Name of Work: RE-CARPETING OF POP GROUND AT STC BSF KHARKAN CAMP.
Sl. No.
Item Description
1
Providing and applying tack coat using bitumen emulsion conformingto IS:8887, using emulsion pressure distributer including preparingthe surface & cleaning with mechanical broom.With medium setting bitumen emulsion On W.B.M / W.M.M. @ 0.4kg/sqm
2
Providing and applying tack coat using bitumen emulsion conformingto IS:8887, using emulsion pressure distributer including preparingthe surface & cleaning with mechanical broom. With medium setting bitumen emulsion On bituminous surface @ 0.25kg/sqm
3
Providing and laying Bituminous concrete using crushed stoneaggregates of specified grading, premixed with bituminous binderand filler, transporting the hot mix to work site by tippers, laying withpaver finisher equiped with electronic sensor to the required grade,level and alignment and rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction and density as perspecification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of gradeVG-30 @ 5.5% (percentage by weight of total mix) andlime filler @ 3% (percentage by weight of Aggregate)prepared in Batch Type Hot Mix Plant of 100-120 TPHcapacity.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.