| 1 | Earth work in excavation of foundation trenches in hard soil within initial lead and lift including dressing and leveling the bed upto the required depth and depositing the excavated materials away from the working area etc.complete as per the specification and direction of the Engineer-in-charge. |
| 2 | Supplying, filling in foundation and plinth with sand including watering andramming with cost, conveyance, royality andtaxes of all materials and cost of labour with T&P required for the work etc. complete (Measurement will be taken on finished section only)as per the specification and direction of the Engineer-in-charge. |
| 3 | Cement concrete (1:3:6) in foundation and plinth using 4cm size black hard crusher broken granite stone metals of approved quality from approved quarry including lowering, laying, concrete watering and curing etc. complete inlcuding cost, conveyance, royality and taxes of all materials and cost of all labour with T & P required for the work complete as per the specification and direction of the Engineer-in-charge. |
| 4 | Fly ash Brick masonry usingbricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix (1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge. In Foundation and Plinth |
| 5 | Super Structure |
| 6 | 12mm thick cement plaster in cement mortar (1:6) finished smooth to outside surface of brick walls after racking out joints including watering and curing with cost, conveyance, royaltyand taxes of all materials with cost of all labour, T&P etc. required for the work complete asper the specification and direction of the Engineer-in-charge. |
| 7 | 16mm thick cement plaster in cement mortar (1:6) finished smooth to inside surface of brick walls after racking out joints including watering and curing with cost, conveyance, royaltyand taxes of all materials with cost of all labour, T&P etc. required for the work complete asper the specification and direction of the Engineer-in-charge. G.Floor |
| 8 | Painting 2(Two)coats with any approved water proofing cement paint with brush to outside wall surface after cleaning surface including cost of paint watering and curing cost conveyance and taxes of all materials and labour, cesswith T&P required for the work etc .complete in all floors as per direction of Engineer in Charge. |
| 9 | Providing 2.5 cm grading concrete (1:2:2) over roof slab using HGCB chips of approved quality from approved quarry including hoisting, lowering & compacting concrete watering curing, cost & conveyance of all materials taxes & royalties labour, cess T&P required for the work etc complete as per specification & direction the EIC |
| 10 | Dismentallingdoors, windows, frames & ventilator includingremoval of frames, hinges & stacking useful materials the same for re-use etc complete. as per direction of EIC |
| 11 | Providing and supplyingfor fitting & fixing of M.S.Grills to Windows, M.S.Door,M.S.Windows and openings made out of approved size angle frame and sqare bar of approved design etc complete in all respect as per the Engineer in Charge. |
| 12 | Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer over new Iron work including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. |
| 13 | Finishing wall surface with Acrylic wall putty (water based) of approved make and finish smooth and even surface to receive painting including cost of all materials labour T&P etc complete.as per the direction of the Engineer-in-charge. |
| 14 | Supplying, fitting & fixing of Vetrified floor tiles of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm coloredprinted series on 12 mm thick cement plaster of cement mortor 1:1 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete as per the direction of the Engineer-in-charge. |
| 15 | Supplying, fitting & fixing of Ceramic tilesin dadoos of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm coloredprinted series on 12 mm thick cement plaster of cement mortor 1:3 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete as per the direction of the Engineer-in-charge. |
| 16 | Painting two coats with plastic emulsion paint over a coat ofprimer to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour, T&P etc. complete as per the direction of the Engineer-in-charge. |
| 17 | Finishing wall surface with two coats of approved quality of weather seal coatof approved shade over a coat of primer including cost of all materials etc.complete. as per direction of Engineer In Charge. |
| 18 | Providing fitting fixing of interactive pannel cabinet (Size) 16 f t x6\"6\"\" ft x 1\"6\"\" ft with fixing of 12mm BWR ply in back side & 19mm BWR ply with Cup board with 19 mm Rack partiton Ply prefereably .The top member will be Siding with Two types (green board & white board) (4ft x 4\"3\"\") 19mm Ply board laminated with sunmica,assembled with slider including cost of all materials, all lbour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge. |
| 19 | Providing fitting, fixing of Science lab table Size 8 ft x4 ft x 3 ft with topgranite with MSsquare bar including cost of all materials, all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge. |
| 20 | Providing fitting, fixing up interactive pannel cabinet with 19mm thick BWR ply wood including cost of all materials, all lebour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge. |