| 1 | Cartage of 11 mtr long ST pole(60 Nos) PCC Pole (30Nos)from Central Store to JE Store including loading and unloading at both ends. |
| 2 | Cartage of 11 mtr long ST pole(60 Nos) PCC Pole (30Nos)from JE Store to Various Siteincluding loading and unloading at both ends. |
| 3 | Cartage of Line materialLT ABC cable 1850 mtr.LT Lead 1x35 mm 150 mtr &11 KV Pin Insulator / 11KV Disc Insulators,for 33/11 KV lines all metarial from central store to JE store then JE store tositeof works basis as per site requirement. |
| 4 | Errection of ST pole 11 mtr as single support for LT line after digging of pit of proper size and all type of soil including back filling of the pole with proper ramming after completion of works.aAs Respo construction Mannual(completework) |
| 5 | Errection of PCC pole 8.5 mtr. as single support for LT line after digging of pit of proper size and all type of soil including back filling of the pole with proper ramming after completion of works.aAs Respo construction Mannual(completework) |
| 6 | Febrication ,Mounting and Fixing of MS angel as Gaurding Cross Arm |
| 7 | Gaurdingof 11 KV Line Feeder with Laying of GI Wire for Gaurding span and lacing at proper intervals with binding by binding wire. |
| 8 | Laying, lagging, sagging of LT ABC cable 3x120+1x16mm LT Lead 1x35 mm |
| 9 | Providing and Fixing Distribution Box 3 Phase |
| 10 | Providing and Fixing Guarding Angel 75x75x6 mm with Holding clamp,packingpiece, nut & bolts |
| 11 | Providing and Fixing of earthing rods and Earthing of poles with earthing rod complete in all respect. |
| 12 | Fixing of 11 KV Disk Insulator as per site requirement . |
| 13 | Fixing of 11 KV Pin Insulator with Pin fitting.as per site requirement . |
| 14 | Providing and Fixing 11 KV Cross Arms |
| 15 | Providing and Fixing of GI Wire 8.SWG/6. SWG. |
| 16 | Providing and Fixing of All Type Clamps . |
| 17 | Grouting of poles |
| 18 | Cartage of Control Panel from central store to 33/11 K.V. S/S ( site of work) including loading and unloading at both endes. |
| 19 | Dismentling of Control Panel by Opening of Control PanelCable / Leads and Shifting of Damaged Control Panel to the safe side in all respect. |
| 20 | Installation ofControl Pannel by Fixing ofControl Panel Leads/Relay etc. complete in all respect. |
| 21 | Cartage of VCB from central store to JE Store and from JE Store to work site including loading and unloading at both endes. |
| 22 | Dismentling of Old and Damaged 11 KV/ 33 KV VCB/OCB by opening the cable/lead and making free |
| 23 | Shifting of old VCB to the safe place . |
| 24 | installation of11 KV VCB by making connection through Lead/Cable properly. |
| 25 | installation of33 KV VCB by making connection through Lead/Cable properly. |
| 26 | Received Back of Material |
| 27 | Cartage of VCB/OCB , Control Pannel from site of work to J.E. store and J.E. store to central storeincluding loading and unloading at both endes. |
| 28 | Cartage of All Scrape Line metarial Poles Cables etc. from site of work to J.E. store and J.E. store to central storeincluding loading and unloading at both endes. |