| 1 | Earth work in excavation of foundation trench in all kinds of soil including levelling the bed & deposting the excavated soil within intial lead and lift etc complete and as per direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with coarse river sand including watering and ramming etc. complete and as per direction of the Engineer-in-charge. |
| 3 | Providing cement concrete (1:3:6) mix with 40mm nominal size H.B stone aggregate in foundations including cost and conveyance of all materials to site and all labour charges complete or as per direction of E.I.C. |
| 4 | Fly Ash brick work with25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar(1:6) in foundation and plinth per cum and as per direction of the Engineer-in-charge.(In foundation) |
| 5 | Fly Ash brick work with25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar(1:6) in foundation and plinth per cum.(In superstructure) and as per direction of the Engineer-in-charge.(a) Ground floor |
| 6 | (b)First floor |
| 7 | R.C.C. M20 using 12 mm size H.G. chips including hoisting, lowering & laying & compacting, watering & curing including centering & shuttering with cost of all materials & labour required for the work etc. complete but excluding cost of M.S. rods etc. completes as per direction of the Enginneer-in- charge. Ground floor(a)Column Base/ Footing |
| 8 | (b)Column |
| 9 | (c)Plinth beam |
| 10 | (d)Lintel band |
| 11 | (e)Chajja |
| 12 | (f)Roof beam |
| 13 | (g)Roof slab |
| 14 | (h)Stair case |
| 15 | First floor(a)Column |
| 16 | (b)Lintel band |
| 17 | (c)Chajja |
| 18 | (d)Roof beam |
| 19 | (e)Roof slab |
| 20 | Supplying cutting, bending, Straightening, placing & binding of TMT Bars reinforcement complete as per Drawing and technical specification and as per direction of the Engineer-in-charge.(a)Ground floor |
| 21 | (b)first floor |
| 22 | 20mm thick CP in CM (1:4) grading plaster over roof slab with cost of all materials and labour etc complete and as per direction of the Engineer-in-charge.(a)First floor |
| 23 | Providing 16mm thick cement plaster with cement mortar (1:6) including cost, conveyance, royality and taxes of all materials, labour T&P etc. complete including watering, curing for required period as per specification and direction of the Engineer-in-charge. (a) Ground floor |
| 24 | (b)first floor |
| 25 | Providing 12mm thick cement plaster with cement mortar (1:6) including cost. Conveyance, royality and taxes of all materials, labour T&P etc. complete including watering , curing for required period as per specification and as per direction of the Engineer-in-charge.(a)Ground floor |
| 26 | (b)first floor |
| 27 | Providing 6mm thick cement plaster with cement mortar (1:4) including cost. Conveyance, royality and taxes of all materials, labour T&P etc. complete including watering , curing for required period as per specification and as per direction of the Engineer-in-charge.(a)Ground floor |
| 28 | Supplying, fitting & fixing with Ceramic wall tiles of size 300/200mm x 200mm on 12 mm thick C.P. (1:3) (1cement : 3sand) jointed with neat cement Slurry mixed with pigments to match the shade of the tiles including rubbing, polishing and all cost & taxes of materials, labour,& curing etc. complete and as per direction of the Engineer-in-charge. |
| 29 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge |
| 30 | Supplying, fitting ,fixing Chequered tiles in floors of following size of approved make conforming to IS : 13755and as per direction of the Engineer-in-charge. |
| 31 | Priming one coat two wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete and as per direction of the Engineer-in-charge.(a) Ground floor |
| 32 | (b)first floor |
| 33 | Finishing surface of walls with Acrylic putty (water based) of approved make & finished smooth & even surface to receive painting incluidng cost of materials taxes labour etc . and as per direction of the Engineer-in-charge.(a)Ground floor |
| 34 | (b)first floor |
| 35 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade inculding cost of distemper and as per direction of the Engineer-in-charge.(a)Ground floor |
| 36 | (b)first floor |
| 37 | Finishing walls with water proofing Weather coat of approved shade on new work two coat to give an even shade including cost of paint and as per direction of the Engineer-in-charge.(a)Ground floor |
| 38 | (b)first floor |
| 39 | Painting two coats with good enamel paint over a coat of primer / red oxide on iron worksincluding cost, conveyance & taxes of all materials, T&P, labour charges etc complete and as per direction of the Engineer-in-charge.(a)Ground floor |
| 40 | (b)first floor |