|
| 1 | Refilling of ABC stored pressure type fire extinguisher capacity 6 kg filled with ISI marked powder complete in all respect |
| 2 | Refilling of water Co2 type fire extinguisher capacity 9 Ltr. complete in all respect |
| 3 | Refilling of Co2 type fire extinguisher capacity 4.5 kg complete in all respect |
| 4 | Refilling of Co2 type fire extinguisher capacity 9 kg complete in all respect |
| 5 | Refilling of DCP type fire extinguisher capacity 5 Ltr. Per kg filled with ISI marked powder complete in all respect |
| 6 | Refilling of DCP type fire extinguisher capacity 10 kg filled with ISI marked powder complete in all respect |
| 7 | Refilling of DCP type fire extinguisher capacity 25 kg filled with ISI marked powder complete in all respect |
| 8 | Valve and gauge for ABC type fire extinguisher |
| 9 | Discharge pipe for water Co2 type fire extinguisher |
| 10 | Discharge pipe with hose for Co2 type fire extinguisher capacity 4.5 & 9 kg |
| 11 | Discharge pipe for DCP type fire extinguisher capacity 25 kg |
| 12 | Discharge pipe for DCP type fire extinguisher capacity 5 kg |
| 13 | Discharge pipe with gun for DCP type fire extinguisher capacity 10 kg |
| 14 | Repairing of firefighting jockey pump motor with dismantling of the pump from 4th floor transporting to the workshop, complete rewinding of 20 HP ABB make motor and re-installation at site complete in all respect upto entire satisfaction of Engineer-in-Charge. |
| 15 | Replacement of the bearing of the 20 HP ABB make pump motor complete with dismantling from site, transportation to the workshop and re-installation at site complete in all respect upto entire satisfaction of the Engineer-in-Charge. |
| 16 | Dismantling of the Kirloskar make pump on site replacement of the mechanical seal, 02 No. bearings, grinding of the shaft upto standard operating parameter, servicing of the impellor, repairing of the coupling of the motor and shaft with complete re-installation upto its complete operating parameters and proper alignment of the pump with dial gauge complete in all respect upto entire satisfaction of Engineer-in-Charge. |
| 17 | Replacement of the pressure switch to maintain the pressure in the water line with complete sensor cable, its connections to the relay in starter complete in all respect. Make: - Danfoss |
| 18 | Replacement of the spring loaded screwed safety relief valve brass type complete in all respect upto entire satisfaction of Engineer-in-Charge. |
| 19 | Supplying erection, testing of fully automatic electric control panel board for T/Wells in Pump Chamber consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fully automatic air brake starter suitable for Motor of the following capacity, Min switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp. Meter of 0 to 100 Amp. 3 sets of indicating lamp capacitor of suitable capacity and 1 no. single phase preventers with the timer switch including wiring in panel board and suitable electric energy meter wiring in Electric Control Panel Board. Complete in all respect as per specification given in Schedule No. II, Including MCB, suitable, Capacitor, Wooden Box etc. as per site requirement complete in all respect. Make:- L&T, SIEMENS, BCH, SCHNEIDER. 20 HP Motor (Rates to be quoted deducting the amount of the MS Box/case in which electrical equipments are to be fitted) |