|
| 1 | Dismantling asbestos cement (corrugated/semi corrugated) in roof coverings, etc including ridges, claddings, etc. including all necessary staging / scaffolding, etc. as required and disposing off complete all as specified and as directed |
| 2 | Dismantling rusted / damaged sheeting any type, any gauge or thickness, corrugated / plain as in roof coverings, wall cladding, chajjas, etc. including all necessary staging / scaffolding, etc. as required and disposing off complete all as specified and as directed |
| 3 | Dismantling of wall and ceiling boards (fibre,pulp, insulation, etc. or insulation boards/slabs/blankets, any thickness including cover fillets, frameworks, etc. and disposing off complete all as specified and as directed |
| 4 | Dismantling timber scantlings 40sqcm and over in section, in any position and disposing off complete all as specified and as directed |
| 5 | Taking up/down PVC pipes 110/150mm of any pattern and from any locations and disposing off complete all as specified and as directed |
| 6 | Dismantling floor hearth or wall tiling including cement mortar bedding (but not backing) and disposing off complete all as specified and as directed |
| 7 | S&F steel work in tubular trusses including special shaped washer etc. complete using ERW or induction butt welded tubes conforming to IS:1161-1979 grade St.-240 complete all as specified and as directed |
| 8 | S&F bands, straps, hold fasts, wall ties, cleats, supports or stays of RWPs, ventilation pipes and similar articles of mild steel conforming to Fe-290 grade E-165 including bolts as required complete all as specified and as directed |
| 9 | S&F in position aluminium-zinc colour coated high tensile alloy steel trap corrugated sheeting of 0.5 to 0.53mm thick, high rib, having 550 Mpa yeild strength BMT 0.45mm and zinc (galvanized) and aluminum combined coating of 150 gms/sqm (AZ-150) of 0.50mm TCT having top colour coat of regular modified polyester/silicon modified polyester/HDPE polyester of 18 to 20micron and back coat of 5 to7 micron epoxy primer fixes, RMR 1040 profile width 1125mm in roofing panels / sheeting complete as per manufacturer\"s instructions, all as specified and as directedNote: The sheet shall be fixed to MS angles with self drilling and self topping screws conforming to AS 3566 with moulded EPDM washers |
| 10 | S&F in position aluminium-zinc colour coated high tensile alloy steel trap plain sheeting of 0.5 to 0.53mm thick, high rib, having 550 Mpa yeild strength BMT 0.45mm and zinc (galvanized) and aluminum combined coating of 150 gms/sqm (AZ-150) of 0.50mm TCT having top colour coat of regular modified polyester/silicon modified polyester/HDPE polyester of 18 to 20micron and back coat of 5 to7 micron epoxy primer fixes, RMR 1040 profile width 1125mm in roofing panels / sheeting complete as per manufacturer\"s instructions, all as specified and as directedNote: The sheet shall be fixed to MS angles with self drilling and self topping screws conforming to AS 3566 with moulded EPDM washers |
| 11 | S&F false ceiling with powder coated GI frame work for seamless ceiling comprising of GI perimeter channel 0.55mm thick with 2Nos. unequal flanges of 20 & 30mm and web 27mm fixed to surrounding wall using nylon sleeves at 900mm c/c with GI cleat and steel expansion fasteners with and including ceiling section (not exceeding 1.2m in length) of 0.55mm thickness, having curled web of 50mm and flange 26mm each with lips of 10.5mm fixed to intermediate channel with connecting clips at 457mm c/c to 6mm dia GI hangers (1.2m long) adjusting level fixed to roof slabs by means of ceiling cleats made of GI flat 40x3mm, 60cm long and expansion hold fasteners 12.5mm dia 40mm long including 4mm thick pre-painted decorative non-asbestos fibre cement building boards fixed with screws / laid / inserted on snap grid complete all as specified and as directed |
| 12 | M&L for 2nd class hard wood timber scantling, clean sawn in unframed works and fixed complete all as specified and as directed |
| 13 | M&L for non-skid ceramic tiles, coloured, area of tile exceeding 0.11sqm but not exceeding 0.18sqm each, 7 to 8mm thick of superior quality as in floors, etc. jointed in neat cement slurry @3.00kg of cement per sqm and pointed in white cement mixed with colouring pigment to match shade of tiles, laid over and including 15mm thick screed bed in CM (1:6) (rate shall be included) complete all as specified and as directed |
| 14 | M&L for glazed ceramic tiles, coloured, of size 450x300x7mm thick of superior quality as in skirting, dado, etc. laid over 10mm thick backing coat in CM (1:4) (rate shall be included) pointed in white cement mixed with colouring pigment to match shade of tiles complete all as specified and as directed |
| 15 | M&L for vitrified tiles, coloured, 10mm thick, joint free, edge cut, area of each tile exceeding 0.18sqm but not exceeding 0.36sqm, of superior quality on floors, etc. set and jointed in neat cement slurry and pointed in white cement mixed with pigment to match the colour of tiles, laid over and including 15mm thick screed bed in CM (1:6) (rate shall be included) complete all as specified and as directed |
| 16 | S&F PVC (SWR) pipes, 150mm dia, single socketed in any length with rubber ring joints fixed to walls, etc. for eves gutter as required complete all as specified and as directed |
| 17 | S&F PVC (SWR) bends, 150mm dia, ISI marked, any radius with rubber ring joints, etc. complete all as specified and as directed |
| 18 | S&F PVC (SWR) tee, 150mm dia, ISI marked, any radius with rubber ring joints, etc. complete all as specified and as directed |
| 19 | M&L for preparing of new wood / wood based surfaces of any description over 10cm in width or girth and applying two coats of synthetic enamel paint over a coat of pink primer, tint as approved complete all as specified and as directed |
| 20 | M&L for preparing of new steel / metal surfaces of any description over 10cm in width or girth and applying two coats of synthetic enamel paint (tint as approved) over a coat of red oxide zinc chrome primer complete all as specified and as directed |