Name of Work: Closing leakage arrangements in Arulmighu Thanumalaya Swamy Temple at Suchindrum of Kanniyakumari District
Sl. No.
Item Description
1
Dismantling the old machine pressed tiles, removing the debris to outside the temple premisses ,including cost and conveyance of all labour charges etc complete.as directed by the department officer etc.
2
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
3
Finishing the top of roof with one course of machine pressed tiles of size 200mm x 200mm x 20mm of approved quality set in Lime Mortar 1:1.5,12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same lime mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
4
Plastering with Lime Mortar 1:1.5 , 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
5
Plastering with Lime Mortar 1:1.5 , 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
6
Painting old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paintin all floors etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Departmental officers before use on works.)
7
Pointing in Lime mortar 1:1.5 mixin all floorsincluding cost and conveyance of all materials and all labour charges including curing etc. complete complying with standard specification and as directed by the departmental officer.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.