Northern Railway-NR has published Tender For Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And. Submission Date for this Tender is 30-10-2023. Flame Detectors Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso/Pe/Spec/Ac/0192-2018(Rev-1) And Rdso Letter No. El/ 7.1.108/Mssbc Dated 17.09.2021. |
2 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] Page 1 of 6 Run Date/Time: 27/09/2023 19:41:55STORES/NORTHERN RLY TENDER DOCUMENT |
3 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] |
4 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SR. SECTION Punjab 123.00 Set |
5 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SENIOR SECTION Uttar Pradesh 25.00 Set ENGR./CHARBAGH , NR |
6 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] SENIOR SECTION ENGG/TRAIN Haryana 250.00 Set |
7 | Supply and installation of Aerosol based fire detection and suppression system cartridge 100gm + 100gm, total 2 pieces per coach SBC, technical requirement as per Annexure G-1 of RDSO specification no. RRDSO/PE/SPEC/AC/0192-2018(REV-1) and RDSO letter no. EL/ 7.1.108/MSSBC dated 17.09.2021. These shall be installed in already available SBC of LHB AC coaches. All necessary modification, clamping arrangement and any other accessories required for installation of this item shall be with the scope of supplier. Location of installation of Aerosol based fire detection and suppression system cartridge in SBC shall be as per drawing mentioned in the RDSO letter no. EL/7.1.108/SBC dated 07.02.2023 [ Warranty Period: 120 Months after the date of delivery ] |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail