Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Supply Of Material Under Etd Siddharthnagar In Bp 2023-24. Submission Date for this Tender is 28-09-2023. Transformer Oil Tenders in siddharthnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 33 KV over current earthfaulty Relay (for protection of 33 KV Line) |
2 | Bansi Grameen 11 kv Master Trip Relay (5MVA)(its a Required componets of protection of 11 KV Line with the help of circuit breaker and protection Relay) |
3 | Bansi Taseel 11 kv Transformar Faulty Relay (5MVA) (for protection of power transformers) |
4 | Bansi Grameen 11 kv Transformar FaultyRelay (10MVA) (for protection of power transformers) |
5 | Bansi Grameen 11 kv Master Trip Relay (10MVA) (its a Required componets of protection of 11 KV Line with the help of circuit breaker and protection Relay) |
6 | MRI Machine (for Collecting Data of meterReading KWH, KVAH, KW, etc.) |
7 | Accuchek LT(for on site tesing of meters) |
8 | 5 kv digital insulation resistance tester (meggar)(req. for measuring meggar (insulationn resistance value of transformer/cables/breakers)) |
9 | Transformar Oil BDV Testing Kit Semi Automatic(Required for measuring the oil breakdown voltage of transformer oil) |
10 | Clamp Meter 0 -600A(With the help of clamp meter measure the ac/dc voltage.ac/dc current .continuity of wire) |
11 | Clamp Meter 0 -2000A(With the help of clamp meter measure the ac/dc voltage.ac/dc current .continuity of wire) |
12 | Tool Kit Set (TAPARIYA)(used for all testing and mandatory works) |
13 | Digital earth tester 4-Terminals(the main pupose of the Digital earth tester 4-Terminals is to determine the adequacy of the grounding of electrical system) |
14 | Primary Injection Kit 200A(Remake)(Required for testing of relay in substation panels) |
15 | Loading CT 800/5 A(used for tripping the relay at the substation and different value of current and set the normal current vale of that feeder) |
16 | VARIAC (Auto Transformars) Singar Phase 20A (Remake) 0-300 V(Use for Testing Variouselectrical equipment and different voltage level) |
17 | CU Flexable Multi strand 18 SQ MM(used for open ckt or short ckt test of transformer) |
18 | Crocodile clip |
19 | CU Lug 18SQ MM |
20 | Tripple pole Manual Operated Switch With Fuse 100 A/415 V(USE FOR TESTING CKT) |
21 | AC leakage Clamp Meter(used for measure the leakage current of power/distribution transformer) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail