|
| 1 | Scope of Work-PART-A:Construction of 11KV 70 sqmm AAAC XLPE covered conductor-0.05 Km-11KV Cut point with 90 Degree AngleSupply, Installation, testing & commissioning of :-Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no\"s channel required =( 4x9.56x1.2) |
| 2 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no\"s required = (16x2.36x0.280) |
| 3 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no\"s channel required =(4x9.56x0.306) |
| 4 | 11 KV pin insulator polymer |
| 5 | H W fitting(B&S) 70KN, 3Bolt |
| 6 | Disc insulator (B&S) 70 KN polymer |
| 7 | Non metalic Ties 11KV (For covered conductor) |
| 8 | IPC for 70 sq.mm AAA conductor (For covered conductor) |
| 9 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no\"s qty. required ( 1 Pair) |
| 10 | H.T. Stay set (Complete ) |
| 11 | H.T. Stay Insulator Type-C |
| 12 | 7/10 SWG Stay Wire 15kg /stay |
| 13 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 14 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 15 | 11KV Pin Points With WPBWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 16 | 11 KVV cross Arm (10.2 K.g. each ) |
| 17 | Top bracket 100x50X6 mm GI channel (2kg each) |
| 18 | Danger Plate, 1 no\"s. for each pole |
| 19 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no\"s = (1x0.59x0.510) |
| 20 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 21 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no\"s = (4x0.59x0.510) |
| 22 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 23 | Non metalic Ties 11KV (For covered conductor) |
| 24 | Earthing of Support ( Coil Type ) |
| 25 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 26 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 27 | 70 SQ MM AAAC XLPE Covered Conductor |
| 28 | Black Paint |
| 29 | Yellow Colour Paint for Background |
| 30 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 31 | Couping ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr |
| 32 | Scope of Work-PART-B:-Installation of 1no. 100KVA 11/0.4KV WPB (GI) Pole mounted S/sWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 33 | Top Channel GI 100 X 50 X 6 MM(3000 mm long) (9.56Kg./Mtr, 2 No\"s.) (Each 2x3.000x9.56= 57.36 Kg) |
| 34 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no\"s required = (6x2.36x0.280) |
| 35 | AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No\"s.) (Each 2x3.000x7.14= 42.84 Kg) |
| 36 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no\"s channel required =( 9.56x2x0.35) |
| 37 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no\"s channel required =( 7.14x0.8x1) |
| 38 | HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No\"s.) (Each 2x3.000x7.14= 42.84 Kg) |
| 39 | Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No\"s.) (7.14Kg./Mtr., 2 No\"s.) (Each 2x0.810x7.14= 11.57 Kg) |
| 40 | Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No\"s.) (Each 2x1.282x4.5= 11.54Kg) |
| 41 | Transformer Base GI Channel 100 X 50 X 6 MM(3000 mm long) (9.56Kg./Mtr, 2 No\"s.) (Each 2x3.000x9.56= 57.36 Kg) |
| 42 | Transformer Base Support GI Channel100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No\"s) (Each 2x0.515x9.56= 9.85Kg) |
| 43 | Transformer Belting Angle 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No\"s) (Each 2x3.0x4.5 Kg) |
| 44 | Transformer Belting Support Angle 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No\"s) (Each 2x0.580x4.5= Kg) |
| 45 | LTDB Mounting Angle 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No\"s) (Each 2x1x4.5 Kg) |
| 46 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 47 | 100 KVA, 11/0.4 KV (AL) Transformer BIS Energy Level-II |
| 48 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 49 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 50 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. |
| 51 | AB Switch(11KV,200A.3pole,50Hz) |
| 52 | H.G.Fuse( 11KV.200A.3Pole) |
| 53 | PG Clamp for 55 sq.mm AAA conductor |
| 54 | Disc insulator (B&S)70 KN polymer |
| 55 | H W fitting (B&S)70KN(3bolted) |
| 56 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 57 | 11KV pin insulator polymer |
| 58 | HT stay set complete |
| 59 | HT stay Clamp (1.9Kg/pair) |
| 60 | HT stay insulator TYPE-C |
| 61 | 7/10 SWG GI stay wire, Grade -2(15Kg./ Set) |
| 62 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 63 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 64 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 65 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no\"s = (8x0.59x0.510) |
| 66 | Danger plate 11kv |
| 67 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no\"s = (2x0.59x0.510) |
| 68 | Name plate |
| 69 | Structure Numbering and MarkingYellow Colour Paint for Background |
| 70 | Black Colour Paint for numbering |
| 71 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr |
| 72 | Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr |
| 73 | Fixing of stay set with 0.5Cumcement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 74 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 75 | Laying of 4C x 150 mm2 LT XLPE Cable |
| 76 | Supply and Erection of GI Fencing with Gate |