Bridge And Roof Company I Limited has published Tender For Construction Of Hospital Block Including Supply And Installation Of Mgps And Mot, Lmo, Psa Furniture And Other Allied Works (Dmer). Submission Date for this Tender is 24-08-2023. Building Work Tenders in panchkula Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Aug-2023 | CORRIGENDUM-II | Date | 24-08-2023 |
Sl. No. | Item Description |
1 | HOSPITAL PROJECT AT GMC YAMUNA NAGAR, HARYANA ( Pkg-01 ) |
2 | Engineering, Procurement, and Construction ofHospital Building(RCC framed structure) (Basement+G+7)i/c architectural planning, structural design with recommended type foundation as per existing soil strata & ground water table at site and structure/retaining walls designed to take load of Superstructure complete including Furnishing, Architectural Features e.g. Cladding, Façades, Structural Glazing, Projections,etc. all complete and planning & designing of all E&M services i/cMOT(SMS), MGPS, Integration, kitchen, Laundry, CSSD, LMO&PSA , Furnitureetc. as per provisions contained in tender document and building the same and handover to Owner after successfully commissioning of all Civil and E&M services as per scope of work, Technical Specification stipulated in Tender all complete as per directions of Engineer- In-Charge. ON EPC CONTRACT BASIS.(Note: Plinth Area of following structures are to be considered for payment purpose) |
3 | Plinth Area of Basement |
4 | Plinth Area of All floors except basement |
5 | Engineering, Procurement, and Construction with Development of E&M facilities of the project required as per scope of work i/c Architectural planning , designing of services alongwith all civil workas per stipulated specifications and tender document all complete as per direction of Engineer-in-charge, which includes [ ON EPC CONTRACT BASIS.] : (a) SITC of Electric Sub-Stations-1, HVAC Plant Room, DG Yard, HSD Yard and its piping, Electrical HT / LT cabling from switchyard to substation blocks , and from sub-stations toindividual buildingsincluding HT ring main system (b) SITC of DG Sets complete with all accessories. (c) SITC of Transformers complete with all accessories. (d)SITC of Coolling Towers, Chillers complete with all accessories. (e) SITC of HT Panels, LT Panels, Capacitor Panels and Sandwich Bus Ducts complete in all respect, HT & LT Cabling work, HSD Storage Tank, Pumps & Pipeline network, SCADA & BMS complete in all respects as per scope of work and direction of Engineer- In-Charge." Note: Civil cost of ESS-1/ HVAC Plant Room/DG Yard/HSD Yard shall be included in the quotedrate and the corresponding plinth area / open platform area shall not be paidseperately |
6 | The Following Development ofpremises, Infrastructure civil facilities of the project required as per scope of work i/c architectural planning , designing of services as per stipulated specifications and drawings attached complete as per direction of Engineer-in-charge, which includes: ON EPC CONTRACT BASIS. |
7 | LEVELLING, INTERNAL ROADS, PATHS & COVERED WALKWAY PARKING ETC. as per drawing (area marked under Package-1), battery limit & scope of work as mentioned in the tender document: (a) Levelling(b) Internal Reinforced cement concrete road with vaccum dewatered concrete(c) Footpath with kerb stone , (d) Parking (d) Covered walkway (e) f) Grass paver along the periphery of the individual buildings upto the adjoining road/footpathas per scope of work, drawing,Tender Documentall complete as per directions of Engineer- In-Charge |
8 | SEWERAGE SYSTEM ETC as per drawing, battery limit & scope of work as mentioned in the tender document :. (a) Civil and E&M work of UGT-1 & Pump House, STP-1, ETP-1 alongwith all equipment and accessories complete in all respect etc. (b) Filter Water Supply from the UGT-1toindividual buildings, from STP-1/ETP-1 to UGT-1, from UGT-1 to HVAC plant room (c) Distribution lines of required diameter pipes, (d) Peripheral grid of required diameter pipes (e) Unfiltered water supply distribution lines from individual building to the STP-1/ETP-1, (f) Storm water drain for the individual building & along the road, as applicable, (g) Rain Water Harvesting (RWH), (i) Trenchs for services, (j) Underground Sump etc k) Make up water line from UGT-1 to STP-1 l) Tubewell boring & WTP m) Main water supply line fromBorewell & source of Supply to UGT-2 |
9 | HORTICULTURE WORKS : (a) Horticulture Operations includingearth filling , grassing, tree plantations/shrubs and potted plants including tree guard etc. , (b) Existing Tree cutting, replantation, relocation if required and maintenance of the same till DLP |
10 | EXTERNAL FIRE FIGHTING WORKS : External Fire fighting works for the hospital buildingincluding supply and installation of fire hydrant system, fire pumps etccomplete in all respect, Fire Pumps in the Pump Room/UGT-1 and Piping work from the Pump room/UGT-1 to the individual buildings under scope. |
11 | STREET LIGHTING WITH LED, EMERGENCY LIGHT, SOLAR LIGHT & ILLUMINATED SIGNAGES, DIRECTIONAL SIGNAGESETC. along the road as per drawing, battery limit & scope of work as mentioned in the tender document : (a) Supplying, installation, testing and commissioning of LED Street / Solar/ Compound /High mast / Pathway / Landscape Lighting , (b) Illuminated signages forexternal area as applicable, Directional SignagesC) CCTV Camera & LV works etc as per requirement |
12 | "NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST." |