Irrigation And Waterways Directorate has published Annual Maintenance Contract For Bio-Metric Time Attendance Monitoring Recording System And Leave Module System Including Amc For Pc, All Software & Hardware Etc (Including Biometric Readers, Cctv Cameras, Nvrs, Hard Disks, Network Switches, Lan Cable Netw. Submission Date for this Tender is 03-08-2023. CCTV System Tenders in jalasampad West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Part A : AMC For BAS implented during (1st , 2nd & 3rd phase) Annual comprehensive maintenance contract for 1 (One) year for central server installed at Jalsampad Bhawan and other hardwares and softwares those are installed during 2nd & 3rd phase of BAS works including replacement of defective readers, controllers, POE switches, cameras, NVRs, 1TB SATA HDDs, Patch Panels and firewell protection system by supplying new materials as required to healthy running of the whole system. (for Jalasampad Bhawan implemented during 1st Phase, 15 Different Sites) (From 01.09.2023 to 31.03.2024) = 7 months List of materials as given below :- |
2 | Supplying and installation of Suprema Bio Lite net Model No : BLN-OC. (As per Annexure - I) |
3 | Supplying and installation of Cisco SF300-24PP 24-Port 10/100 PoE Managed Switch with Gigabit Uplinks. (As per Annexure - II) |
4 | Supplying and installation of Honeywell CCTV Camera HIE2PI Performance Lite IP IR Camera 2MP Dome Night Vision. (As per Annexure - III) |
5 | Supplying and installation of Firewell MikroTik RouterBOARD 1100AHx4 Dude Edition with 13 Gigabit Ethernet Ports, RS232 Serial Port and Dual Redundant Power Supplies RB1100AHx4 (As per Annexure - IV) |
6 | Supplying and installation of HEN322204 - 32 Channel NVR, make : Honeywell (As per Annexure - V) |
7 | Supplying and installation of Seagate SkyHawk 4 TB Surveillance Internal Hard Drive HDD - 3.5 Inch SATA 6 Gb/s 64 MB Cache for DVR NVR Security Camera System with Drive Health Management (ST4000VX007) |
8 | Supplying and installation ofAPC Back-UPS BX1100C-IN 1100VA / 660W, 230V, UPS System |
9 | Part B : Manpower For operation & maintenance of BAS implented during (1st , 2nd & 3rd phase) Providing 3 (three) nos proper Technical Man Power for operating PC, server, Attenadnce monitoring server, all software related to BAS maintain and handling, creation of fingerprint enrolement, data handling for BAS/ New Id creation for new staff, report generation printing of card and changing of card for transfer, designation change or loss of card etc. and change of office/ DDO and system software upgradation. As per direction of EIC 3 (three) nos manpower (1 (One) no System Administrator & 2 (two) nos Software Support Personnel) in each working day for Jalasampad Bhawan main central BAS server. (for Jalasampad Bhawan implemented during 1st Phase) (From 01.10.2023 to 31.03.2024) = 6 months |
10 | 1 No System Administrator (SA) x 6 month = 6 man month |
11 | 2 Nos Software Support Personnel (SSP) x 6 month = 12 man month |
12 | Providing 7 (seven) nos proper Technical manpower for operating PC, server, Attendance machine, all software, maintenance of all hardware, creation of fingerprint enrolement, data/ Id, report generation printing of card etc as per direction of EIC 7 (Seven) nos man power for 15 (fifteen) location, 1 no man power will look into 2 (two) sites. (for 15 locations implemented during 2nd Phase) (From 01.10.2023 to 31.03.2024) = 6 months 7 nos Software Support Personnel (SSP) x 6 months = 42 man month |
13 | Providing proper technical man power for operating PC, server, Attendance monitoring server, all software related to BAS maintain and handling, creation of fingerprint enrolment, data handling for BAS/New Id creation for new staff, report generation printing of card and changing of card for transfer, designation change or loss of card etc. and change of office/DDO and system software upgradation as per direction of E.I.C. (8 nos. Software Technician will look for each location contains diff. nearest sites) implemented during 3rd Phase BAS work. (from 01.09.2023 to 31.03.2024) = 7 months 8 nos Software Support Personnel (SSP) x 7 months = 56 man month |
14 | Providing manpower software support personnel (SSP) (2 nos) for smooth operation of the total DR site server, software/ applications 2 persons on monthly basis to take care of day to day issues at new DR site and necessary connectivity. (from 01.12.2023 to 31.03.2024) = 4 months 2 nos Software Support Personnel (SSP) x 4 months = 8 man month |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail