| 1 | 1. Construction of Threashing floor near OHT at Chinnamottanuthu H/O ThalaiyuthuEstimate Amount Rs.9.10 Lakhs |
| 2 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 3 | Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 4 | Supplying and erecting centering for sides & soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cm x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over country wood poists of size 10cm x 6.5cm dia spaced at about 90cm center to center etc., complete |
| 5 | Cement Concrete 1:3:6 (One Cement, Three sand and six hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for basementincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 6 | Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4\" x 4-1/4\" x 2-1/4\"for foundation and basement including curing, etc., complete complying with standard specifiction. |
| 7 | Reilling the excavated earth other than sand including cost,conveyance and filling charges etc.,as per standard specifications |
| 8 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 9 | Cement Concrete 1:2:4 (One Cement, Two sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for basementincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 10 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 11 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 12 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification |
| 13 | Resting shed roof |
| 14 | Rafter - 25 mm x 25 mm M.S. Square Tubular Hollow pipe of 2.60 mm thick |
| 15 | Supply and fixing of Bitumen pad including cost and conveyance and all labour charges etc.complete |
| 16 | Provision for Name Board |
| 17 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |