| 1 | All these below items/materials from S.N. 1.01 to 1.11 will be given and errected by the contractor on his own cost. |
| 2 | CLAMP FOR TOP, DROPPER AND T-OFF etc. |
| 3 | LT Clamp |
| 4 | LT SHACKLEINSULTER |
| 5 | M.S. NUT & BOLT |
| 6 | V TYPE X-ARM HOLDING CLAMP |
| 7 | Stone Pad |
| 8 | Substation Angle Bolt 12\"\" Long |
| 9 | Aluminium Lug |
| 10 | Copper L-Piece |
| 11 | \"I\" HOOK |
| 12 | DISTRIBUTION BOX HOLDING CLAMP |
| 13 | Loading, Unloading and safe cartage of the following materials (S.N 2.01 to 2.24) from Electricity Store Centre, Gonda to the work site/dump site (Distance up to 60 km) |
| 14 | PCC Poles (8.5 mtr long) |
| 15 | 250 KVA transformer |
| 16 | 100 KVA transformer |
| 17 | 63 KVA transformer |
| 18 | 25 KVA transformer |
| 19 | Other line materials |
| 20 | ABC CABLE 3×50 |
| 21 | ABC CABLE 3×95 |
| 22 | ABC CABLE 3×120 |
| 23 | LT XLPE Cable 1x400 AL |
| 24 | ACSR Weasel Conductor |
| 25 | G.I. Wire 10 SWG |
| 26 | Stay wire |
| 27 | DISTRIBUTION BOX 3 PHASE |
| 28 | T-OFF CHANNEL |
| 29 | 11 KV V-Type X-Arm |
| 30 | F- Bracket |
| 31 | TOP CHANNEL |
| 32 | DROPER CHANNEL |
| 33 | SUB STATION BASE |
| 34 | PIN INSULATER WITH PIN |
| 35 | DISC INSULATER WITH FITTING |
| 36 | EARTHING COMPLETE |
| 37 | STAY SET COMPLETE |
| 38 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 39 | Erection of sectional double pole sectional PCC pole (8.5 mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 40 | Earthing of pole. |
| 41 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 42 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 43 | Laying, Sagging, stringing and binding of AB cable upto proper sag of following size |
| 44 | ABC CABLE 3×50 |
| 45 | ABC CABLE 3×95 |
| 46 | ABC CABLE 3×120 |
| 47 | Laying, Sagging, stringing and binding of following size, where is required as per estimate (U.G./O.H.) |
| 48 | LT XLPE Cable 1x400 AL |
| 49 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 50 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 51 | 250 KVA |
| 52 | 100 KVA |
| 53 | 63 KVA |
| 54 | 25 KVA |
| 55 | Guarding of 11 kv/LT line |
| 56 | Construction of Plinth with Fencing as per RESSPO norms.(All the material required for work shall be provided by the contractor on his own cost) |