Haryana Police Housing Corporation Limited has published Tender For Construction Of Berth Platform For Prisoners In Prison Barracks At Central Jail, Amabal. Submission Date for this Tender is 25-07-2023. Barrack Tenders in ambala Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. HSR Rate(Rs.) 93.00Through Rate |
2 | HSR Item 10.1-Providing and laying of base course of floors consisting of 100 mm thickcement1:8:16and100mm sandor stone filling. HSR Rate(Rs.) 291.00Through Rate |
3 | HSR Item 10.3-Supplying and providing of Tangri River Sand under floors Including watering and compaction in 25cm layers, dressing etc. complete In all respects (As per item 10.2) HSR Rate(Rs.) 553.00Through Rate |
4 | HSR Item 10.10.2-Providing and laying Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 2. 25 mm thick with 12 mm nominal size stone aggregate HSR Rate(Rs.) 188.00Through Rate |
5 | HSR Item 11.5.4-12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) HSR Rate(Rs.) 76.00Through Rate |
6 | HSR Item 11.60-Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. HSR Rate(Rs.) 66.00Through Rate |
7 | HSR Item 11.64.1-Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 1. New work (two or more coats) over and including water thinnable priming coat with cement primer HSR Rate(Rs.) 50.00Through Rate |
8 | HSR Item 7.22.2-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) HSR Rate(Rs.) 4436.00Through Rate |
9 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) HSR Rate(Rs.) 2735.00Through Rate |