Uttarakhand Power Corporation Limited-UPCL has published Replacement Of Existing 33 Kv Acsr Dog Conductor With 33 Kv Aaac Al-59 , 241 Sq Mm Covered Conductor At Different Work Site From Kalibar To Bhakra Nadi Under Edd Ramnagar. Submission Date for this Tender is 19-09-2023. Conductor Tenders in haldwani Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | A Decentralized Material |
2 | 33 KVAAAC AL-59 , 241 sq mm Covered Conductor (As per EN- 50397-1:2006) .The conductor shall be stranded, round,non compacted and water tight. Non Compacted conductor shall comply with all the requirement of EN 50397-1-2006. The stranded conductor shall be longitudinally water blocked by means of a water blocking material.Thesemi conducting screen, inner insulation and outer insulation should be extruded in one step. The outer covering insulation shall be UV-stabilized, tracking resistant black XLPE. |
3 | MVCC Accessories (As per EN - 50397-2) as below: |
4 | 33 KV Tension Clamp with bail & IPC |
5 | 33 KV Cable Ties for Pin Insulator. |
6 | 33 KV IPC for covered to coveredconnections |
7 | 33 KV IPC for covered to Bare connections |
8 | 33 KV Mid Span Jointing Kit |
9 | IPC with Aluminium Bail for earthing |
10 | 33 KV Disc insulator for AAAC Covered Conductor |
11 | 33 KV Pin Insulator 120 KN |
12 | PP and Clamp for SP-55 with N&B |
13 | Stay Clamp for SP-55 with N&B |
14 | Bracing Clamp Top for SP 55 with N&B |
15 | Bracing Clamp Bottom For SP 55 With N&B |
16 | B Labour Charge: Cartage of following material from ESC to Road site of work dist. Apprx. 160 km Loading/unloading comp. |
17 | ST pole SP-55 |
18 | Small Material |
19 | Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp. |
20 | (a) ST pole SP-55 |
21 | (b) Small Material |
22 | Fabrication of steel by cutting and drilling properly |
23 | Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole |
24 | Erection of new 33 KV D/P Structure as per upcl norms |
25 | Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole |
26 | Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr) |
27 | Grouting of Stay as per norms (0.6*0.6*0.3)*stay |
28 | Providing and Fixing of new 33 KV stay as per upcl norms |
29 | Fixing , tightening and Nozzeling of StayWith pole and Stay rod on required Tension as per per drawing |
30 | Removing of old conductor with opening of existing jumpering and making of bundle. |
31 | Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendationsgiven in EN-50397-3 should be followed for storage, transport and installation of covered conductor. |
32 | 33 KVAAAC AL-59 , 241 sq mm Covered Conductor |
33 | Excavation of earth and erection of 33 KV single support with CC Comp. |
34 | Fixing of MVCC Accessories |
35 | 33 KV Tension Clamp with bail & IPC |
36 | 33 KV Cable Ties for Pin Insulator. |
37 | 33 KV IPC for covered to coveredconnections |
38 | 33 KV IPC for covered to Bare connections |
39 | 33 KV Mid Span Jointing Kit |
40 | IPC with Aluminium Bail for earthing |
41 | 33 KV Disc insulator for AAAC Covered Conductor |
42 | 33 KV Pin Insulator |
43 | Chemical Earthing on pole structure (Existing/New) |
44 | Providing and fixing of 33 KV Termination Kit |
45 | Providing and fixing Anti climbing device for 33 KV new structures |
46 | Plinth for 33 KV D/P. |
47 | Painting of Poles SP 55 |
48 | Back cartage of dismantled material from work site to work road side.Average distance 2 Km |
49 | Line material |
50 | Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km |
51 | Line material |