parapet and sill of doors and windowsmouldedasperdetailed drawingsorchamferedasapprovedby theEngineer includingsteelcentering, formwork, cover blocks, laying / pumping, compacting, curing, finishing and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel) without SCADA reversible Drum Type mixer / concrete Batch mix plant (Pan mixer) etc. complete. Withfineaggregate(Crushed sand VSI Grade) Ground Floor Quantity |
| 35 | First Floor Quantity |
| 36 | Second Floor & Above Quantity |
| 37 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels,chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs,drawingsand schedules. including cutting,bending, hooking the bars, binding with wires or tack welding and supporting as required complete.Ground Floor Quantity |
| 38 | First Floor Quantity |
| 39 | Second Floor Quantity |
| 40 | Providing fly ash brick masonry with conventional / I.S. type fly ash bricksin C.M. 1:6 in foundationandplinthincluding bailingoutwatermanually strikingjoints,rackingout joints watering and scaffolding etc. complete. |
| 41 | Providing second class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1:6 in plinth as backing in composite masonry including bailing out water manually, striking joints, raking out joints and watering etc Complete. |
| 42 | Providinguncoursed rubble masonry of trap / granite / quartzite / gneissstonesin cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls includingbailingoutwatermanually, striking joints on unexposed faces and watering etc.complete. |
| 43 | Providing second class Burnt Brick masonry with conventional/I.S. type bricks in cementmortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete Ground Floor Quantity |
| 44 | First Floor Quantity |
| 45 | Second Floor & Above Quantity |
| 46 | Providing secondclassBurntBrickmasonrywithconventional/I.S.typebricksin cement mortar 1:4 in half brick thick wall including mild steel longitudinal reinforcement of 2 bars of 6 mm diameter / 2 hoop iron strips 25 mm X 1.6 mm placedat every third course, properly bent and bonded at ends scaffolding, racking out joints and watering etc.complete. Ground Floor Quantity |
| 47 | First Floor Quantity |
| 48 | Second Floor & Above Quantity |
| 49 | Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech orequivalentin Half brickthick wall (150mm Thick) includingstrikingjoints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) Ground Floor Quantity |
| 50 | First Floor Quantity |
| 51 | Second Floor & Above Quantity |
| 52 | Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)Ground Floor Quantity |
| 53 | First Floor Quantity |
| 54 | Second Floor & Above Quantity |
| 55 | Providing & Fixing Soild core hot pressed , phenol formaldehyde bonded boiling proof 40mm thick marine plywood door frame Citicom 710 / Green Club 500 / CPL 710 or equivalent make on both side gypsum face, seasoned calibrated &chemically treated as per IS 710 standard one side laminate of approved colour shade & design and width i/c fixing as per manufactures specification all and Hilti fastner 100mm long 10 nos each side embedded in masonry including 75x12 mm marineply cover mould with teak wood lipping on both sides etc. complete as per direction of Engineer in Charge. Size = 300mm x 40 mm Ground Floor Quantity |
| 56 | First Floor Quantity |
| 57 | Second Floor & Above Quantity |
| 58 | Providing and applying coal tar in two coats on new wood work including preparing the surface, scaffolding etc. complete. (coal tar shall be minimum 500 grams per 1 Sqm.) Ground Floor Quantity |
| 59 | First Floor Quantity |
| 60 | Second Floor & Above Quantity |
| 61 | Providing and applying melamine polish of required finish to the wood work by spraymachine including knotting and preparing the even surface by scraping, applying melamine polish, scaffolding if required etc. complete. Note:- Theworktobeexecuted on priorapproval of Superintending Engineer / Architect willbe necessary. Ground Floor Quantity |
| 62 | First Floor Quantity |
| 63 | Second Floor & Above Quantity |
| 64 | Providing and fixing in position 32mm thick solid commercial flush door shutters, single / doubleshuttered, waterproof & termite proof as per Indian standard specification (Century ply make) including providing 30 X 20mm. T.W. lipping all around and both side 1mm thick laminate (Century / Greeenlam make) with three coats of fresh polish of approved color on top & vertical thickness, for bottom thickness with one coat of primer and two coats of approved satin paint (Asian / ICI make), all shutters tested for smooth easy operation etc. all as per architectural drawings & details etc. complete. (The rate is including all hardware schedule as per each type) (Flush door Basic Rate Rs.1350/- Sqm.) Actual flush door size will be paid (The rate is including all hardware schedule as per each type) HARDWARE SCHEDULE :- 1)D1 - 900 x 2100 (1.89 Sqm.) (25 Nos.) a) S.S. Butt Hinges of Supreme Suzu make (100 x 75 x 3) SS 202 4 Nos. (Basic Price = Rs. 165.20 /- Per No.) b) Handle A - 200mm long and 19mm thick SS 304 Handles of Kich Make - 1 Pair (Basic Price = Rs. 1351.10/- Per No.) c) Aldrop - 250mm long & 16mm dia.S.S. 202 Aldrop of Plus point make - 1 Nos (Basic Price = Rs. 778.80 /- Per No.) d) Round Latch - 200mm long & 12mm dia. S.S. - 1 Nos (Basic Price = Rs. 578.20 /- Per No.)e) Tower bolt - 200mm long S.S. 202 Tower bolt Suzu Super Premium 200 x 10mm - 1 Nos (Basic Price = Rs.247.80 /- Per No.) f) Door Stopper - Suzu SS 202 Door Stopper- 1 Nos (Basic Price = Rs.118 /- Per No.) |
| 65 | Double Shutter : 1)D1 - 1200 x 2400 ( 2.676 Sqm.) Hinges - 8 Nos. Handle A - 2 Nos. Aldrop - 1 No.Tadipatti - 1 No. Towerbolt - 3 No.Doormagnet - 2 No.PVC - Stopper - 2 No.HARDWARE SCHEDULE :-1)D1 - 1200 x 2400 (1.89 Sqm.)a) S.S. Butt Hinges of Supreme Suzu make (100 x75 x 3 mm) SS 202 6 Nos. (Basic Price = Rs. 165.20/- Per No.) b) Handle A - 200mm long and 19mm thick SS Handles of Kich - 2 Pair (Basic Price = Rs. 1351.10 /- Per No.) c) Aldrop - 300mm long & 16mm dia.S.S. Aldrop of Plus point make - 1 Nos (Basic Price = Rs. 908.60 /- Per No.) d) Round Latch - 250mm long & 12mm dia. S.S. - 1 Nos (Basic Price = Rs. 601.80 /- Per No.)e) Tower bolt - 200mm long S.S. 202 Tower bolt Suzu Super Premium 200 x 10mm - 2 Nos (Basic Price = Rs. 247.80 /- Per No.) f) Door Stopper - Suzu SS 202 Door Stopper - 2 Nos (Basic Price = Rs.118 /- Per No.) |
| 66 | Providing and fixing in position Fibro Plast Door Single Shutter (The rate is including all hardware schedule as per each type) for toilets as per drawing & design etc. complete 1)D2 - 800 x 2100 ( 1.68 Sqm.) (50 Nos.) HARDWARE SCHEDULE :- 1)D1 - 900 x 2100 (1.89 Sqm.) (22 Nos.) a) S.S. Butt Hinges of Supreme Suzu make (100 x 75 x3mm )- 4 Nos. SS-202 (Basic Price = Rs. 165.20 /- Per No.) b) Handle B - 150mm long and 19mm thick SS-304 Handles of Kich - 1 Pair (Basic Price = Rs. 885 /- Per No.) c) S.S. Round Latch - 200mm long & 12mm dia. - 2 Nos (Basic Price = Rs. 578.20 /- Per No.)d) Doormagnet - S.S. Door magnet of Magnetic Catcher EBCO make code no. NC-US2 - 1 Nos (Basic Price = Rs. 47.20 /- Per No.) |
| 67 | Fibro Plast Doors Double Shutter : 1)D1 - 1200 x 2230 ( 2.676 Sqm.) (10 Nos.) HARDWARE SCHEDULE :- a) S.S. Butt Hinges of Supreme Suzu make - 6 Nos. (Basic Price = Rs. 165.20 /- Per No.)b) Handle B - 150mm long and 19mm thick SS Handles of Kich - 1 Pair (Basic Price = Rs. 885 /- Per No.) c) S.S. Round Latch - 250mm long & 12mm dia. - 2 Nos (Basic Price = Rs. 601.80 /- Per No.)d) Doormagnet - S.S. Door magnet of Magnetic Catcher EBCO make code no. NC-US2 - 1 Nos (Basic Price = Rs. 47.20 /- Per No.)e) Tower bolt - 200mm long S.S.Tower bolt Suzu Super Premium 200 x 10mm - 1 Nos (Basic Price = Rs. 247.80 /- Per No.) |
| 68 | Providing andfixing inposition(asper1868/1982)Aluminium sliding window of three tracks with rectangular pipe 95 x 38.10 x 0.90 mm at weight 0.637 Kilogram/One Running Metre. with window frame bottom track section 92x31.75x1.30 mm at weight 1.070 Kilogram / One Running Metre. Top and side track section 92 x 31.75 x 1.30 mm at weight 0.933 Kilogram/Runningmetre. The shutter should be of bearingbottom40x18x1.25mmat weight 0.417Kilogram/One Running Metre. Inter locking section 40x 18x 1.10mm atweight 0.469Kilogram/Runningmetre. andhandleandtopsection40x18x1.25mm atweight 0.417Kilogram/Running metre. As per detailed drawings and as directed by Engineer in charge withallnecessary Aluminiumsectionsfixturesandfasteningssuchasrollerbearing in nylon casting and self locking catch fitted in vertical section of shutter including 5 mm thickplainglassandaluminiummosquitonetshutterwithstainlesssteeljailwith all required screws and nuts etc, complete. (With powder coating without box) Ground Floor Quantity |
| 69 | First Floor Quantity |
| 70 | Second Floor & Above Quantity |
| 71 | Providing and fixing in position. (as per I.S.1868 / 1982) Aluminium sliding window of two tracks with rectangular pipe having overall dimension 63.50 x 38.10 x 1.02 mm at weight0.547Kilogram/OneRunningMetre.andwindowframebottomtracksection 61.85 x 31.75 x 1.20 mm atweight0.695Kilogram/One Running Metre.Topandside track section61.85x31.75x 1.30 mm at weight 0.659 Kilogram/One Running Metre. The shutter should be of bearing bottom 40 x 18 x 1.25 mm at weight 0.417 Kilogram/One Running Metre. Inter locking section 40 x 18 x 1.10 mm at weight 0.469 Kilogram/One Running Metre. And handle section 40 x 18 x 1.25mm at weight 0.417Kilogram/One Running Metre. and top section 40 x 18 x 1.25 mm at weight 0.417 Kilogram/Running metre. As per detailed drawings and as directed by Engineer in chargewithall necessaryAluminiumsectionsfixturesandfasteningssuchasrollerbearinginnylon casting andselflockingcatchfittedinvertical sectionofshutterincluding5mmthick plain glass with all required screws and nuts etc, complete. (With powder coating without box)Ground Floor Quantity |
| 72 | First Floor Quantity |
| 73 | Second Floor & Above Quantity |
| 74 | Providing and fixing in position Aluminium partly openable and partly fixed or top hung windows of anysize as per detailed drawing and as directed by Engineer-in-charge with all necessaryalluminiumsectionsincludingnecessaryfixturesand fasteningwith 5mm thick floatglass etc. complete.b) With powder coatingNoteWhilearrivingatthe rateofitemofitem weight at 6.90 Kilogram/ One Square Metre is considered.Ground Floor Quantity |
| 75 | First Floor Quantity |
| 76 | Second Floor & Above Quantity |
| 77 | Providing and fixing in position powder coated aluminium louvered windows / ventilator ofvarious sizes with powder coating as per detailed drawing and specifications of RATHOD make (box mechanism) or equivalent including aluminiumframes80 x 38 x 1.22 mm, 5 mmthick sheet glass louvers of approved quality etc. complete.As directed by Architect / Engineer in charge.Ground Floor Quantity |
| 78 | First Floor Quantity |
| 79 | Second Floor Quantity |
| 80 | Providing and fixing in position aluminium fixed window fully glazed of any size as per detailed drawing and as directedby Engineer-in-charge with all necessary alluminium sections including necessary fixtures and fastening such as 5 mm thick toghened tinted glass etc. complete. b) Powder Coated |
| 81 | Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram / One Square Metre asperdrawingincludingfixturesnecessaryweldingandpaintingwith onecoatof anticorrosive paint and two coats of oil painting complete. Ground Floor Quantity |
| 82 | First Floor Quantity |
| 83 | Second Floor Quantity |
| 84 | Providing internal cement plaster 6 mm thick in a single coat in cement mortar 1:4 withoutneerufinishtoconcretesurfaceinallpositionsincludingscaffoldingandcuringetc. complete. Ground Floor Quantity |
| 85 | First Floor Quantity |
| 86 | Second Floor Quantity |
| 87 | Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre asperdrawing including fixtures,necessarywelding andpainting withone coatsof anticorrosive paint and two coats of oil painting complete.Ground Floor |
| 88 | First Floor Quantity |
| 89 | Second Floor Quantity |
| 90 | Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete.Ground Floor Quantity |
| 91 | First Floor Quantity |
| 92 | Second Floor Quantity |
| 93 | Providinginternal cement plaster 20mm thickin Single coats in cement mortar 1:4 without neerufinish,toconcrete,bricksurface,inallpositionsincludingscaffolding andcuring etc.complete.Ground Floor Quantity |
| 94 | First Floor Quantity |
| 95 | Second Floor Quantity |
| 96 | Providing fine cement finish 1.5mm thick over green plaster surface including scaffolding curing etc. complete. For UG Tank |
| 97 | Providing and applying gypsum plaster with finishing with gypsum material in 4 to 6 mm thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. For CeilingGround Floor Quantity |
| 98 | First Floor Quantity |
| 99 | Second Floor Quantity |
| 100 | Providing and applying Gypsum plaster with finishing with gypsum material in 6 to 8 mm thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. For WallsGround Floor Quantity |
| 101 | First Floor Quantity |
| 102 | Second Floor Quantity |
| 103 | Providing Sand Faced plaster externally in cement mortar using approved screened sand, in allpositions including base coat of 15 mm thick in cement mortar 1:4 using water-proofing compound at 1 Kg per cement bag curing the same for not less than 2 daysandkeepingthe surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. Ground Floor Quantity |
| 104 | First Floor Quantity |
| 105 | Second Floor Quantity |
| 106 | Providing and fixing Fiber mesh, with about 300mm width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete / B.B.masonry and or tying by binding wire etc. complete.Ground Floor Quantity |
| 107 | First Floor Quantity |
| 108 | Second Floor Quantity |
| 109 | Providing and applying stonecrete plaster coating of 10 to 12mm. Thick hardest texture with rich granular effect decorative in mixing with 8 to 12mm size, natural marble stone chips & marble powder. Multi chips combination to be achived with 60% kotah grey, 20% marble white and 20% kadappa black design including preparation of surface to receive stonecrete plaster filling cracks if any, scaffolding and all required accessories etc. the rate to include base cement plaster of 12mm thick in CM 1:4, wooden bottom fixing (20mm to 25mm) for groove, washing of plaster to remove excess cement and calcium sillicate watering etc. complete as per design, drawing or as instructed by Engineer in charge or as per manufacturer details approved by us.The maximum panel size shall be 7 Sqm. and the groove item with teak wood spacer etc. shall not be paid separately Ground Floor Quantity |
| 110 | First Floor Quantity |
| 111 | Second Floor Quantity |
| 112 | Providing and applying colour-wash of approved colour and shade in two coats to newsurface including scaffolding, brushing and brooming down (excluding base coat of white- wash) etc. complete.Ground Floor Quantity |
| 113 | First Floor Quantity |
| 114 | Second Floor Quantity |
| 115 | Providing and applying washable oil-bound distemper of approvedcolour andshade to oldand new surfacesintwocoatsincludingscaffolding,preparingthesurfaces. (excluding the primer coat.) etc. complete.Ground Floor Quantity |
| 116 | First Floor Quantity |
| 117 | Second Floor Quantity |
| 118 | Providing and applying pearl / luster finish paint of approved colour and shade to the existing plaster surface including scaffolding, preparing the surface, applying the acrylic wall putti etc. & including the priming coat on concrete / masonary / Asbestos Cement plastered surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaningoil,grease,dirtandotherforeignmatterandsandpaperingasrequiredetc. complete.Ground Floor Quantity |
| 119 | First Floor Quantity |
| 120 | Second Floor Quantity |
| 121 | 1) Providing and applying plastic emulsion paint of approved quality, colour and shade to old and new surfaces in two coats including scaffolding, preparing the surface including the priming coat on concrete / masonary / Asbestos Cement plastered surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaningoil,grease,dirtandotherforeignmatterandsandpaperingasrequired& including two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. Ground Floor Quantity |
| 122 | First Floor Quantity |
| 123 | Second Floor Quantity |
| 124 | Providing and applying two coats of exterior weather shield paint of approved manufactureand of approved colour to the plastered surfaces including cleaning ,preparing the plastersurface, applying primer coat, scaffolding if necessary, and watering the surface for two days etccomplete.Ground Floor Quantity |
| 125 | First Floor Quantity |
| 126 | Second Floor Quantity |
| 127 | Providing and applying two coats of synthetic enamel paint of approved colour to new /old structuralsteelworkandwoodworkinbuildings,includingscaffoldingifnecessary, cleaning and preparing the surface (excluding primer coat) etc. complete.Ground Floor Quantity |
| 128 | First Floor And Second Floor Quantity |
| 129 | Providing andapplying Twocoats ofwall care Putty onplastered surface andCeiling and Walls to prepare surface even and smooth of approved make, etc complete.Ground Floor |
| 130 | First Floor and Terrace |
| 131 | Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding,if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 132 | First Floor and Terrace |
| 133 | Providingandfixing20to25mmthickroughshahabadboxtypewaterproofingfor basement orundergroundflooronabaseofCementconcrete1:3:6,includingsub baseof 2.50centimeterthickCementmortar1:3withconceal,secrete (RMW),Algae proof or other alike waterproofing liquids, raking of joints upto 35 mm depth, filling the jointswith 6mmsizecrushedmetal,handgroutingwithcementslurry,curingand cleaning,with7yearsguaranteeoncourtfee stampofRs.100/-withponding testetc complete. (excluding Cement concrete 1:3:6 base concrete ) |
| 134 | Providing & fixing 20 to 25mm thick rough shahabad box type waterproofing treatment to vertical outside faces of reinforced cement concrete wall of basement or underground floor onincl. filling gap of 25mm between rough shahabad and RCC wall with cement grout mixed with waterproofingliquidAlgiproof or alike with one tile lift method, brushing the joint horizontalyjoint with cement slurry mixed with waterproofingliquid for width 30 to 35mm & sloping coping over topmost tile with CM 1:3, butting the bottom most with cement concrete 1:2:4 mixed with waterproofingliquid,curing and cleaning, with 7 years guarantee on court fee stamp of rs.100/- with ponding test etc. complete.(excluding cement concrete 1:3:6 base concrete)Spec.No. : Bd.J.2 Page No.355 |
| 135 | Providing and applying waterproofing treatment using acrylic polymer modified cement basedwaterproofingcoatingwithfibreglassmeshmixingattherateof powdertoliquid (2:1)byweightcovering9 to 10 SquareMetre/Kilogramwith twocoatusingapproved chemicals for masonry andconcrete surface by brush covering 7 years guarantee on Stamp Papers etc. complete. (For Top Slab of RCC UG Tank) |
| 136 | Providing & Laying Brick Bat concrete (1:4:8) using river sand in Sunken slab portions as W.C. & Toilet slabs including mixing Placing, consolidation curing etc. |
| 137 | Providingcementbasedwaterproofingtreatmenttoterraces(Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M. 1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applyingcementslurryoverthislayerjointsofbrickbatswithC.M.1:3admixedwith approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixedwithapprovedwaterproofingcompound. Markingfinishedsurface with false squares of 300 x 300 mm making the junctions attheparapetroundedand tapered top for required height, with drip mould at the junction of plaster and parapetand curing and covering 10 years Guarantee against leak proofness on Court fee stamp paper of Rs. 500/-including ponding testetc. complete. Ground Floor Quantity |
| 138 | First Floor Quantity |
| 139 | Second Floor Quantity |
| 140 | Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. Ground Floor Quantity |
| 141 | First Floor Quantity |
| 142 | Second Floor Quantity |
| 143 | Removing loose rust from the reinforcement bars by wire brushing, light hammering etc. and applying sulphate and chloride free inorganic single component rust remover Rusticide asapprovedbyEngineerinchargeconformingtoIS9077.Therustedsurfaceshall become blackish non rusted colour. After 24 hours of application of rust remover, loose particlesshall be removedby brush.Apply one more coat ofRusticide. Apply bonding coat slurry of high performance acrylic polymer - Methyl 2-methylpropenoate copolymer with another innovate as approved by Engineer in charge on entire surface. Mix 1 Kg of acrylic polymer with 0.5 Kg of cement. Finish it with ready to use repair polymer modified mortar based on special cements, formaldehyde based polymer with thixotropy modifying agents as approved by Engineer in charge (The Polymer Modified Mortar (PMM) should attain min.compressive strength of20N/mm2 in1 day and 30N/mm2in7 days)by adding13-16%waterbyweightofpolymermodifiedmortarfortreatmenttothe damagedRCCmembers.Add1KgofMigratingCorrosionInhibitingAdmixtureas approved by Engineer in charge per 25 Kg bag of polymer modified mortar. After mixing polymermodifiedmortar,it canbe trowel appliedorsprayed.Whenapplying by hand, polymermodifiedmortarmustbeforcedtightlyintothesubstratetoensurecomplete contact with the substrate.(If scaffolding is required, same shall be provided and will be paid under relevant item) (15-30 mm thickness at a time). |
