|
| 1 | MATERIALS |
| 2 | Anchor/Dead End Clamp for insulated messenger 95 sq mm |
| 3 | Suspension Clamp for insulated messenger for AB Cables 95 sq.mm |
| 4 | Stainless Steel Strap [20 mmx 0.7 mm] |
| 5 | Stainless steel Buckles [20.5mm x 1.5 mm; thickness 1.2 MM |
| 6 | Cable Tie UV Plastic Heavy Duty 250 mm Length |
| 7 | IPC FOR LT ABC3X70+1X50+1X16 Tap 1.5 - 10 sq .mm |
| 8 | IPC FOR ABC 3x95 Tap4-35sqmm |
| 9 | IPC for LT ABC 3X70 +1X50 + 1X16 Tap 16-70 Sqmm |
| 10 | Cable 1.1kV PVC Cu 1c X 2.5 sq.mm |
| 11 | Straight Through Joint for LT ABC 16 sq.mm |
| 12 | Straight Through Joint for LT ABC 70 sq.mm |
| 13 | CABLE LUG Pre insulated Bimetallic 16 Sqmm |
| 14 | Pre- Insulated Crimping Socket Palm Type 70 Sq.mm-Bimetallic (For ABC) |
| 15 | Pole Top Distribution Box LT Outdoor 415 V 25 kW (For Connection from ABC) |
| 16 | End Cap for ABC 70 Sq mm |
| 17 | Earth Connector 95 Sqmm |
| 18 | Satellite Connector for LT ABC 3X70 + 1X50 + 1X16 Tap 2.5-35 Sqmm(50 Sqmm)(4 way) |
| 19 | Aerial Bunched Cable LT3x70 + 1x50 + 1x16 sq.mm(Insulated Messenger) |
| 20 | Cable 1.1kV PVC Insulated AL Twin Core 2.5 Sq.mm PVC Sheathed Weather Proof (TC Weather Proof Wire 1/1.8) |
| 21 | LABOUR |
| 22 | Dismantling (without damage) one km LT Sph 2 wire OH line,cross arms,insulators and stacking the conductors in rolls |
| 23 | Dismantling (withoutdamage) one km LT 3ph 4 wire OH line, cross arms,insulators and stacking the conductors in rolls. |
| 24 | Dismantling (without damage) one km LT additional conductor line,cross arms, insulators and stacking the conductors in rolls. |
| 25 | Dismantling and reconnecting Sph service connection from the OH line incl. Lowering down the WP portion. |
| 26 | Dismantling and reconnecting 3ph service connection from the OH line incl. Lowering down the WP portion |
| 27 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 28 | Erection of Anchor clamp /dead end clamp for LT ABC of any size |
| 29 | Erection of suspension clamp for LT ABC of any size |
| 30 | erection of Stainless steel Strap and Buckles |
| 31 | Providing Cable Tie |
| 32 | Installing One No. Insulation piercing connector of sizeMain :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 33 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 34 | Installation of Insulation piercing connector for mainto service line main :50-150sqmm, Tap : 4-35 sqmm |
| 35 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 36 | Installation of Pre-insulated lugs for 70sqmm |
| 37 | Fitting of one No. pole topservice connection box of standard size (up to 4 way)using ss strap/B&N ofsuitable size in to the PSC/A poles at the standard height excluding giving connections |
| 38 | Providing End Caps |
| 39 | Providing one Earth using earth pipe incl. Digging separate pit at standard distance away from the pole/structure & backfilling. |
| 40 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 41 | Installation of Pre-insulated lugs for 16sqmm |
| 42 | Providing sattelite connectors for consumer connection |
| 43 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |