| 1 | Supply and Installation of LCS card for Intercom panel - Each card should have provision for minimum 8 intercom connections |
| 2 | Supply of Non Intrinsically safe telephone unit withhandset and dialpad |
| 3 | Installation of Telephone |
| 4 | Cable for telephone (with end connectors) - Fibre optical cable |
| 5 | Supply of 10 pair armoured 0.5 mm copper telephone cable |
| 6 | Supply of 5 pair armoured 0.5 mm dia copper telephone cable. |
| 7 | Supply of 2 core armoured 24/0.2 mm copper cable. |
| 8 | Laying of 5P/10P/2P/telephone cable (Cable laying inside building shall be inside walls. Cost of laying includes cost of wall cutting and re-plastering, putty and re-painting. Cost of laying cables inside pipes is also included. Pipes however shall be supplied by IOCL). Note: The rate of Installation should be inclusive of Cable clamps, Tags, Saddles, Consumables etc |
| 9 | Supply of Flame proof Junction Box (10 Pair) with connector, FLP cable glands for hazardous area applications for Group IIA & IIB gases, duly approved by PESO. |
| 10 | Supply of Flame Proof Junction Box ( 1 Pair) with connector, FLP glands complete for paging system for hazardous area applications for Group IIA & IIB gases, duly approved by PESO. |
| 11 | Installation of Flame proof Junction Box (10 P) with cable glanding and termination |
| 12 | Installation of Flame proof Junction Box (1 P) with cable glanding and termination |
| 13 | Trench cutting, back filling including supply of sand, bricks complete in all respect. |
| 14 | Taking out existing CC interlocking paver blocks from footpath central verge, including removal of rubbish etc., disposal of unserviceable material out of site at unobjectionable place and stacking serviceable material within premises as per direction of Engineer - in-Charge |
| 15 | Laying Corporation supplied interlocking paver blocks of any design /shape laid in required line, level, curvature, colour & pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as/ direction of Engineer-in-charge. |
| 16 | Structural steel work in built up sections/ framed work in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cutting, hoisting, fixing in position & applying a priming coat of approved steel primer etc. as required. |
| 17 | Termination, Testing and Commissioning of the complete system. |
| 18 | RCC/ Road cutting and Making as per tender specification |