| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site.All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (Decentralized Items Provided by the Contractor as per Estimate). |
| 2 | Carriage of ST Pole 11 Mtr. long |
| 3 | Carriage of PCC Pole 8.5 Mtr long |
| 4 | Carriage of ACSR weasel conductor |
| 5 | Carriage of 11 KV XLPE cable 3x70mm2/3x120mm2/3x185mm2 |
| 6 | Carriage of AB Cable 1x25/3x50+1x35+1x25 mm2/3x95+1x70+1x25mm2 |
| 7 | 11 KV Jointing kit (Straight Through/Outdoor) |
| 8 | 11 KV Pilfer Proof Metering cubical |
| 9 | 11 KV CT/PT Double Metering Combined Unit CT/PT |
| 10 | Safe Carriage of 25 KVA T/F |
| 11 | Safe Carriage of 63 KVA T/F |
| 12 | Carriage of other line material |
| 13 | Erection of Single PCC Pole (8.5 Mtr Long) for 11 KV/LT. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 14 | Erection of Single ST Pole (11 Mtr Long) for 11 KV/LT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 15 | Erection of Double PCC Pole (8.5 Mtr Long) for 11 KV HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 16 | Erection of Double ST Pole (11 Mtr Long) for 11 KV HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 17 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 18 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost. |
| 19 | Earthing of Pole as per RESSPO Norms. |
| 20 | Pipe Earthing as per RESSPO Norms. |
| 21 | Digging of trench as per norms and proper laying and commissioning of 11 KV XLPE size 3x70 mm2/3x120/3x185 mm2 cable on Pakka road and its hoisting with providing GI Pipe 6\" dia (GI Pipe will be supplied by the contractor) including road restoration work as per respo norms. |
| 22 | Errection & Commissioning of AB cable 1x25/3x50+1x35+1x16mm2 /3x95+1x70+1x25mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 23 | Fixing of 11 KV Jointing kit (Straight Through/Outdoor) |
| 24 | Installation and commissioning of 11 KV Pilfer Proof Metering Cubical |
| 25 | Installation and commissioning of 11 KV CT/PT Double Metering Combined unit CT/PT |
| 26 | Mounting of 25 KVA T/F with complete fitting. |
| 27 | Mounting of 63 KVA T/F with complete fitting. |
| 28 | Fitting of Three Phase Distribution Box |
| 29 | Cutting of tree branches |
| 30 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required). |
| 31 | (Decentralized Items Provided by the Contractor as per Estimate). |
| 32 | Clamp for Top. Tee Drp, Guard etc. |
| 33 | V-Type X-Arm Holding Clamp |
| 34 | F-Braket with Clamp |