}

Tender For Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And, delhi-Delhi

Northern Railway-NR has published Tender For Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And. Submission Date for this Tender is 30-10-2023. Flame Detectors Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

39891006
Tender For Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And
Open Tender
Indian
Delhi
delhi
30-10-2023

Tender Details

Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Page 1 Of 6 Run Date / Time: 27 / 09 / 2023 19:41:55Stores / Northern Rly Tender Document , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Sr. Section Punjab 123.00 Set , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Senior Section Uttar Pradesh 25.00 Set Engr. / Charbagh , Nr , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Senior Section Engg / Train Haryana 250.00 Set , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ]

Key Value

Document Fees
Refer document
EMD
INR 1591570.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item Description
1Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And Rdso Letter No. El/ 7.1.108/Mssbc Dated 17.09.2021.
2Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] Page 1 of 6 Run Date/Time: 27/09/2023 19:41:55STORES/NORTHERN RLY TENDER DOCUMENT
3 Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ]
4 Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SR. SECTION Punjab 123.00 Set
5 Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SENIOR SECTION Uttar Pradesh 25.00 Set ENGR./CHARBAGH , NR
6 Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SENIOR SECTION ENGG/TRAIN Haryana 250.00 Set
7 Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ]
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail