| Sl. No. | Item Description |
| 1 | EARTHWORK EXCAVATION |
| 2 | GENERAL NOTES FOR EXCAVATIONContractorshalltakeallrequiredpermissions fromthe appropriate authorities for Excavation, Blasting, Carting away materials including depositing, levelling etc. and shall bear all the expenses for the same. |
| 3 | Rate includes removal of all kind of vegetation, small shrubs etc. Dewatering water to be let out of the building / site area through proper pipes & channels if required. The contractor at his own expenses shall water very well, ram and thoroughlyconsolidate thebottomofallexcavations & groundbeforetheconstructionoffoundation/footing/plinth beam,fillinginbasementfloororotherworkis commenced. The rate for excavation shall include for shoring sides or trenches with approved timber/steel accessories wherever necessary toprevent sides from falling including bailing or pumping out of water if necessary and include If there are any shrubs, bushes, trees, roots of the trees to be removed for min depth 5’0”. Necessary Lift & lead for all type of excavated materials to convey them and to deposit them as directed by the engineer-in-charge are to be considered. Contour level to be taken jointly with the engineer-in-charge andpriorwrittenapprovaltobetakenbeforestartingany excavation/fillingatevery3/5mtgridsoratregular in travels as directed by the engineer -in-charge for arriving at the actual quantity. Measurements for filling will be taken for consolidated thickness only. Cost toinclude alland necessary royalty and other permission charges required to executetheworks. Unlessnotedotherwisemeasurements shall be considered to the edge of PCC only. |
| 4 | General Excavation by mechanical means in all types of soil includingdensesoil,disIntegrated/weathered/softrock foranytypeof foundationincludingnecessarymanual excavation for dressing the edges & levelling, all leads and liftsbackfillinginlayersof150mmwithwateringand compaction to the required proctor density . Rate to include disposingtheexcessearthandspreadinginlayerstothe requiredlevelswithinthe site wherever specified, dewatering ofbothgroundandsurfacewater, removalofslurrygeneratedwhileexcavationandkeeping theareafreeofwaterwithnecessaryshoring,strutting, required for keeping earth in position etc,. excavating loose pocketsandcompactingthesame.Note:Aut working space andProvision ofslopes ifrequiredfor execution shall not be paid separately. Excavation in all types of soils to any depth belowground level. |
| 5 | Cartingawaysurplusearth/excavatedmaterial /debrisand like materials outside the site and disposing off the same to thedesignated areasasidentifiedbythelocal authorities/engineer-in-charge for dumping of such material, including spreading, compacting etc.,as per the norms by the local authorities etc complete as directed in all respects. |
| 6 | Supplyandfillinginfoundationsandtheareawherever specifiedwithapprovedgoodqualityfillingmaterialsin plinths,sidesofretainingwallalroundthebuilding(i.e backfilling) areadevelopmentetc.whereverspecified in layersofnotexceeding150mmthickincludingbreaking clods,storing,transportation,doublehandling,watering, compactingeachlayerwithvibratorycompactorandat inaccessible places with wooden/steel rammers to achieve 90 to 95% proctor density at optimum moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while backfilling; cost shall include conveyance of all materials, labour, machinery etc. complete as directed. The rate to include loading, unloading,hire and fuel charges for tools and plants and other incidental charges etc., complete as directed. |
| 7 | With approved quality murrum brought from outside. |
| 8 | Filling with available excavated earth (excluding rock) whereverrequiredincludingsidesofretainingwalland in trenches, plinth, sides of foundation etc, in layersnot exceeding 150 mm thick in depth, consolidating each deposited layer by ramming and watering for all leads within the construction site and for all lifts. |
| 9 | ANTI TERMITE TREATMENT WORKS |
| 10 | ProvidingAntitermite treatment inaccordancewith stipulationslaiddownbyIS6313-partIIbyapproved agency with min of 10 years of guarantee including the cost of chemical, precautionary measures etc.complete along retaining walls only for a width of one meter or as specified byconsultants (treatmentforfloor isnot requiredand agency shall be approved by engineer-in-chargeNote: External periphery length of the retaining wall multipliedby1Mwillbeconsideredasthemeasurement area. |
| 11 | PLAIN & REINFORCED CEMENT CONCRETE WORKS |
| 12 | Providingandlayingplaincementconcrete1:4:8using coarsegradedaggregateof40mmanddownsizefor levellingcourseunderfootings,steps,walls,platformetc. includingformworkwherevernecessaryandwell compacted etc. all complete, as directed. |
| 13 | DPC , Copings, Flagging concrete, shaft screed etc., |
| 14 | READY MIX CONCRETE / CONTROLLED CONCRETE |
| 15 | NOTE:RMC SHALL BE PROCURED FROMSITE BATCHING PLANT HOWEVER, IN CASE OF READY MIX CONCRETE PROCURED FROM RMC PLANT THE PROBABLE CONCRETE CAN BE FETCHED FROM (L&T/ IJM/ Redimix). |
| 16 | Providing, batching, mixing,transporting through transit mixers, pumpingandlayingcontrolledReinforcedCement Concrete of specified grade at all levels and heights specified below using ordinary Portland cement of grade 53/ grade 43 from approvedmanufacturer,river sand, 20mm and down size coarse aggregates, necessary Mineral admixturesapprovedbyConsultants(elkemandConplast SP 430SRV from Fosroc or equivalent), includingall leads and lifts, pumping using line pump or boom placer, vibrating/ compaction, scaffolding wherever necessary, curing as directed, excluding cost of shuttering and reinforcement works. |
| 17 | (DesignmixshallbeasapprovedbytheStructural Consultant / Employer\"s representatives |
| 18 | M25 Grade Concrete |
| 19 | Up to basement |
| 20 | (i) Footing |
| 21 | (ii) Grade Beam |
| 22 | (iii) Column |
| 23 | (iv) RCC Flooring |
| 24 | Ground Floor |
| 25 | (i) Column |
| 26 | (ii) Roof Beam |
| 27 | (iii) Roof Slab |
| 28 | (iv) Waist slab |
| 29 | (v) Lintel |
| 30 | (vi) Sunshade |
| 31 | (vii) Sill slab 3\" thick |
| 32 | First Floor |
| 33 | (i) Column |
| 34 | (ii) Roof Beam |
| 35 | (iii) Roof Slab |
| 36 | (iv) Waist slab |
| 37 | (v) Lintel |
| 38 | (vi) Sunshade |
| 39 | (vii) Sill slab 3\" thick |
| 40 | Second Floor |
| 41 | (i) Column |
| 42 | (ii) Roof Beam |
| 43 | (iii) Roof Slab |
| 44 | Providing,fixingreinforcedcementconcreteprecastslab with controlled cement concrete- M20 grade using coarse graded aggregate 20 mm and downsize. Rate shall include forprovidingnecessarycastingplatform,shuttering, finishingtheexposedfacessmoothwherevernecessary and pointing the joints withC.M 1:3,15 mmthickcuring and fixing inpositionetccompleteandasdirected.Rate shall include for fixing MS angles of required size based on the thicknessof precast slab and to be fixed on the edges of the precast slab including grouting the lugs with Cement concrete 1:1.5:3, GI Hooks for lifting the slab etc complete, as directed. Necessary reinforcement MS angles,MS lugs,GIhookswillbepaidseparatelyintherespective items. |
| 45 | 150 mm thick |
| 46 | 100 mm thick |
| 47 | FORM WORK |
| 48 | Providing,fabricatinganderectingformworkatalllevels and places wherever needed/specified as per drawing includingstriking with12mm Plasticcoated,marine resistantwaterproofply/SmoothfinishedMSplates with adjustablesteelpropsofacceptableStagingsystemand withsufficientbracingasapprovedbyconsultant.Costto includedesigningofproperform workandstagingsystem tosuittherequirements, Submissionofdesigncalculations and shop drawings for approval, sealing the joints with heavydutybrownselfadhesivetape,aligningtolineand levelsincludingM.S.Ties,PVCSpacer,Providing openings/ cut-outs/ pockets, applying deshuttering chemical, Deshutteringas approvedby the consultantetc., complete atalllevels,double/tripleheightsandprofilesforNote: Only planareashallbeconsidered. Noextra shallbepaid for Side shuttering of Drop panel/column capitals. |
| 49 | 1) plywood shuttering shall be considered for all vertical elements, beam soffit,corewalls,stairs,ramps,tanks,RCC pedestals Etc.,2) M.S. plates shallbe considered for foundation, slabs only.3) Shuttering & deshuttering sequence shall be 100% ,80% & 40%from the slab to be cast respectively |
| 50 | Up to basement |
| 51 | (i) Footing. |
| 52 | (ii) Plinth beam |
| 53 | (iii) Column |
| 54 | Ground Floor |
| 55 | (i) Column |
| 56 | (ii) Roof Beam |
| 57 | (iii) Roof slab |
| 58 | (iv) Staircase waist slab |
| 59 | (v) Lintel |
| 60 | (vi) Sunshade |
| 61 | (vii) Window sill slab side |
| 62 | First Floor |
| 63 | (i) Column |
| 64 | (ii) Roof Beam |
| 65 | (iii) Roof slab |
| 66 | (iv) Staircase waist slab |
| 67 | (v) Lintel |
| 68 | (vi) Sunshade |
| 69 | (vii) Window sill slab side |
| 70 | Second Floor |
| 71 | (i) Column |
| 72 | (ii) Roof Beam |
| 73 | (iii) Roof slab |
| 74 | IRON & STEEL WORKS |
| 75 | Providing and fixing reinforcement for RCC work with Thermomechanicallytreated (TMT)barofvarious diameters and grade of steel as specified below conforming toISorequivalentBSspecificationincludingcuttingand waste, bending, hoisting, fabricating and placing in position accordingtodrawingsandbindingthereinforcementwith galvanised annealed bindingwireofdoublefoldof18 gauge andprovidingPVC coverblocksforplacingthe reinforcementsinpositionandformaintainingthecover specifiedand/or according to relevant IS or equivalent BS code. |
| 76 | Note : Unless noted otherwise the measurements in accordance with IS 1200 or equivalent BS. However reinforcement shall be measured only in lengths of bars as actuallyplacedinpositiononstandardweightbasis,no allowancebeingmadeintheweightforrollingmargin. Authorised laps and splices, couplers of any dia, Chairs of anyshape&profile,Spacerbarofanyshape&profile, cover block, wastage and binding wire will not be measured and shall be included in the quoted rates. Quoted rate shall bedeemedtohaveconsideredtheabove stipulation. Quotedratetoincludelead,lift,placing atall levelsandasdirected.Detailingofthereinforcement shallbeductiledetailingforseismiczoneIIIasper codal requirement. |
| 77 | Gradeof reinforced steel - Fe 500 |
| 78 | (i) Up to basement |
| 79 | (ii) Ground Floor |
| 80 | (iii) First Floor |
| 81 | (iv) Second Floor |
| 82 | Providing,Fabricatinganderectinginpositionstructural steel conformingto IS 800as cornerangles(50x50x6MM) for columns, Edge angle for Catch pits and wherever specifiedasperdrawings.CosttoincludenecessaryMS flatsforanchorages, holdfasts, anchorbolts, applyingone coatofZincchromate/Phosphateprimerandtwocoatsof firstqualitysyntheticenamelpaintofapprovedmakeetc complete, as directed. |
| 83 | Providingandanchoringinpositionhighstrengthanchor boltsofgrade5.8andspecifieddiaandstandardlengths including necessary drilling up to 150mm depth (min), anchoringandgroutingwithnecessaryequipmentsetc., complete as per specifications ofagency approved by Consultants (HILTI or equivalent) |
| 84 | 16mm dia / 200 long (heavy duty) |
| 85 | 12mm dia / 150 long |
| 86 | MASONRY WORKS |
| 87 | Providing and constructing brick work with best quality well chamberburntmouldedbrickswithminimum compressive strengthof50KgperSq.cm.incementmortar1:5for foundations and basements etc. completeand as directed. |
| 88 | (i) Up to basement |
| 89 | (ii) Ground Floor |
| 90 | (iii) First Floor |
| 91 | (iv) Second floor |
| 92 | Providing and constructing 115 mm thick masonry wall at all levels with approved best quality well chamber burnt mouldedbrickswithminimumcompressivestrengthof50 Kg/Sq.cm in cement mortar 1:4 with M20 reinforced cement concretebinders-80mm thicklaidhorizontally tothefull lengthofthewallat1000mmctcusingcoarsegraded aggregateof12mm anddownsizeandreinforcedwith 8 mm dia. 3 Nos.atbottom & 2 Nosat topand8mm diafor stirrups at 200mm centres using Fe 500 grade steel.Rate shall include for cost of reinforcements and tying in position using binding wire made out of 16 gauge GI annealed or 18 gaugeSS, formwork,scaffolding,rakingoutjoints, curing etc complete and as directed. |
| 93 | (i) Ground Floor |
| 94 | PLASTERING . |
| 95 | Plasteringofceilingincludingslabs,beamsandcolumn drops and staircase waist slab with CM 1:3, 6 mm thick with a neat floating coat of cement for smooth finish according to thespecification.Therateshallincludenecessary scaffolding, formworkand curingetc.completeallas directed. |
| 96 | (i) Ground Floor |
| 97 | (ii) First Floor |
| 98 | (iii) Second Floor |
| 99 | Plastering of walls with cement mortar 1:4, 12 mm - 15 mmthick with a neat floating coat of cement for smooth finish according to specifications. RateshallincludeforprovidingG.I.chicken meshmadeoutofgalvanisedironofnominalthickness0.35mmwithaZinccoatingof120gmsperSqmatthe junctions of masonry and concrete works to a width of 100 to125mmincludingtyinginpositionwithsuitable clamps/screws, necessarystaging,scafoldingandcuringat all levels and elevations etc.complete as directed. |
| 100 | (i) Ground Floor |
| 101 | (ii) First Floor |
| 102 | (iii) Second Floor |
| 103 | Plasteringforexternalsurfaceswithbasecoatof12 mm - 15 mm thickinC.M1:4withwaterproofingcompoundof“CICO No.1 or equivalent“ as per Manufacturer\"s Specification and finishingcoatof10mmthickinC.M1:3afterroughening thesurfaceoffirst coatin greenconditionwithwire brush andclearingoflooseparticleswith spongefinish(washed sand finish) all complete as per specification and as directed. Rateshallincludeforprovidingdripbands/ moulds / grooves to any size and shape as directed. |
| 104 | (i) Ground Floor |
| 105 | (ii) First Floor |
| 106 | (iii) Second Floor |
| 107 | Providing 15 mm thick water proof plaster in Toilet internal walls , Under ground Sump andoverheadtankwith CM1:3withwater proofing compound of CICONo:1 orequivalent as per manufacturer’s specificationand rougheningthe surfacein green condition with wirebrush and clearing of loose particles with spongebrush (washed sand finish) |
| 108 | FLOORING AND DADOOING WORKS |
| 109 | ProvidingflooringwithPremiumqualityJohnson Marbonite or approved equivalent make vitrified floor tiles (seamless)confirmingtoISO13006/EN176 GroupBIa withtech.specificationasMohsscratchhardnessgreater than6,WaterAbsorptionof0.06%,ModulusofRupture greaterthan27N/mm,DeepAbrasionresistantlessthan204mmcube,Surfaceflatness,Straightnessofsides± 0.25%,thickness±5%ofsizeofapprovedcolour and size & thick as specified below, setin Laticrete adhesive L 290andpointingwithLaticretemakeLatapoxy SP100of approvedmake,tomatchingcolourshadeasper Manufacturer\"sSpecificationandasdirected. Rateshall includeprovisionofPVCspacersof3mmwithpolymer epoxygrout,wastages,forpreparationofbasesurface, cleaning,acidwash,andfinishedsurface,protectionwith Gypsum / PoplayeroverPlastic sheet and removing the same before handing over,work atall levels and as directed. Rate shall be inclusive of forming pattern as shown in dwg and wastages etc; complete. |
| 110 | VitrifiedTile - polished of approved Colour .Size 600 mm X 600mm - 9mm thick. |
| 111 | (i) Ground Floor |
| 112 | (ii) First floor |
| 113 | Providingandfixingsteprisersandtreadswithapproved colourgraniteslabofthicknessnotlessthan22mmin single piece foreach step patterned as per drawing over a bedofC.M1:4,20mmthick,alledgesmachinecut, machinepolishedincludingcutting,FlametheGranitefor theentirewidthofthesteps (Entrancesteps),asper manufacturers specification andasdirected.Rateshall include for preparation of base surface, jointing with matching cement slurry and finished surface protection with gypsum/POPlayeroverplasticsheetandremovingthe same before handing over, work at all levels etc complete, all as directed. |
| 114 | Providing Dadooing with PremiumqualityKajaria/ Johnson/Bell/ So many make confirming to IS 13755 glazed tileranges,withscratchresistanceofminimum3,Water absorption greater than 10 % Deviation in length , Thicknessofmaximum+0.5%,Wedgingwar pageof maximum +0.6%, Abrasion resistance IS 13630(part-2),Bendingstrengthofminimum150kg/cm2andThermal shockresistantto10cyclesetc.,aspermanufacture\"s specificationandsizes aslistedbelow setin Laticrete adhesiveL290toathicknessof 6mmandjointingwith LatapoxySP100ofLaticretemakeallasper manufacturer\"sspecification,atalllevelsand asdirected. Rate shall include for preparation surface, wastages, smooth joint, cleaning and acid wash etc. complete and as directed. |
| 115 | (i) Size 200x300mm/ 250 x 400mm/ 250 x 350mm-7 mm tk. |
| 116 | ProvidingandfixingofPVCInnerCornerTileBeading/ External Round edge trimsofM/s Arpitha Exportsor approved equivalent of nominal thickness 1.2 mm of approved Colours & required depths forvertical and Horizontalcornersandedgeslincluding preparationof surfaceetc.allcomplete, asdirectedbytheEngineer-in- charge. |
| 117 | JOINERY WORKS |
| 118 | ProvidingandfixingFirst class Teakwood( confirming to IS specification ) Doorframesof size 6\" x 4\" and Teakwood Double Shutter with the design approved by Department including necessarypins,nails,screwsand bolts etc.Rate shall include for costof bolts,nuts,screws, nails,pins,Hot dipgalvanisedMS approvedholdfast and concrete block grouting for fixing hold fast, anchor fasteners/ coachscrewsandincludingPolishing Door frame and shutter etc. complete, as directed ,with hardwares as below ( Main Door) |
| 119 | i) Hardwares :i)Hinge:ProvidingandfixingStainlesssteelsatinfinish double ball bearing butt hingeswith SS screws of size 100 x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from DormaorapprovedequivalentmakesuitablyforSingle/ Doubleleafdoor.StainlesssteelconformingtoSS316L gradetoBS7352orBSEN1935-2002.4NosforSingle Leaf Shutter and 8 Nos for Double Leaf Shutter. |
| 120 | ii) Provision :i) Provision / fixing arrangements to be made in the shutter aswellasintheframetoreceive/fix theHinges,Locks, Electro magnetic latch, Electro magnetic contact for hooter with reinforcementpadsand in sucha way to connectthe same to the card access control system / IBMS.ii)Referhardwarescheduleenclosedforthedetailsof Mortise sash lock, Mortise dead lock, Handles, Push plates andPanicbaretc.Necessaryprovisionshallbemadein the frame and shutter to receive and fix the hardwares.iii)SupplyingMasterkey forthedoorseitherfloorwiseor wingwiseaspertheMasterkeyplanincludingsupplying Grand Master key for all the doors. |
| 121 | Main Door |
| 122 | Supplying and Fixing of Flush door of 35mm thick with door frame of size 5\" X 3\"with all accessories including making necessary pockets in the masonry ,Fixing with concrete ,Both side fixed with 1mm thick Laminate sheet (Total thickness of door 37mm) including the cost of providing Teak lapping of 12mm, 25mm thick alround.Rate includes |
| 123 | (a ) Hardwares :i)Hinge:ProvidingandfixingStainlesssteelsatinfinish double ball bearing butt hingeswith SS screws of size 100 x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from DormaorapprovedequivalentmakesuitablyforSingle/ Doubleleafdoor.StainlesssteelconformingtoSS316L gradetoBS7352orBSEN1935-2002.4NosforSingle Leaf Shutter and 8 Nos for Double Leaf Shutter. |
| 124 | (b) Provision :i) Provision / fixing arrangements to be made in the shutter aswellasintheframetoreceive/fix theHinges,Locks, Electro magnetic latch, Electro magnetic contact for hooter with reinforcementpadsand in sucha way to connectthe same to the card access control system / IBMS.ii)Referhardwarescheduleenclosedforthedetailsof Mortise sash lock, Mortise dead lock, Handles, Push plates andPanicbaretc.Necessaryprovisionshallbemadein the frame and shutter to receive and fix the hardwares.iii)SupplyingMasterkey forthedoorseitherfloorwiseor wingwiseaspertheMasterkeyplanincludingsupplying Grand Master key for all the doors. |
| 125 | (c) AutomaticdoorcloserModelNo.TS92camactionG (Push/Pullside)orB(Push/Pullside)EN2to4ofDorma make. (Door closer shall be provided to suit the type of door opening / opening policy specified.I.e.. Double/ Single leaf andPush / pullside)withallotheraccessories.(Touse Shutter width up to 1100 mm) |
| 126 | Supplying & Fixing for Solid FRP Frame of size 3\"x3\" and Solid FRP plain shutter of thickness 25mm(3\"0\"x7\"0\" ) with all accessories etc, complete. |
| 127 | Supplying and fixing Window Grills fabricated with 12 mm Sq .polished steel rods at 5\" to 6\" distanceby making slots ,welding , grinding and finishing and applying one coat of red oxide primer. The cost includes making pockets in masonry,fixing the grills, packing the the pockets with concrete and finishing,etc. |
| 128 | Providinganderectinginpositionincludingassembling, fittingandfixingapprovedmakeMSpaintedplainrolling shuttermade out of 20 Gauge MS links to a width of 75 mm with10mm dia.harddrawnseamlesstubesandtheend sealedwith mild steel clips etc.conformingto IS specification. |
| 129 | The side MS guide channel shall be 75 x 25 mm (10 gauge) weldedlugsfixedtowall/Column,10gaugereinforced lock plate riveted to 40 x 40 x 6 mm angle with 40 x 40 x 6 mmstiffenerweldedonrearsidewithnecessarylocking arrangementsforbothsidesincludingpiperoller conformingtoIS4454,allcompleteincludingtopcover/ hoodforrollingshutterasperspecification forvarious structural openings, etc. complete,as directed. Rate shall include fortwo coats offirstqualitysynthetic enamel paintovera coat ofzinc phosphate primer, necessary tools & plants, welding and consumables, etc. complete,as directed. |
| 130 | Note : Clear structural openingwill be measuredand paid for.The hood/ hood coverareawill notbemeasured separately. |
| 131 | Specificationsameasabove,butforprovidingM.Splain rolling shutter duly painted including all accessories.Note : Clear structural opening will be measured and paid for.The hood/ hood coverareawill notbemeasured separately. |
| 132 | Supplying and fixing UPVC (un-plasticized polyvinyl chloride) windows/ Ventilators of casement type (open) from the profile the size of outer frame 60mm X 58mm and shutter profile are reinforcement with GI/1mm 125 GM and 100% corrosion free, the profiles aremulti chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter. The shutter will provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loos. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive engineer before use on work. |
| 133 | (a) UPVC Windows |
| 134 | (b) UPVC Ventilators |
| 135 | Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thickin between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, etc. complete. |
| 136 | PAINTING AND FINISHING |
| 137 | Applyingwhitewashingtwocoatstoceilingsandwalls with pure shell lime or fat limeconforming to IS-712 all as perSpecificationandasdirected. Forshaft ,liftinterior walls. |
| 138 | (i) Ground Floor |
| 139 | (ii) First Floor |
| 140 | (iii) Second Floor |
| 141 | Providingtwocoats of \"PLASTIC \"emulsion paint to walls/ceilingofapprovedcolouroveracoatofwaterbased primer includingpreparationofsurfaceby thorough cleaningandwettingandapplyingtwo coats of Cement base wall puttyaspermanufacturer’sspecificationfullytogivean evenshadebeforepaintingandcuring asper manufacturersspecificationsandas directed. |
| 142 | (i) Ground Floor |
| 143 | (ii) First Floor |
| 144 | (iii) Second Floor |
| 145 | Providingtwo coatsof \"Dulux Weather shield Max paint of approvedshade andcolour over a coat of ICI Exterior acrylicPrimer,includingpreparationofsurfaceby through cleaningandwettingbeforepaintingandcuringallasper manufacturer\"s specification and as directed. |
| 146 | (i) Ground Floor |
| 147 | (ii) First Floor |
| 148 | (iii) Second Floor |
| 149 | Painting new iron works such aswindows grills , Rolling Shutters etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approvedbefore use on works.) |
| 150 | Painting new wood work with two coats of synthetic enamel ready mixed paint of approved quality and colour over one coat of priming coat in all floors including the cost of paint etc., complete |
| 151 | WATER PROOFING WORKS |
| 152 | NOTE:Specializedagencytobeapproved byClient/ Consultants.PRINCIPALMANUFACTURERSHALLGIVE GUARANTEEFORSTIPULATEDTIMEFORTHE WATERPROOFINGWORKSDONE AT SITE. All surfacesto be waterproofed should be sound, clean and dry. Concrete surfaces should have a light steel-trowel followed by afinehair-broomorequivalentfinish,whichisdry and freeofdust,oilandothercontaminants.Allhighspots shouldberemoved.Mossandlichenmustberemoved physically followed by treatment with fungicidalwashto kill any spores and inhibit further growth. After treatment wash down thoroughly with clean water and allow to dry. Grouting periphery of spout pipes with water insensitive epoxy, pressuregroutingofconstructionjointsandhoneycomb areas with cement grout, proper preparation of the concrete surfacebymechanicalmeans/hydroblastingtoensurea goodbondbetweenthetoppingandthesubstrate, Testing of the surfacesprior to start the work, aftercompletion and afteraperiodofonemonthaftercompletion by ponding,grouting or sealing of joints, making vita at corners/ rates Contractor shall give both material and performance go the approved format. |
| 153 | Treatment on Toilet floor slab, junctions of floor slab & wall andsidewallsin toilets internalsurfacesetc. coveringthe following sequence of operation: |
| 154 | a) Providingandapplying water repellantnanotechnology coating system over well prepared dry surface covering the surfaceareaof30sqmperlitrebymixingratioofthe componentwithwaterin1:10byvolumei.e.(onelitreof ZYCOSILofZYDEX makeorapprovedequivalentand10 litres of water) |
| 155 | b) Providing, supplying, mixing, applying two coats of ready tousetwocomponentAcrylicpolymermodifiedcement based,flexible,waterproofingslurrylike TAPECRETEor approved equivalenttoathickness of2mmoverthe plastered surface of operation above. |
| 156 | c)Providing,supplying,mixing,layingcementplaster15 mm thick with cement mortar 1:4 mixed with water proofing compoundlikeCICONO:1(normalsettingintegralwater proofingcompound)orapprovedequivalentconformingto ISattheratespecifiedbythemanufactureroverPCC levelling course at any depth below finished floor level. |
| 157 | Rate shall include for preparation of surface by mechanical upgradingtoremoveallloosemortarandlaitance,oil, grease etc. and washing the surface with water to get neat surface, dewatering, finishing, curing, scaffolding, waterproofingchemicals,wastage,conveyance,toolsand plants, mixing device and gauge, shuttering,etc. complete as per manufacturer\"s specification and as directed. |
| 158 | Supplying and filling for sunken slab area with brickbat coba usinghalfbricks/fullbricksasper specificationby adding CICO NO:1 or approved equivalent admixture at the specified in the manufacture\"s specification after entire completionoflaying pipes,sanitary fittingsetc. Rateshall include for preparation of surface, protecting the laid pipes and sanitary fittings, finishing the surface smooth to receive the top coat of water proofing application etc. complete and all as directed. |
| 159 | Treatment to topofbrickbatcobain sunkenslabcovering the following sequence of operations : |
| 160 | a) Providingandapplying water repellantnanotechnology coating system over well prepared dry surface covering the surfaceareaof30sqmperlitrebymixingratioofthe componentwithwaterin1:10byvolumei.e.(onelitreof ZYCOSILofZYDEX makeorapprovedequivalentand10 litres of water) |
| 161 | b) Providing, supplying, mixing, applying 2 coats of ready to use2componentacrylicpolymer modifiedcementbased, flexible, water proofing slurry like TAPECRETE or approved equivalent toathickness of2mmovertheplastered surfaceofoperation(a)above includingpreparationof surface,dewatering,finishing,curingetc.allcompleteas per manufacturer\"s specification and as directed. |
| 162 | c)Providing,supplying,mixing,layingcementplaster15 mm thick with cement mortar 1:4 mixed with water proofing compoundlikeCICONO:1(normalsettingintegralwater proofingcompound)orapprovedequivalentconformingto ISattheratespecifiedbythemanufactureroverPCC levelling course at any depth below finished floor level. |
| 163 | Rate shall include for preparation of surface by mechanical upgradingtoremoveallloosemortarandlaitance,oil, grease etc. and washing the surface with water to get neat surface, dewatering, finishing, curing, scaffolding, waterproofingchemicals,wastage,conveyance,toolsand plants, mixing device and gauge, shuttering,etc. complete as per manufacturer\"s specification and as directed. |
| 164 | Water proofing treatment over RCC roof slab laid to slope in terracecoveringthe followingsequenceof operation and specifications:a) The roof slab laid in slopeshall be thoroughlycleanedbyremovingthedebrisanddust,to receive the water proofing treatment. |
| 165 | b) Providingandapplying water repellantnanotechnology coating system over well prepared dry surface covering the surfaceareaof30sqmperlitrebymixingratioofthe componentwithwaterin1:10byvolumei.e.(onelitreof ZYCOSILofZYDEX makeorapprovedequivalentand10 litres of water) |
| 166 | c)Applying2coatsofacrylicpolymermodifiedcement based,flexiblewaterproofingslurrylikeTAPECRETEor approved equivalent make to a thickness of 2mm and cured for 7 days and as per manufacturer\"s specification. |
| 167 | d) Supplying, providing and applying water proofing treatmentwithMembrane typewater proofing methods usingpolymermodifiedBituminousmembraneofCICO shield/BuildWrap/Deboerorapprovedequivalentmake. TheAtacticPoly-Propylene(APP-4mmth)membrane having UV resistant, ground chemical resistant, high melting pointmorethan110deg.C,flexibleandelasticwithhigh adhesivestrength.The membrane shall bereinforcedwith nonwovenpolyesterreinforcementofminimumof180 g/sqmandreinforced includingcoating withcompatible primer of Bituminous base and torch application with overlapof100mmwhereverrequired.Thereinforcement providedshallbeabletowithstandthetrafficflowdensity during&afterconstruction and shallcarryaminimum guaranteeperiod of 10 years. Cost to includeapplying the primerandtorchingtheentiresurfaceandalso prefabricated overlap at ends. The membrane surface shall be protected with granules. |
| 168 | e)Providing, supplying & laying extruded polystyrene rigid foampanelofsize600x1200mm-75mmthickofformula R.Metric-FM 50 having a density of 24 kg/cum and compressive strengthnotlessthan250kpaofowns corningorapprovedequivalentmakehavingexceptional mechanicalpropertieslikeresistancetothediffusionof water vapour, resistance to water absorption, uniform densitydistribution,dimensionalstability,veryhigh compressivestrength,agingresistanceandalsoimmunity againstinsects,pets,bacteria,rodentattacksandmicro organisms etc., for over deck insulation including necessary skin shiplap joint,anchores,adhesives, primers etc., as requiredforproperfixingetc.,completeallasperthe manufacturersspecifications&consultantsapproval.The extrudedpolystyrene panelhasclosedsealedcells structure linked to one another is produced by a continuous, fully automated extrusion process in accordance with international specification and standard etc. all complete. |
| 169 | f)Layingfibreglassclothovertheextrudedpolystyrene rigid foam panel. |
| 170 | g) A layer of 20 mm thick cement mortar 1:4 admixed with CICO NO - 1 (normal setting integral water proofing compound)orotherapprovedequivalentmakecompound shallbespreadovertheoperationspecifiedinpoint(f) aboveandlayingbrickbatcobaoverthesurface40mm thickness at drain point and required thickness at ridgeshall be placed with cementmortar 1:4, admixed with CICO NO:1 @ 2% by the weight of cement and add RECRON 3S 225 per bag(The rate shall be quotedfor an average thickness of 110 mm). |
| 171 | h) Supplying and Laying one Course of 20mm thick 200X200mm size machine pressed west coastWeathering tiles of approved quality over a bed mortar of 1 of Cement :3 of sand mixedwithcrude oil 5% by weight of cement or any other Equivalent water proofing material ( as per manufactures specification ) all completed ( thick ness of bedmortar is 12mm) |
| 172 | Rate shall include for preparation of surface by mechanical upgradingtoremoveallloosemortarandlaitance,oil, grease etc. and washing the surface with water to get neat surface, dewatering, finishing, curing, scaffolding, supply and adding water proofing chemicals at the specified proportionas per manufacturer\"s specifications,all materials,wastages,conveyance,toolsandplants,mixing deviceandgauge,shutteringandalsoincludefor conductingleakagetest atterraceby storingwateronthe terrace for about 25 mm depth continuously for a period of 7 days etc.complete, as directed. |
| 173 | PLUMBING & SANITARY works |
| 174 | Supplying, Installing, testing and commissioning of white glazedwall hung Europeanwater closetwithcistern and necessary water connectionR15mmwithintegratedanglestopvalve,protectioncoverforservice opening to be cut to the length, WC outlet bend, WCconnection set dia 90 mm, 2 threaded rods M12 for ceramics fastening, with 4 adjustable fastening brackets, with fasteningmaterials,withtheactuatorplate,completeandtheEWCshallbewith necessarycheck nut, stopcock etc., solid seat and cover with polythene buffers and flap, CP flanges, CP bolts and nuts, a pair of CI chair bracket with nuts and bolts etc., complete. |
| 175 | Sanitaryware Make : Hindware |
| 176 | Model No. Studio 20061 |
| 177 | CP fittings :Jaquar |
| 178 | Cistern Make :Hindware/Ivory white |
| 179 | Supplying,fixingof110mmdiastraighttypestraightsyphonUPVCWCpan connector with neoprene rubber ring and necessary accessories etc., complete. |
| 180 | Installing,testingandcommissioningglazedIndianwatercloset(OrissaPan) withPVCPtrap,with10litrescapacity polypropylene flushingcisternwith internal fittings, fixed at medium level, with 32mmdia. ABSflush pipe connecting the cistern up to thecloset,15mmdia.CPanglevalvewithPVC inlet connectionpipe,CPwall flanges,C.P.Extension nipple etc.,complete. The rate includes for embedding the closet in 1:3:6 plain cement concrete using 20mm and downgrade aggregates and finishing flush with finished floor level. |
| 181 | Sanitary ware Make : Hindware |
| 182 | Size: 53 x 41Cm |
| 183 | Supplying,installing,testingandcommissioningovalwhite glazed washbasin countertoptype,32mmdiaCPwastecoupling32mmdia.CPbottletrapwith extension pipe pair ofstainless steel bolts , with bracket (MS / CI)tosupport the basin, 1 No. sensor tap with 15mm CP angle valve with 450mm longheavy duty CP inletconnecting pipe CP wall flanges all of approved make etc., complete. |
| 184 | Sanitaryware : |
| 185 | Make : Hindware |
| 186 | Model : 10049 |
| 187 | CP fittings : Jaquar |
| 188 | Waste coupling - 709 |
| 189 | Bottle trap - 769 |
| 190 | Angle valve - 053 |
| 191 | tap - Model no 6011 |
| 192 | Supplying, installing, testing and commissioning of 50%colour glazed large flat back urinalswith40mmdiaCPwaste coupling withdometype grating,40mmdiaCP bottle trap / P trap with extension pipe, urinal spreader, 20mm dia C.P. , SS bolts and nuts to fix the urinal with Push cock , hangers and brackets complete with wall flanges. |
| 193 | Sanitary ware make : Hindware |
| 194 | Model No :60002 |
| 195 | CP fittings : Jaquar ( Continental ) |
| 196 | Bottle trap - 769 |
| 197 | Supplying, installing and testing 15mm CP health faucet and angular stop cockof approved make with necessary CP flexible hose 750mm long nozzle, CP wall flange complete. |
| 198 | Make : Jaquar |
| 199 | Model No : 563 |
| 200 | Range : Continental |
| 201 | Angle Stopcock - 053 |
| 202 | Supplying and installing CP toilet paper holder fixed with SS screws complete. |
| 203 | Make : Jaquar |
| 204 | Model :21751 |
| 205 | Supplying, fixingapprovedmakeCPtowelringfixedwithSSscrewsnearwash basins. |
| 206 | Make : Jaquar |
| 207 | Model :1121 |
| 208 | Supplying, fixing CP twin coat hook fixed with SS screws on the toilet door. |
| 209 | Make : Jaquar |
| 210 | Model :1161 |
| 211 | Supplying, FixingABSsoapdispenserwith necessary fixingscrewsandclamps etc., complete. |
| 212 | Make : Kimberly - Clark |
| 213 | Supplying , fixing & testing Two waybib cock with CP flanges including necessary fixing materials etc., complete. |
| 214 | Make : Jaquar |
| 215 | Supplying,installingandtesting15mmCPbibcockwithCPflangesincluding necessary fixing materials etc., complete. |
| 216 | Make : Jaquar |
| 217 | Model No. - 0-49 |
| 218 | Supplyingandfixingofblack/greypolishedbothsides,20mmgraniteurinal partition fixed with SS bolts and nuts to wall complete etc., |
| 219 | Size: 1200mm x 600mm |
| 220 | Supplying , fixing of 150mm dia CP greating / cockroach greatings |
| 221 | Make : Jaquar |
| 222 | Supplying and fixing best quality mirror ofapproved make,thickness 6mm(plain glass)withcopperbackingfixedto8mmthickplywood sheetwithCPhooksand mirror screws \"and providing with teak wood frame for all the sides of the mirror with clamps etc., complete. |
| 223 | (The frame shall be approved by the Architect/Client) |
| 224 | SOIL ,WASTE ,VENT AND RAIN WATER PIPES . |
| 225 | Supplying, fixing and testing PVC soil, waste and ventilating pipes (SWR) conforming to IS:13592 / 1990 -Type B (6 kg / Sq cm) with rubber ring (confirming to IS : 5382) joints inclusive of all necessary specials like bends, tee, offsets, door bends junctions, cowls etc., laid under floor / fixed on walls and in pipe shaft etc., complete. |
| 226 | a)65 mm dia. (Clear ID) |
| 227 | b)75 mm dia. (Clear ID) |
| 228 | c)110 mm dia. (Clear ID) |
| 229 | Supplying, fixing & testing PVC pressure pipe (6 Kg / Sq cm) confirming to IS 4985 for waste connections from wash basin, kitchen sink to floor trap with solvent cement joints, including all the fittings laid under floor concealed in wall etc., The work shall includewallchaseandmakinggoodthesameincementmortorcompletetothe satisfaction of engineer-in-charge. |
| 230 | a) 40mm dia (Inter dia.) |
| 231 | b) 50mm dia (Inter dia.) |
| 232 | Supplying, fixingand testing PVCrainwater pipes conformingtoIS13592 -1992 (SWRClass A- 4kg/cm2) with all fittings like shoes, bends fixed in the pipe shafts (ducts) fittings likeshoes, bends fixed in the pipe shafts (ducts) fittings like shoes, bends fixed in the pipe shafts (ducts) with suitable supports etc., complete. |
| 233 | a ) 160mm dia |
| 234 | b ) 110mm dia |
| 235 | Supplying, installing, testing and commissioning of PVC floor trap with multi inlet type and 75mm dia. outlet fixed on a bed of cement concrete with 150 x 150mm stainless steel hinged type frame and grating (Heavy duty type)etc, complete. (The frame and grating shall be approved by Architects) -AHU rooms |
| 236 | Supplying, fixing and testing PVC floor trap withbrass CP frame and threaded cover for urinals ( 150mm x 150mm ) trap of 100mm diainlet and 75mm dia outlet fixed on a bed of cement concretewith (Heavy Duty type) etc., complete. |
| 237 | (The frame and grating shall be approved by Architects) |
| 238 | Drilling with core cutting machine in RCC beams, slabs floors etc., for laying pipes and rendering the same in RCC 1:2:4, finishing the same to the satisfaction of the Owner or his authorized representative etc., including nominal reinforcement wherever required, complete. The quoted rate shall also include for providing EPOXY based water proofing compound for sealing the joints around the pipes. |
| 239 | a) RCC beams |
| 240 | 25mm dia upto 50 mm dia. |
| 241 | 50mm dia upto 110 mm dia. |
| 242 | 110mm dia. up to 160 mm dia. |
| 243 | 25mm dia up to 50 mm dia. |
| 244 | 50mm dia up to 110 mm dia. |
| 245 | 110mm dia. up to 160 mm dia. |
| 246 | Supplying, fixing and testingP trap as shown in drawing with 200mm x 200mm SS grating (Heavy duty) with 200mm x 200mm SS grating with necessary fixing materials and cementconcrete 1:3:6 alround the trap for collection of waste water in alround the trap for collection of waste water in basement floor . |
| 247 | a) 110 mm dia.Inlet and Outlet |
| 248 | INTERNAL WATER SUPPLY |
| 249 | Providing ,fixing, testing and commissioning of UPVC SCH-40 pipes confirming to ASTM D- 1785, including all fitting UPVC SCH-80 conforming to ASTM D 2467, like tees, elbows ,bends, unions, coupling, reducer tees, collars etc.The work shall include cutting jointing with solvent cement pressure testing the joints/pipeline for 10kg/sq.cm pressure. |
| 250 | a) 20 mm dia |
| 251 | b) 25 mm dia |
| 252 | c) 32 mm dia |
| 253 | d) 40 mm dia |
| 254 | e)50 mm dia |
| 255 | Supplying, installing and testing approved make Bronze Ball valves conforming to IS standard with unions etc., complete. |
| 256 | a) 20 mm dia |
| 257 | a) 32 mm dia |
| 258 | b) 40 mm dia |
| 259 | Supplying, installing, testing and commissioning Bronze butterfly valves with standard lever confirming to IS 13039 with necessary flanges, nuts and bolts etc., complete. |
| 260 | a) 50 mm dia |
| 261 | b) 65 mm dia |
| 262 | c) 80 mm dia |
| 263 | Supplying, installing, testing and commissioning approved makefloatoperated ball valve with PVC heavy duty float confirming to IS 9762 etc., complete. |
| 264 | 50mm dia |
| 265 | EXTERNAL SEWAGE SYSTEM |
| 266 | Excavation inalltypes ofsoilforlaying pipes up to300mmdia.including forming bottom surface to required level, refilling selected excavated earth around the pipe in layers 150mm thick, watering, consolidating and disposing off the surplus earth with in the sitewith a lead as directed by the site engineer complete. |
| 267 | a) Depth up to 1.50 M. |
| 268 | Supplying, laying, jointing,testingofPVCagriculturalpipegrade{6kg/cm2}with solvent cement, further protected with FRP paste, including laying 100mm th PCC bed cement concrete of 1:3:6, below the pipe to the width of the trench and haunching thepipeuptothepipetopwithcementconcrete1:3:6andtestingofjoints,etc., complete |
| 269 | a) 110mm dia |
| 270 | Constructionof inspectionchamber with230mm bestqualityapprovedTable MouldedbricksinCM1:4overabedof100mmthickPCC1:4:8,internalwalls plasteredin \"CM 1:3 and external wall with CM 1:3 with sponge finish, benching and channelling in PCC 1:4:8. Supplying and fixing CI square frame & cover of size 600 x 600mm(weight 110 \"Kgs.)PVC steps in position as perthe detailed drawing. The quoted rate shall also include necessary excavation and back filling etc., complete. |
| 271 | a) 450mm x 450mm(heavy duty FRP frame) upto 600 mm deep |
| 272 | b) 600mm x 600mm (heavy dutyFRPframe) from 600 mm to 1000 mm deep |
| 273 | Construction of Septic tank with CR masonary in cm1;5 (or) Brick masonary with RCC Wallof clear size 2.m X 1.2m X 3.0 mwith necessary soak pit. |
| 274 | EXTERNAL WATER SUPPLY |
| 275 | Providing ,fixing,testing and commissioning of UPVC SCH-40 pipes confirming to ASTM D- 1785, including all fitting uPVC SCH-80 conforming to ASTM D 2467, like tees, elbows ,bends, unions, coupling, reducer tees, collars etc.The work shall include cutting jointing with solvent cement pressure testing the joints/pipeline for 10kg/sq.cm pressure. |
| 276 | a) 25 mm dia |
| 277 | b) 32 mm dia |
| 278 | c) 40 mm dia ( Bore well to Sump / Tank ) |
| 279 | d) 50 mm dia ( Bore well to Sump / Tank ) |
| 280 | Excavation in all types of soil for laying water supply pipes upto 100mm dia.including forming bottom surface to required level, refilling selected excavated earth around the pipeinlayers150mmthick,watering,consolidatinganddisposingoffthesurplus earth within the site as directed by the site engineer with a lead of 200M complete. |
| 281 | Depth upto 1.25M |
| 282 | Construction of valve chamber with 230 mm best quality TM bricks in CM 1:4 over a bed of 100mm thick PCC 1:4:8, internal walls plasted smooth in CM 1:3 and external walls plasterd rough with sponge finish including curing with all necessary leads and liftand providing heavy duty castironcoverwith framewith lockingarrangements etc.,completeincludingHeavydutycastironcoverofsize600x600(weight \"115Kgs.) Size of chambers For valves up to 80 mm dia |
| 283 | size: 0.6m x 0.6m x 1M (clear dimension) |
| 284 | Drilling of 6\" dia bore well anywhere with in the site including transportation all labours for inserting PVC Casing pipe and flushing of bore etc complete. |
| 285 | a)0 - 500 ft |
| 286 | b)500 ft - 600 ft |
| 287 | c)600 ft - 700 ft |
| 288 | d)700 ft - 800 ft |
| 289 | Supplying and fixing IS make PVC casing pipe up to hard surface |
| 290 | Supplying and erecting, comnissioning of 3 phase 6\" bore well motor 7.5 Hp 8 Stage, with stainless stell shaft , bronze impeller and stainer with brass screws,water lubricated bearings with sand guard includingPannel board with MCB, Voltmeter, Ammeter,Starter etc, complete. |
| 291 | Supplying and laying4core4 sq mm armoured copper cable including earthwork, laying , terminal connection and re filling the trench,and levelling etc, complete. |
| 292 | Supplying and laying 4 core 4 sq mm flexiable copper cable from starter andjointing of cable with bore well motor with suitable arrangement etc, complete |
| 293 | Supplying and erecting UPVCcolumn pipe of IS make of suitable length including couppling pipe clamp etc, complete. |
| 294 | a)40 mm dia |
| 295 | b)50 mm dia |
| 296 | Supplying, installing and testing approved make GM N.R.V (Cheak Valve)conforming to IS 5312 with unions etc.,complete. |
| 297 | a)40 mm dia |
| 298 | b)50 mm dia |
| 299 | Construction of Under ground Sump 12,000 lits. Capacity with Water tight RCCBottom , wall and top slab, finishing with water proof Compound , 600 X 600 MM Heavy Duty FRB manholr, etc. complete. |
| 300 | Construction of Overhead tank of 3,000 lits. Capacity with Water tight RCCBottom , wall and top slab,in oper terace / Above stair case finishing with water proof Compound , 600 X 600 MM Heavy Duty FRB manholr, etc. complete. |
| 301 | Supplying and fixing 1 HP / 1.5 Hp Submerciable motor of ISI brand for pumbing water from UG Sump to OHT. Including Laying wiring from DB etc,. Complete. |
| 302 | INTERNAL AND EXTERNAL ELECTRICALS |
| 303 | Wiring with 2x1.0sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with module white cover plate with frame (Plastic) with 1 module flush mounting box (GI) and 6A 1 way SP 1 module switch (Higher End make) and making good of the concealed portion with suitable colour for PVC concealed light/fan Point (For electronic regulator) (3 Points Per Coil). |
| 304 | a)Shops |
| 305 | b)Office Ground Floor |
| 306 | c)Office First floor |
| 307 | Wiring with 3x1.5sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 1 module white cover plate with frame (Plastic) covered with 1 module flush mounting box (GI) and 6A 2 way SP 1 module switch (Higher End make) and making good of the concealed portion with suitable colour for concealed staircase light point. |
| 308 | Supply and fixing of single box type 20W 4 Feet LED fitting with LED tube with inbuilt surge arrester (Higher End) complete with TW round blocks on wall or ceiling with PVC unsheathed copper leads from terminals to the fitting. |
| 309 | a)Shops |
| 310 | b)Office Ground Floor |
| 311 | c)Office First floor |
| 312 | Supply and fixing of 24W LED 2x2 square type surface/recessedLED fitting with in built surge arrester (Higher End) on ceiling / false-ceiling with PVC unsheathed Copper Leads from terminals to the fittings. |
| 313 | a)Office Ground Floor |
| 314 | b)Office First floor |
| 315 | Supply and fixing of 9W LED lamp with battern holder for BH point. |
| 316 | a)Shops |
| 317 | b)Office Ground Floor |
| 318 | c)Office First floor |
| 319 | Supply and fixing of 1200mm (48\") A.C. ceiling fan High Speed (Higher End) complete with 100w 2 module fan step regulator with 300mm down rod on the existing fan clamp. |
| 320 | a)Shops |
| 321 | b)Office Ground Floor |
| 322 | c)Office First floor |
| 323 | Supply and fixing of 300mm 12\" sweep (light duty) AC exhaust fan with louvers / shutterscomplete with necessary wall opening and making good of the wall. |
| 324 | Supply and fixing of 1x48w LED street light fitting with inbuilt surge arrester (Higher End make) complete with 16\" 0\" heightGI pipe (Class \"B\") complete with PVC unsheathed Copper Leads MS clamps and aluminium painting. (Higher End) with all wiring etc,. Complete. |
| 325 | Supply and fixing of 3nos.6A Module 5 Pin Universal Socket with 3 nos. 6A module control switches concealed in metal flush type box with suitable cover plate in flush with wall with earth connection. (Higher End) (For computer plug socket). |
| 326 | a)Shops |
| 327 | b)Office Ground Floor |
| 328 | c)Office First floor |
| 329 | Supply and fixing of 1 No.16A Modular 5 Pin universal socket with 16A module flush type switch concealed in 1 No.3 module metal flush type box with suitable cover plate in flush with wall with earth connection. |
| 330 | a)Shops |
| 331 | b)Office Ground Floor |
| 332 | c)Office First floor |
| 333 | Supply and fixing of 2 Nos. 6A two module socket, 1 No. 6/16 A two module socket, 2 nos. 6A one module switch, 2 nos. 16A one module switch with module cover plate (plastic) on suitable module concealed box (GI) in flush with wall with earth connection. Higher End. |
| 334 | a)Shops |
| 335 | b)Office Ground Floor |
| 336 | c)Office First floor |
| 337 | Supply and fixingofEB Metering Pannel to accommodate6 nos of3 PhEnergy meter with5 nos. of 25A ELCB / RCBO , 1 no of 40A ELCB / RCBO ,and Laying 4 X 25 sq mm cu ar cable from EB posttp Metering Pannel for getting power connection, and Provision for earth pits as per specification etc,.complete. |
| 338 | Supplying and fixing 3 ph. DB with 25 A rotary switch with9 nos 6Asingle pole MCB and 3 nos. 10Asingle pole MCB |
| 339 | Supplying and fixing 3 ph. DB with 40A rotary switch with9 nos. 6A SinglepoleMCB and 3 nos. 20Asingle pole MCB for Power load. |
| 340 | Supply and run of 2 of 4 sq.mm (56/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire and making good of the concealed portion with suitable colour. |
| 341 | Supply and run of 4 core 1.0 sq.mm cu. ar cablefor street light |
| 342 | Supplyind and Laying 2.5 Sqmm cu.wire for power point circuit with I sq.mm cu. Earth wire for load like AC, UPS and PloterWith colour coding etc,. Complete.. |
| 343 | COMPOUND WALL |
| 344 | Excavation in all types of soil including dense soil, disintegrated/weathered/softrock(Poclainable)for Footingsofcolumns,Retainingwalls,etc.,bymechanical means to all depth including manual excavation for leveling, dressingtheedges,withallleadsandliftsincludingback fillinginlayersof150mmwithwateringandcompaction. dewateringofbothgroundandsurfacewater,removalof slurry generated while excavation and keeping the area free of water with necessary shoring, struting, required for keeping earth in position etc,Rate to include disposing the excess earth and spreading in layers to the required levels withinthesitewhereverspecifiedbythelocalauthorities. OnlyplanareaofthebasePCCwillbeconsideredfor measurement |
| 345 | Providingandlayingplaincementconcrete1:4:8 using coarsegradedaggregateof40mmanddownsizefor levellingcourse undercolumns,wallbasesandplinth beam etc. including necessary form work wherever necessary and compacted by wooden or cast iron rammers as per Specification and as directed |
| 346 | Providing, batching, mixing,transporting through transit mixers, pumpingandlayingcontrolledReinforcedCement Concrete of specified grade at all levels and heights specified below using ordinary Portland cement of grade 53/grade43fromapprovedmanufacturer,riversand,20mm and down size coarse aggregates, necessary Mineral admixturesapprovedbyConsultants(elkemandConplast SP 430SRV from Fosroc or equivalent), includingall leads and lifts, pumping using line pump or boom placer, vibrating/ compaction, scaffolding wherever necessary, curing as directed, excluding cost of shuttering and reinforcement works. |
| 347 | (DesignmixshallbeasapprovedbytheStructural Consultant / Employer\"s representatives |
| 348 | M 20 Concrete |
| 349 | a)Footing forPillatrs |
| 350 | b)Tie beams |
| 351 | c)) Columns |
| 352 | Providing,fabricatinganderectingformworkatalllevels and places wherever needed/specified as per drawing includingstriking with12mm Plasticcoated,marine resistantwaterproofply/SmoothfinishedMSplates with adjustablesteelpropsofacceptableStagingsystemand withsufficientbracingasapprovedbyconsultant.Costto includedesigningofproperform workandstagingsystem tosuittherequirements,Submissionofdesigncalculations and shop drawings for approval,sealing the joints with heavydutybrownselfadhesivetape,aligningtolineand levelsincludingM.S.Ties,PVCSpacer,Providing openings/ cutouts/ pockets, applying deshuttering chemical, Deshutteringas approvedby the consultantetc., complete atalllevels,double/trippleheightsandprofilesforNote: Only planareashallbeconsidered.Noextra shallbepaid for Side shuttering of Drop panel/column capitals. |
| 353 | 1)plywoodshutteringshallbeconsideredforallvertical elements,beam soffit,corewalls,stairs,ramps,tanks,RCCpedestals Etc.,2)M.S.platesshall beconsideredforfoundation,slabs only.3) Shuttering & deshuttering sequence shall be 100% ,80% & 40%from the slab to be cast respectively |
| 354 | a)Footing forPillatrs |
| 355 | b))Tie beams |
| 356 | Providingandconstructingcementconcretesolidblock masonry workat all levelsin cementmortar 1:3usingM -5.5Grade blocks of size 400 x 200 mm x 200 mm of solid cement concrete blocks, .conforming to IS 2185 or equivalentBSincludingallscaffolding,staging,curing,all lifts etc. complete and as directed.Concrete blocks manufacturedunderstrictqualitycontrolconditionsusing modernruggedblockcastingandstrippingmachinewith the latest mouldingtechniques etc. only shall be used. |
| 357 | Providing and fixing reinforcement for RCC work with Thermomechanicallytreated (TMT)barofvarious diameters and grade of steel as specified below conforming toISorequivalentBSspecificationincludingcuttingand waste, bending, hoisting, fabricating and placing in position accordingtodrawingsandbindingthereinforcementwith galvanised annealed bindingwireofdoublefoldof18 gauge andprovidingPVC coverblocksforplacingthe reinforcementsinpositionandformaintainingthecover specifiedand/or according to relevant IS or equivalent BS code. |
| 358 | Note : Unless noted otherwise the measurements in accordance with IS 1200 or equivalent BS. However reinforcement shall be measured only in lengths of bars as actuallyplacedinpositiononstandardweightbasis,no allowancebeingmadeintheweightforrollingmargin. Authorised laps and splices, Chairs of any shape & profile, Spacerbarofanyshape&profile,coverblock,wastage and binding wire will not be measured and shall be included inthequotedrates.Quotedrateshallbedeemedtohave consideredtheabovestipulation.Quotedratetoinclude lead, lift, placingat all levels and as directed. Detailing of the reinforcement shall be ductile detailing for seismic zone III as per codal requirement. |
| 359 | Gradeof reinforced steel - Fe 500 |
| 360 | Providing and fixingweldedM.S.grillsalongthe compoundwalltodetailsasper drawing withnecessary screws, bolts andfixed withnecessaryM.S. lugs embeddedinmasonrywithC.C.1:2:4andfinishingthe surfaceneatly.Rateshallincludefor twocoatsof first qualitysynthetic enamel paintovera coat ofzinc phospateprimer,necessarytools&plants,weldingand consumables, etc. complete, as directed. |
| 361 | ProvidingandfixingCompoundwallgateofthefollowing size and specifications as per the detailed drawing. |
| 362 | MSopenableswinggateconsistingofdoubleleafusing 50mm solid sections for outer frame and 16mm square bars for intermediate frames as stiffnner and 16mm square solid sections for vertical members at 75mm c/c as shown in the drawingincludingnecessary,lockingarrangements, holdfastandhingesfixedintothemasonryorR.C.works andprovidinggunmetalrollerfixedtothemainframeat bottomtofacilitateswingingofthegateandit shouldbe supported over the M.S.flat of size 50 x 10 mm thick firmly fixed to the ground etc.complete all as directed and applying two coats of enamel paint etc. complete. |
| 363 | Prepare the surfaceand apply 18mm thick smooth and even surface of cement plaster with cement mortar 1:5 (1 of cement : 5 of fine sand) on the Exterior Faces and passage of walls as directed by the department Engineers in their General Builders works specificaton)- including Scaffolding etc. |
| 364 | Providing and paintingthe exterior walls with two coats of apex Ultima over one coat of exterior primer, including cost of scaffolding, scrapping,grinding,and applying etc, complete. |
| 365 | Providing, Cleanning and Painting compound wall Grills and gate with 2 coats of enamel paint over one coat of primer |
| 366 | Supplyingandfixing 50mm dia. and 200mm or more longG.I.pipespouts including painting two coats of first quality syntheticenamel paintof approved make and tint over one coat of primer all as per specification and as directed for Gate. |
| 367 | Filling earth brought from outside between building and compound wallincluding compacting etc. complete |
| 368 | Supplying and laying of 63mm thickhigh strength type of interlocking Rubber moulded hydraulic pressed paver block of approved colour made up of designed concrete mix 1:1:2 using 10 to 12mm size HBG stone jelly in required shapes and sizes having minimum compressive strength of 40 N/mm² to be laid in flurrying bone pattern with approved non sticking surface at top. Compacting with power compactor and sweeping the sand grouting and also inclusive of transportation charges, loading, unloading and labour charges for laying the paver block, etc., complete and as directed by the departmental officers. i) Paver blocks are to be laid between compound wall and building leaving treewell open 2\" 0\" X 2\" 0\" for plantation on Periphery of compounwall.ii) Retaining wall to be constructed with solid block in cm 1:5 and finishing ,wherever required before laying paver block |
| 369 | Random rubble masonry in CM 1:6including flush pointing withCM1:3afterrakingoutjoints,curingetc.withall necessarybondstonestofullwidthofthewallinevery layersand staggered, allcomplete and as directed in foundation and basement |
| 370 | MISCELLANEOUS ITEMS |
| 371 | Charges for Getting Temporary EB connection of 5KW from TNEB and Paying the bill amount to TNEB ,until completion of project including EB Deposit |
| 372 | RAIN WATER HARVESTING |
| 373 | ConstructionofSubsoilwellwithPrecastRCCRingsof1200mmdiaclear dimensions as mentioned in the drawingwith RCC top cover slab and 600 x 900mm RCC pre-castcover,inlet arrangements including excavation, curing with all leads and lifts,disposing the surplus earth with a lead of 300m as directed by the site Engineer-in-charge etc.,complete. |
| 374 | APPROVAL CHARGESAppointing Architect, Structural Engineer, Supervisor for Construction works,including preparation of Architectural drawings and Detailed Structural drawing for execution of civilworks, preparation of drawings for submitting to DTCP / LPA for approval, Completing approval process and getting approval from Local body, Paying the fees like Development fees,license fees as per demend raised by LPA & Local body . Preparingbills, certifying for payment etc ,.complete. |
| 375 | ADMINISTRATIVE EXPENCE .Publication Expence |
| 376 | Cost for unforeseen items / Missed items which is required to complete the works in good manner. |