| 1 | Poles and Stay Arrangement |
| 2 | Galvanised steel pole of tubular in design and swaged of the length 7 meters with top cap welded and lightning spike @28 per Km with MUFF @14 per Km |
| 3 | Stay arrangement for 7M/8M steel poles |
| 4 | Installation Accessories & Fixtures for ADSS OF Cable: |
| 5 | Formed OFC Dead End & Termination fittings: conveyance of all materials and in |
| 6 | OFC Suspension fittings |
| 7 | DemountablePulley–1Set |
| 8 | Adjustable Cable Storage Bracket |
| 9 | FDMS Type-III |
| 10 | Joint Closure Kits(24F ADSS) |
| 11 | Down Lead Clamp |
| 12 | Pig Tail 20M FCPC |
| 13 | OFC Termination Box 24F |
| 14 | Spare OF cable Box |
| 15 | Services inclusive of all of the following: |
| 16 | Erection of 7 m / 8m poles including excavation, Construction of RCC foundation for mounting/erecting the poles/fixing of MUFF concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint |
| 17 | Slinging / Laying and splicing of ADSS / AOF including fixing of installation accessories and fixtures etc. Splicing & Jointing of Optical Fibre Cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable / AOF Cable and accessories from BSNL’s Store Depot. |
| 18 | Installation of spare OF cable box, FDF and WSC, leading-in arrangement, jointing of Pig Tails and all other related activates for construction of ADSS /Aerial OFC route. |
| 19 | Optional Requirements |
| 20 | Construction of Joint Chambers of bricks, supply & Fixing of GI Pipe and PLB pipe for bringing down the OF Cable, supply of stone slab for covering the Chamber and sand for filling the chamber. |
| 21 | Coil earthing of poles |
| 22 | Laying of PLB pipes at appropriate depth, laying and splicing of underground OF cable |
| 23 | Laying of underground OF cable inside PLB Pipe / DWC Pipe, Concreting work on PLB Pipe / DWC Pipesincluding supply of cement, concrete and curing etc., laying and splicing underground OF cable along bridges, culverts etc. |
| 24 | Laying of OF Cable in PLB Pipe with protection of GI pipe/DWC pipe suspended by means of clamps outside the parapet wall of bridge including supply & fixing of clamps and associated work. |
| 25 | Supply of DWC pipe (63/51 mm) |