Integrated Tribal Development Agency-ITDA has published Tender For Repair Of 300 Seated St Boys Hostel At Patrapada Ashram School Under Thakurmunda Block With Repair Of Flooring , Doors , Widows Toilet With Colour Washing And Railing. Submission Date for this Tender is 21-08-2023. Building Work Tenders in Mayurbhanj Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm Data for 9.30 sqm |
2 | Removing old cement plaster from walls including racking out joints 12mm deep and removing the debries in 50m lead..(data for 9.30sqm) |
3 | Dismentalling and removing the doors, windows, ventilater including removed of frame hinges, plastering and stackingthe same for reuse and removing the debries in 50m lead.(Data for 2.60 sqmt) |
4 | Dismantling and removing old tiled flooring including removing the base coarse andtacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm Data for 9.30 sqm |
5 | Dismantling and removing old tiled cladding from walls including racking out joints 12mm deep stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm Data for 9.30 sqm |
6 | Dismentalling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris with in 50m lead |
7 | 16mm thick C.P in cm (1:6) over Brick workwith all cost, carriage,Royality etc. complete. |
8 | 06mm thick C.P. in cm (1:4) over RCC works to make surface smoot with all cost , carriage , Royality etc, complete -Ground Floor |
9 | Supplying , fitting and fixing in position steel cutting edge as per approved design using GI anglesm bolts, and nuts complete incluidng cutting angels to required size bending to shape, drilling holes and reverting and welding etc. complete in all respect as per the direction of Engineer in Charges. -Ground Floor |
10 | Labour for fitting and fixing of GI Gate as per approveddrawingincluidng cost of all materials etc. complete Proprtionl rate. |
11 | Painting two coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood andiron work including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge. |
12 | Distemering2 coats with distempers with two coat of primerof approved quality including all cost with all taxes ., complete in all respect in all floors as per the direction of Engineer in charge |
13 | Wall painting 2 coats with weather coats of approved quality including all cost with all taxes ., complete in all respect in all floors as per the direction of Engineer in charge.-(ELMS) Palint |
14 | Fixing vetrified tiles in dados ( 600mmx600mm) skirting and in rises of steps on 12mm thick bed of cementplaster (1:3) joined with near cement slurry mixed with pigment to match the shade of the tiles includign rubbing and polisign incluidng cost of tiles |
15 | Fixing Ceramic tiles in Floors,treads and Landing on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tiles. |
16 | Fixing Ceramic tiles in dados,skirting and in rises of step on 25mm thick bed of cement mortar (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tiles. |
17 | Removing old cement plaster from walls including racking out joints 12mm deep and removing the debries in 50m lead..(data for 9.30sqm)-First Floor |
18 | Dismentalling and removing the doors, windows, ventilater including removed of frame hinges, plastering and stackingthe same for reuse and removing the debries in 50m lead.(Data for 2.60 sqmt) |
19 | Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead per 1 sqm Data for 9.30 sqm-First Floro |
20 | Supplying , fitting and fixing in position steel cutting edge as per approved design using GI anglesm bolts, and nuts complete incluidng cutting angels to required size bending to shape, drilling holes and reverting and welding etc. complete in all respect as per the direction of Engineer in Charges. -First Floor |
21 | Labour for fitting and fixing of GI Gate as per approveddrawingincluidng cost of all materials etc. complete Proprtionl rate. -First Floor |
22 | 16mm thick C.P in cm (1:6) over Brick workwith all cost, carriage,Royality etc. complete.-First Floor |
23 | Painting two coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood andiron work including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paints and primer complete in all respect as per the direction of Engineer in Charge.-First Floor |
24 | Distemering2 coats with distempers with two coat of primerof approved quality including all cost with all taxes ., complete in all respect in all floors as per the direction of Engineer in charge-First Floor |
25 | Wall painting 2 coats with weather coats of approved quality including all cost with all taxes ., complete in all respect in all floors as per the direction of Engineer in charge.-(ELMS) Palint -First Floor |
26 | Fixing vetrified tiles in dados ( 600mmx600mm) skirting and in rises of steps on 12mm thick bed of cementplaster (1:3) joined with near cement slurry mixed with pigment to match the shade of the tiles includign rubbing and polisign incluidng cost of tiles -First Floor |
27 | Fixing Ceramic tiles in dados,skirting and in rises of step on 25mm thick bed of cement mortar (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tiles.-First Floor |
28 | Construction of Display Board at site of proper specification as fixed by Department as per the direction of the Engineer-in-Charge. |