|
| 1 | Dismantling the existing floor tiles and removing away the debris from the site including cost of all labour, rent charges for the tools, lead lift etc complete. |
| 2 | Dismantling the existing PCC Flooring and removing away the debris from the site including cost of all labour, rent charges for the tools, lead lift etc complete. |
| 3 | Dismantling the existing Brick wall in CM in the existing control room including cost of all materials, labour, lead, lift etc complete. |
| 4 | Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shale, murram, gravel stoney earth, earth mixed with small size boulders (SS20B) |
| 5 | Supplying and filling of M sand for foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. |
| 6 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete. (As instructed by the Engineer at site) |
| 7 | RCC 1:1.5:3 using 12 to 20mm(machine crushed) metal for raft concrete without formwork including cost of all materials, lead, lift, etc., complete. (As instructed by the Engineer at site) |
| 8 | RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal with centring shuttering form work including cost of all material, lead, lift,etc, complete, but excluding cost of steel reinforcement(As instructed by the Engineer at site) |
| 9 | Brickwork in CM 1:5 mix using II class chamber bricks of size 9\"x 4 3/8\"x 23/4\" for basement and superstructure including cost of all materials, labour, lead, lift, curing, etc., complete. (As instructed by the Engineer at site) |
| 10 | Flooring with PCC 1:3:6 mix using 40mm HBS metal for flooring (machin crushed metal) including cost of all materials labour lead, lift, etc., complete.(As instructed by the Engineer at site) |
| 11 | Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, lift, etc, complete.(As instructed by the Engineer at site) |
| 12 | White washing two coats with White cement approved qualityover a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc., including cost of all materials, lead, lift, etc., complete. (As instructed by the Engineer at site) |
| 13 | Colour washing two coats with Exterior Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor outside wall including cost of all materials, labour, lead, lift, etc., complete. (As instructed by the Engineer at site). |
| 14 | Colour washing two coats with Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor inside wall including necessary plaster of parry\"s two coats cost of all materials, labour, lead, lift, etc., complete.(As instructed by the Engineer at site) |
| 15 | Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4 mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. |
| 16 | Flooring with approved Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make)laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/sqm, finishing the joints, including cost of all materials, water charges,labour, lead, lift, etc. complete. |
| 17 | Pointing the existing pressed tiles of 20x20x2cm embedded with CM 1:3 mixed with crude oil at 10% by weight of cement mortor including all material, labour, lead, lift etc complete |
| 18 | Supplying and fixing in position of GI angle 50x50x6mm of required length for fixing the cable duct, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the GI angle required length and labour for fixing etc, complete.( As instructed by engineer at site) |
| 19 | Supplying and fixing in position of MS channel 110 x 50mmrequired length for fixing the cable duct side wall, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the MS channel required length and labour for fixing etc, complete.(As instructed by engineer at site.) |
| 20 | Supplying and laying Pvc pipe 110 mm outer dia 6kg / cm2 ISI make for laying the sewer line including cost of pvc pipe coupling labour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete. |
| 21 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. |
| 22 | Supplying and fixing of 375mm (15\") sweepheavy duty AC Exhaust fan with MS/Fibre louvers shutters arrangements of approved ISI quality complete with necessary wall opening and making good of the wall.(As instructed by the engineer at site) |
| 23 | Providing PVC down fall pipe using 110mm dia 4 Kg / Sqcm, PVC pipe and pvc clamp line supreme etc., including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including pvc accessories and washers. |
| 24 | Labour charges for cleaning the clogged septic tank and man hole, removing away the sludge from the site with necessary safety equipments in proper manner etc complete including cost of labour, lead lift etc complete. |