|
| 1 | SURVEY, SOIL TESTING & DESIGN ENGINEERING COST |
| 2 | Detailed survey of the area |
| 3 | Sub-soil exploration, field & laboratory testing of samples and submission of report |
| 4 | Design Engineering cost for GA and detailed engineering design and drawing of all civil and structural works in the system |
| 5 | Civil and Structural work in Building construction (as per scope of work given in NIT / Tender document) |
| 6 | Classrooms with in-built covered almirah, tiles work on floor & walls, 02 nos. of doors in each classroom |
| 7 | Acoustic auditorium hall of height min. 5 meter for accommodating at least capacity of 500 person including seating arrangements, automatic fire alarm system, wall paneling, false ceiling, airconditioned, music and lighting system, stage and its allied works etc all complete to make it fully acoustic. |
| 8 | Toilets/washrooms for both boys & girls separately at each floor with water supply and sanitary installations complete in all respect |
| 9 | Corridor of minimum width 2500mm (Internal) to provide access to all classrooms including fixing of grill over railing for safety of students. |
| 10 | Landscaping, Horticulture work, development of area as per instruction & approval of NCL. |
| 11 | Automatic Fire Alarm System |
| 12 | Internal water Supply & Sanitery Installation |
| 13 | Internal Electrical Installations |
| 14 | Cost forarea development, Horticulture and Landscaping etc. |
| 15 | Electrical, Mechanical and Furniture items (as per scope of work given in NIT / Tender document) |
| 16 | Ceiling Fan |
| 17 | LED Tubelight |
| 18 | Exhaust Fan 12\" |
| 19 | Exhaust Fan 30\" |
| 20 | 2 Tonne inverter AC |
| 21 | Non-Civil items-E&T inclusive of CCTV system, Digital display baords, PA system etc |
| 22 | Integrated desk cum seating with shelf/storage under desk (40 students per class) |
| 23 | Teachers Table for classrooms |
| 24 | Teachers Chair for classrooms |
| 25 | Steel Almirah |
| 26 | Display board (Notice Board) |
| 27 | RO water purifier |
| 28 | Glass door book shelf |
| 29 | Executive table |
| 30 | steel trunk |
| 31 | Sports Kit |
| 32 | Misc., Fittings, settings and other furnishings/ unforeseen |
| 33 | Any other items / services required for completion of the entire work |
| 34 | Total impact of GST for the purpose of CTC |