| 1 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth. Removing the top soil in yard. |
| 2 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth. Cable Duct portion. |
| 3 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. |
| 4 | PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete. |
| 5 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete. |
| 6 | Brickwork in CM 1:5 mix using II class chamber bricks of size 9\"x 4 3/8\"x 23/4\" for basement and superstructure including cost of all materials, labour, lead, lift, curing, etc., complete. |
| 7 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. |
| 8 | RCC 1:1.5:3 using 12 to 20 mm HBG machine crushed metal for Precast slab ,including cost of cement and all lead, lift, curing, etc., complete but excluding cost of steel reinforcement. |
| 9 | Plastering with CM. 1:3 mix 12mm thick for fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete. |
| 10 | Colour washing two coats with Cement paint approved colour over Primary coats for out side wall including cost of all materials, lead, lift, labours, etc, complete. |
| 11 | Labour charges for transporting from casting yard to curing tank, curing tank to cable duct , aligning and laying ofRCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete |
| 12 | Supplying and fixing of MS angle for cable duct including aliging in position and including all labour lead lifts etc complete. |
| 13 | Supplying and laying UPVC pipe 100 mm outer dia 6kg / cm2 ISI make for cable duct including cost of UPVC pipe, labour for cutting laying fixingetc complete |