| 144 | Providing and laying glazed vitrified tiles having size 1200 x 600 mm / 800 x 800 mm of 8 to10 mm thicknessandconfirming to IS. 15622-2006 of approved make, shade and pattern for flooring in required position laid on a bed of 1:4cementmortar including neatcementfloat,fillingjoints, curing and clearing etc. complete. Ground Floor Quantity |
| 145 | First Floor Quantity |
| 146 | Second Floor Quantity |
| 147 | Providing and laying glazed vitrified tiles having size 1200 x 600 mm / 800 x 800 mm of 8 to 10 mm thickness and confirming to IS.15622-2006 of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and clearingetc. complete Ground Floor Quantity |
| 148 | First Floor Quantity |
| 149 | Second Floor Quantity |
| 150 | Providing and laying vitrified mirror / glossy finish tiles decorative type having size 590 mm to 605 mm x 590 mm to 605 mm of 8 to 10 mm thicknessandconfirming to IS.15622 - 2006(group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of1:4 cement mortar including neat cement float, filling joints, curing and clearing etc. complete.Ground Floor Quantity |
| 151 | First Floor Quantity |
| 152 | Second Floor Quantity |
| 153 | Providing and laying vitrified mirror / glossy finish tiles having size 590 mm to 605 mm x 590 mm to 605 mm of 8 to 10 mm thickness and confirming to IS. 15622-2006 ( group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and clearingetc.complete.Ground Floor Quantity |
| 154 | First Floor Quantity |
| 155 | Second Floor Quantity |
| 156 | Providing and laying ceramic tiles having size 300 x 600 mm confirming to corresponding I.S. for dado and skirting inrequiredpositionwithreadymadeadhesive mortarofapprovedquality onplasterof1:2cementmortarincludingjointfillingwith white / colour cement slurry cleaning curing etc. complete.Ground Floor Quantity |
| 157 | First Floor Quantity |
| 158 | Second Floor Quantity |
| 159 | Providing and laying Antiskid Ceramic tiles of approved qualityof size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.Ground Floor Quantity |
| 160 | First Floor Quantity |
| 161 | Second Floor Quantity |
| 162 | Providingandlayingtelephoneblack/AmbaWhite/Cadburybrown/Rubyred/ Ocean Brown granite stone of 18 to 20 mm thick for door frame / dado / window boxing etc.OnC.M.1:6includingfillingjointswithpolymerbasefillernosing/mouldingthe sharp edges wherever necessary, curing,etc. complete.Ground Floor Quantity |
| 163 | First Floor Quantity |
| 164 | Second Floor Quantity |
| 165 | Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Rubyred / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thickonbed1:6cementmortarincluding cementfloats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. Ground Floor Quantity |
| 166 | First Floor Quantity |
| 167 | Second Floor Quantity |
| 168 | Providingandfixingmachinecutmachinepolished18mmto20mmthicktelephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade withfullmoulding and three grooved line forthetreadsonbedof1:4Cementmortarincludingfloatfilling jointswithneatcement slurry curing polishing and cleaningetc. complete. Ground Floor Quantity |
| 169 | First Floor Quantity |
| 170 | Second Floor Quantity |
| 171 | Supply & Fixing of Full Body Vitrified Steptiles (Restile or equivalent make) Ready to install Treads and Risers 16 mm thick, required width and required finishin plainpattern including Cement float,filling joints, with neat cement slurry, Natural sand, curing and cleaning etc complete. with prior approval of concerned Superitending Engineer. Ground Floor Quantity |
| 172 | First Floor Quantity |
| 173 | Second Floor Quantity |
| 174 | Providing and preparing Kitchen otta up to 75 cm width,made up from 30 mm thick and 75 cm high vertical support for kadppa at 1 m. c/c of 25 mm thick both side polished kadappa middle shelf and bottom of 20 mm thick one side polished kadappa with facia patti of 20 x 50 mmkadappaincludingallmateriallabourcuttingfixingwithcementmortarand araldite curing polished and cleaningetc. complete. Ground Floor Quantity |
| 175 | First Floor Quantity |
| 176 | Second Floor Quantity |
| 177 | Providing and fixing heavy duty inter locking concrete RUBBER MOULD GLOSSY PAVING BLOCKS of 60 millimeterthickness of having a strength of 400 Kilogram/sq.mofapprovedqualityandshape on a bed of crushed sand of 25 to 30 millimeter thick including striking joints and cleaningetc. complete. (using 100% crushed sand) |
| 178 | Providing and fixing European type wall hung white water closet of CERA CATO - 3138 make Cat No S1043118 of size - 540 x 360 x 355 mm or equivalent with push valve concealed type OR self closing half turn valve concealed type with cover plate 32mm size of including soil pipe, vent pipe upto outside face of wall, 100mm dia. GI plug bend inlet pipe all fittings, cutting and making good walls, floors etc. completeGround Floor Quantity |
| 179 | First Floor Quantity |
| 180 | Second Floor Quantity |
| 181 | Providing and fixing White glazed with bottle trap earthenware Wash Hand Basin of Cera Cadal (S2040121) of 515 x 410 x 195 mm size including cold water piller taps, brackets, rubber plugs and brass chain, stop tap, chromium plate bottle trap and necessary pipe connections including UPAC waste pipe and trap upto the outside face of the wall, making good the damaged surface, testing etc. complete.Ground Floor Quantity |
| 182 | First Floor Quantity |
| 183 | Second Floor Quantity |
| 184 | Providing and fixing Square Type Under Counter Wash Hand Basin Cera Camry Mini (S2030106) or equivalent of 420 x 590 x 195 mm size with pillar cock, C.P.Angular stop cock, long thread of approved make continental includingSSbottletrap of necessarypipeconnectionuptotheoutside face of the wall, havingTelephonic Black/Colour Granite of 180 mm thick fixed on Black Kadappa Framework, etc. Complete as directed by Engineer in charge.Ground Floor Quantity |
| 185 | First Floor Quantity |
| 186 | Second Floor Quantity |
| 187 | Providing and fixing 75 mmdiastabiliser pipe /P.V.C. soilvent/wastepipeand withnecessaryfixturesand fittingsuchasbends,tees,singlejunctions,slottedvent,clamps etc. completeGround Floor Quantity |
| 188 | First Floor Quantity |
| 189 | Second Floor Quantity |
| 190 | b) 100mm dia. Ground Floor Quantity |
| 191 | First Floor Quantity |
| 192 | Second Floor Quantity |
| 193 | Providing and fixing 10 cm PVC multifloor nahani trap with grating etc. complete.Ground Floor Quantity |
| 194 | First Floor Quantity |
| 195 | Second Floor Quantity |
| 196 | Providing, laying and fixing P.V.C. pipe of 50 mm dia. with fittings such as bends, tees, reducers, clamps, etc. for spout pipe or as directed etc. complete. Ground Floor Quantity |
| 197 | First Floor Quantity |
| 198 | Second Floor Quantity |
| 199 | Providingandfixingonwalls / ceiling / floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.Ground Floor Quantity |
| 200 | First Floor Quantity |
| 201 | Second Floor Quantity |
| 202 | Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor Quantity |
| 203 | First Floor Quantity |
| 204 | Second Floor Quantity |
| 205 | Providing and fixing on walls/ceiling/floor 25 mmdia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Ground Floor Quantity |
| 206 | First Floor Quantity |
| 207 | Second Floor Quantity |
| 208 | Providing and fixing on walls/ceiling/floor 32 mmdia. CPVC pipewithnecessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directedetc. complete.Ground Floor Quantity |
| 209 | First Floor Quantity |
| 210 | Second Floor Quantity |
| 211 | Providing and fixing on walls/ceiling/floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directedetc. complete. |
| 212 | Providing and fixing on walls/ceiling floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. |
| 213 | Providing and fixing stainless steel sink of size 600 x 510 x 200 mm including coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete. Ground Floor Quantity |
| 214 | First Floor Quantity |
| 215 | Second Floor Quantity |
| 216 | ProvidingandfixingC.P. Angular stop cockwithwallflangeofapprovedmake continental including necessary sockets/union nut etc. complete.Ground Floor Quantity |
| 217 | First Floor Quantity |
| 218 | Second Floor Quantity |
| 219 | Providing & Fixing C.P. Pillar Cock Long Neck with aerator jaquar make continental ( CAT. NO. CON 5441 N) or equivalent including necessary socket/union nutetc. completeSpec. No.:- As directed by Engineering in chargeGround Floor Quantity |
| 220 | First Floor Quantity |
| 221 | Second Floor Quantity |
| 222 | Providing and fixing C.P. Wall Mixer with provision for overhead shower with 115 mm long bend pipe and wall flange of approved make including necessary sockets / union nutetc. complete.Ground Floor Quantity |
| 223 | First Floor Quantity |
| 224 | Second Floor Quantity |
| 225 | Providing and fixing chromium plated Shower rose of Jaquar make OHS-CHR-1989 including all accessories complete. Spec.: As directed by Engineer-in-charge.Ground Floor Quantity |
| 226 | First Floor Quantity |
| 227 | Second Floor Quantity |
| 228 | Providing and fixing two way C.P. BIB cock withwallflangeofapprovedmakeincluding necessary sockets/ union nut etc. complete.Ground Floor Quantity |
| 229 | First Floor Quantity |
| 230 | Second Floor Quantity |
| 231 | Providing and fixing Hand Shower (Health Faucet) of Cera Make (F8030107AB) with wallflange of approved make including necessary sockets/ union nut etc. complete. Ground Floor Quantity |
| 232 | First Floor Quantity |
| 233 | Second Floor Quantity |
| 234 | Providing and fixing P.V.C. Rain water pipes of 110 mm outer diameter and having wall thicknessof2.2to2.7mmconfirmingtoI.S 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, including fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket withsolvent cementandproperlyrestingtheshoe ofpipesonC.C.ormasonryblocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. Ground Floor Quantity |
| 235 | First Floor Quantity |
| 236 | Second Floor Quantity |
| 237 | Providing and fixing H.D.P container one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 1000 to 20,000 litres |
| 238 | Providing and fixing chromium plated towel rod of jaquar make including all accessories complete.( CON NO. 1111 )Spec.: As directed by Engineer-in-charge.Ground Floor Quantity |
| 239 | First Floor Quantity |
| 240 | Second Floor Quantity |
| 241 | Providing and fixing chromium plated Soap dish of jaquar make ( KICH TTPHFS ) including all accessories complete.Spec.: As directed by Engineer-in-charge. Ground Floor Quantity |
| 242 | First Floor Quantity |
| 243 | Second Floor Quantity |
| 244 | Providing and fixing chromium plated Paper holder of jaquar make Kimberly Clark / Euronics EP085 ACincluding all accessories complete.Spec.: As directed by Engineer-in-charge.Ground Floor Quantity |
| 245 | First Floor Quantity |
| 246 | Second Floor Quantity |
| 247 | Providing andfixing 450 x 550 mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. Ground Floor Quantity |
| 248 | First Floor Quantity |
| 249 | Second Floor Quantity |
| 250 | Providing and fixing screw down 15 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete |
| 251 | Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. |
| 252 | Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete |
| 253 | Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. |
| 254 | Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. |
| 255 | Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. |
| 256 | Providing and fixing 40 mm dia Ball cock medium type with PVC float including sockets and necessary fittings and tested as per municipal requirements etc. complete. |
| 257 | Providing and laying concrete pipes ofI.S.NP. Class 2 of 150 mm diameter in proper line, levelandslopeincludingnecessarycollars,excavation,laying,fixingwithcollarsincement mortar 1:1 and refilling the trench complete. |
| 258 | Providing and laying concrete pipes ofI.S.NP.class 2 of225 mm diameter in proper line, levelandslopeincludingnecessarycollars,excavation,laying,fixingwithcollarsincement mortar 1:1 and refilling the trench complete. |
| 259 | Providing and laying concrete pipes ofI.S.NP.class 2 of300 mm diameter in proper line,levelandslopeincludingnecessarycollars,excavation,laying,fixingwithcollarsin cement mortar 1:1 and refilling the trench complete. |
| 260 | Providing and constructing Brick Masonry Inspection Chamber 60cm x 45cm x 90 cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels halfround G.S.W. pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete. |
| 261 | Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90 cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete |
| 262 | Providing andfixing 15 cm x 10 cm salt glazed stoneware gully trap in cement concrete 1:4:8outsidethebuildingincludingcastirongratinginthesink,connectingglazed stonewarepipe,brickmasonry chamberwithcastironlidandcastirongrating forthe gully trap. |
| 263 | Providing and constructing Ductile Iron circular manhole 45 cm dia. Attop 90 cm at bottomupto 1.80meterto 2.70meterdepthincluding excavation,laying 1:4:8cement concrete bedding 15 cm thick burnt brick mansonry with 1:1 cement mortar plaster 25 mm thick inside and outside 20mm (1:3) ductile iron heavy type cover with ring 125 Kilogram inweight. High strength, more life and Durability, Good Antiskid Grip, Suitable to heavy theatric loading, Light weight casting after cost benefits for Transportation Refilling etc. as per requirement with prior approval of concerned Superitending Engineer. |
| 264 | Providing and fixing reinforced cement concrete cover of size 60 cm x 45 cm with frame over inspection chamber etc. complete. Heavy duty (160 Kilogram) |
| 265 | Rain Water Harvesting - Recharge PitProviding and constructing recharge pit of 2.0 m deep and 1.0 m dia of pre-cast RCC ringswith 6.5\" dia x 25m deep borewell at the floor of recharge pit including installation of combination of solid / perforated PVC casing pipe wrapped around with netlon mesh including 300mm thick sidefilling around outside of RCC rings (annular space) with 40mmsize boulders including filling of recharge pit up to 0.5m depth with 25-75 mm clean washedgravelsfrom bottom up followed by 0.5m depth of 10- 25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) including netlon mesh between each gravel / fine aggregate (natural sand / crushedsand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs, PVC end- caps, fittings etc. including arrangement for inlet & outlet pipe excavation& backfilling asshown in the drawing. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical specification and direction of the Engineer in charge. |
| 266 | Providing & Laying Diamond make HMS electrical PVC conduit pipes conceal in slab / beam as per electrical consultants layout incl. bends, junction Boxes, chemical joints, etc. completea) 25mm Dia |
| 267 | b) 32mm Dia |
| 268 | Providing and fixing in position MS concealed Fan boxes with Anchor bar of 75mm. High, tying etc. |
| 269 | Providing and Fixing matt finish stainless steel (of 302 grade) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fasteningincludingpipebaseofappropriatediameterandballbaseof75mmdia above newel post of 75mmdiameteretc.complete(Priorapprovalofsampleand brandbyEx. Engineer is necessary before use) Ground Floor Quantity |
| 270 | First Floor Quantity |
| 271 | Second Floor Quantity |
| 272 | Providing & fixing Shera Wood on MS fabrication with 50 x 50 x 2 MS perlin 50 x 100 x 3 rafters and MS plate, Base plate and fixing the RC beams by fastners.The polycarbonate sheet to have excruded aluminium section with EPDM gaskets.The walls, junction to have kamproll, resin, waterproffing etc. all MS section with one coat of zink primer and two coats of approved satin paint (Asian / ICI make) incl. scaffolding complete. |
| 273 | Providing & fixing Polycarbonate 12 mm thick (GE Lexan or euivalent make) multiwall skylight on MS fabrication with 50 x 50 x 2 MS perlin 50 x 100 x 3 rafters and MS plate, Base plate and fixing the RC beams by fastners.The polycarbonate sheet to have excruded aluminium section with EPDM gaskets.The walls, junction to have kamproll, resin, waterproffing etc. all MS section with one coat of zink primer and two coats of approved satin paint (Asian / ICI make) complete. |
| 274 | Providing and fixing colour coated Zincalume ( R )AZ150(min 150 gms / sq.mt. total on each side) profiled sheets for roofing. The feed material is manufactured out of nominal 0.45 mm Base Metal Thickness ( BMT ) (0.5 mm TCT), Hi-strength steel with min.550MPayieldstrength, metallic hot dip coated with Aluminium-Zinc alloy (55%aluminium 43.4%zinc 1.6% silicon) with COLORBOND ( R ) steel quality super durable polyester paint coat ( with inorganicpigment). Thepaintshallhaveatotal coatingthicknessofnominal35um, comprising of nominal 25 um exterior coat on top surface and nominal 10 um reverse coat on back surface. Profile sheet shall have nom. 950- 1050mmeffectivecoverwidthandnominal25-30mmdeepribswithsubtlesquare fluting in the five pan at nominal 180-250 mm center- to-center.The endribshallbe designedforanti-capillarygroove.andreturnleg.Thefeed material should have coil manufacturersproductdetailsmarkedaregularinterval.Includingfastenerswithmin. fastenedwithmin.25umZinc-Tinalloycoated,Hexhead,self-drillingscrewetc. complete. (weight of profile 4.52 Kilogram/ One Square Metre) |
| 275 | Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted / welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. |
| 276 | Providing,fabricatinganderecting atsiteofworkthetubular steel structure (shed) asper standard design and specifications having various spans in between trusses and in multiples of standard length of bays as specified as per standard specifications, inclusive of cost of steel tubular trusses, tubular columns purlins, tie runners, foundationbolts, base plates,nutsandbolts, welding wherever required etc.as per detailed drawing inclusiveof onecoatof anticorrosive paint and two coats of oil painting ofapproved quality and shade etc. complete. Spec. One Number : As directed by Engineer-in-charge. |
| 277 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm withironbarsat150mmC/Canddiagonalflatsasperthedetaileddrawingincluding hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kg / Sq.mt. |
| 278 | Providing and erecting chain link fencing 1.6m height with G.I. chain link of size 50x 50 mm, 8 gauge thick and fixed 75 mm above ground level on vertical M.S. Angles of 40 x 40 x 6 mm size, includind excavating pits for foundation and embedded in C.C. block of 1:4:8 mix of size 450 x 450 x 670 mm. at 1.75 M. c/c with iron bar 16mm dia as hold fast including welding link with angle frame at 30 cm c/c with nuts and bolts and horizontal M.S. Angles at top andbottom of 25 x 25 x 5 mm size andvertical M.S. flat 35 x 5 mm and 25 x 5 mm horizontal including cross support of 40 x 40 x 6 mm angles both side at every corner or bend embedded in concrete blocks of 1:4:8of size 450 x 450 x 670 mm including 3 coats of oil painting etc. complete. |
| 279 | Supplying, Drilling / Cleaningholeandinjecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023orrelevanttestedandacceptedrebarguidelines.ThechemicalshouldhaveETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flutetypedrillbitsorhollowdrillbitstotherequireddepthbyrotaryhammerdrill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. Theinstallationandthesettinginstructionsshouldbestrictlyfollowedasperthe manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decidedasperPROFISRebarSoftware&thereporttobesubmittedtotheproject manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -8mm dia 160mm depth |
| 280 | Re 500 -10 mm dia 200mm depth |
| 281 | Re 500 -12 mm dia 240mm depth |
| 282 | Re 500 -16 mm dia 320mm depth |
| 283 | Re 500 -20 mm dia 400 mm depth |
| 284 | Re 500 -25mm dia 500mm depth |
| 285 | Providing core cutting through slab (upto 150 mm thick) as per the instruction including scaffolding, watering, cleaning completed.A) 100 mm. Dia |
| 286 | 125 mm. Dia |
| 287 | 150 mm. Dia |
| 288 | Providing core cutting through beam (upto 230mm thick) as per the instruction including scaffolding, watering, cleaning completed. A)100 mm. Dia |
| 289 | 125 mm. Dia |
| 290 | 150 mm. Dia |
| 291 | Providing and fixing Stainless Steel Jali 300 mm x 300 mm louvers for Electrical door as directed by Engineer-in-charge |
| 292 | J.C.B. for Site Cleaning by submitting invoice signed by Engineer-in-charge |
| 293 | BASIC TEST OF CEMENT.Standard Consistancy Fineness, Specific Gravity, Setting Time ( Initial & Final ), Compressive Strength, Soundness |
| 294 | BASIC TEST OF AGGREGATE. Water Absorption, Specific Gravity,Impact Value /Crushing Value. |
| 295 | Sieve analysis |
| 296 | Abrasion value |
| 297 | Flakiness index and elongation index |
| 298 | Soundness |
| 299 | FINE AGGREGATESFineness modules (Sieve Analysis), silt and clay content |
| 300 | Chloride and sulphate content |
| 301 | Silt factor |
| 302 | BRICKS Water absorption (set of 5 bricks), Compressive strength (set of 5 bricks), Efflorescence (set of 5 bricks) |
| 303 | HOLLOW / SOLID /AAC BLOCKSDensity Test . (Set of 3 Blocks ),Compressive Strength. (Set of 3 Blocks ),Water Absorption Test ( Set of 3 Blocks ) |
| 304 | CERAMIC TILES / VITRIFIED TILESWater Absorption, Modules of Rapture (set of 6 tiles) |
| 305 | CONCRETECompressive Strength of C.C. Cube (Set of 3 cubes) |
| 306 | Concrete Mix Design (With all tests on basic materials)* |
| 307 | Flexural strength of Beam |
| 308 | STEEL BAR TESTINGUp to 16 mm (set of 3 bars) |
| 309 | Above 16 mm (set of 3 bars) (Tensile Strength, % elongation, Yield stress, Weight per Meter, Bend / Rebend Test, Proof Stress) |
| 310 | NON-DESTRUCTIVE TESTRebound hammer test |
| 311 | Ultrasonic Pulse Velocity |