Mumbai Port Trust-MbPT has published Tender For Maintenance Dredging In Approach Channels, Turning Circles, Outside Berths, Indira Dock Basin, Bunder Areas And Anchorages Of Mumbai Port For Three Years From The Year 2023 2024. Submission Date for this Tender is 09-10-2023. Dredging Work Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Aug-2023 | C1 T472023 Pre Bid meeting Video conference | Other | 07-09-2023 |
2 | 06-Sep-2023 | T472023 C2 Due Date Extension | Date | 25-09-2023 |
3 | 18-Sep-2023 | C3 T472023 Due Date Extension | Date | 09-10-2023 |
4 | 27-Sep-2023 | Pre Bid Replies T472023 Part II | Other | 09-10-2023 |
5 | 27-Sep-2023 | Pre Bid Replies T472023 | Other | 09-10-2023 |
Sl. No. | Item Description |
1 | PART I - "A" Providing dredging, dumping and survey plant and equipment for “soil” dredging in the areas given below for three years i.e. during 2023-2024, 2024-2025, 2025-2026. Dredging all “soil” to depths and side slopes indicated in drawings and specifications and dispose off the dredged soil in the assigned dumping areas including all leads and lifts to lines and levels, pre, intermediate, post dredge surveys, all as specified and as directed by the Engineer in the following areas. Removing dredging, dumping & survey plants and equipments provided to carry out the work. Note: Mobilisation, predredging survey, dredging, transportation of dredged spoil to designated dumping ground, dumping, post dredge survey and handing over full area each year will be one occasion, subject to theclause mentioned in the tender for dredging at BPX and BPS. |
2 | Indira Dock Approach Channel |
3 | Indira Dock Entrance Channel |
4 | BPX, BPS and East Mole 60% of quoted rate will be paid after completion of the 1stoperationof dredging in each cycle. |
5 | Indira Dock Harbour Wall Channel and Berths 18 to 22 |
6 | Tug Berth and Launch Berth |
7 | Prince"s and Victoria Dock Channel |
8 | Ferry Wharf Berths, Approaches and Ferry Terminal Jetty |
9 | Dredger Berth, Barge Berth 1 and Approaches |
10 | New Pir Pau Channel andBerth |
11 | Channel opposite Jawahar Dweep, Emergency Anchorage and Berths. |
12 | Apollo Bunder (Gateway of India steps) |
13 | OCT Berths & Channel |
14 | Deep Water Anchorage at J3 |
15 | Providing dredging, dumping and survey plant and equipment for “soil” dredging in the following areas of Mumbai Port. Dredging all “soil” to depths as indicated in drawings and specifications and dispose off the dredged soil in the assigned dumping area including all leads and lifts to lines and levels, pre, intermediate, post dredge surveys, all as specified and as directed by the Engineer. Removing dredging, dumping & survey plants and equipments provided to carry out the work. |
16 | Second Chemical Berth (SCB) & channel |
17 | Deep Water Anchorages ( DA1 to DA3) |
18 | JD5 Berth & TC |
19 | Indira Dock Basin |
20 | Bunder Areas( Haji, Hay & Coal Bunder) |
21 | Third Chemical Berth and Turning Circle |
22 | JD4 berth |
23 | Fish Jetty at Malet Bandar |
24 | Sassoon Dock |
25 | Landing steps at Jawahar Dweep Island |
26 | TOTAL PART II ( in Words) |