| 1 | 1.Repairs to PUE school building West Facing in Seruvamani @ Seruvamani Panchayat. |
| 2 | Clean removel of Plastering surface and racking out jointsincluding cost and conveyance of all materials to site and labour charges etc complete. |
| 3 | Providing forKatta Stone and 12mm Metalincluding and labour charges etc.. |
| 4 | pointing with CM 1:3 using full depth of tiles using 10% by weight of cementincluding cost and conveyanceof materials and all labour charges etc complete |
| 5 | PLASTERING WITH CM 1:3 using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 6 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 7 | Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 8 | Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 9 | Painting Two Coats Approved ready mixed enamal Paint with one coat primer old and new iron work including cost and conveyance of materials and labour chargesetc complete. |
| 10 | BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surfaceincluding cost and conveyance of materials and labour chargesetc complete. |
| 11 | Repairs for Electrical cover |
| 12 | Provision for Spring Rool & Whiteboard |
| 13 | Provision for Teacher cub board |
| 14 | Provision for Cheppal track |
| 15 | Provision for Student cub board |
| 16 | Provision for Picture Painting |
| 17 | 2.Repairs to The PUE school building South Facing in Seruvamani @ Seruvamani Panchayat. |
| 18 | Clean removel of Plastering surface and racking out jointsincluding cost and conveyance of all materials to site and labour charges etc complete. |
| 19 | Providing forKatta Stone and 12mm Metalincluding and labour charges etc.. |
| 20 | pointing with CM 1:3 using full depth of tiles using 10% by weight of cementincluding cost and conveyanceof materials and all labour charges etc complete |
| 21 | PLASTERING WITH CM 1:3 using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 22 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 23 | Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 24 | Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 25 | Painting Two Coats Approved ready mixed enamal Paint with one coat primer old and new iron work including cost and conveyance of materials and labour chargesetc complete. |
| 26 | BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surfaceincluding cost and conveyance of materials and labour chargesetc complete. |
| 27 | Provision for Spring Rool |
| 28 | Provision for Notification Board |
| 29 | Repairs for Steel windows |
| 30 | Provision for Electrification Fan |
| 31 | Provision for Teacher cub board |
| 32 | Provision for Cheppal track |
| 33 | Provision for Student cub board |
| 34 | Provision for Picture Painting |
| 35 | 3.Repairs to The PUE school building East Facing in Seruvamani @ Seruvamani Panchayat. |
| 36 | Clean removel of Plastering surface and racking out jointsincluding cost and conveyance of all materials to site and labour charges etc complete. |
| 37 | Providing forKatta Stone and 12mm Metalincluding and labour charges etc.. |
| 38 | pointing with CM 1:3 using full depth of tiles using 10% by weight of cementincluding cost and conveyanceof materials and all labour charges etc complete |
| 39 | PLASTERING WITH CM 1:3 using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 40 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 41 | Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 42 | Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete. |
| 43 | Painting Two Coats Approved ready mixed enamal Paint with one coat primer old and new iron work including cost and conveyance of materials and labour chargesetc complete. |
| 44 | BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surfaceincluding cost and conveyance of materials and labour chargesetc complete. |
| 45 | Provision for Spring Rool |
| 46 | Provision for Notification Board |
| 47 | Repairs for Steel windows |
| 48 | Provision for Electrification Fan |
| 49 | Provision for Teacher cub board |
| 50 | Provision for Cheppal track |
| 51 | Provision for Student cub board |
| 52 | Provision for Picture Painting |
| 53 | 4.Repairs to Disabled Toilet @ PUE schoolEast Facing in Seruvamani Panchayat. |
| 54 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 55 | PLASTERING WITH CM 1:5using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 56 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 57 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 58 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 59 | Paitingtwo coats over New iron works using ready mixed enamel paint including cost and coveyance of paint and all labour charges etc.. |
| 60 | Provision for Septic tank EWC including all Charges |
| 61 | 5.Repairs to Toilet @PUE school building West Facing-2 in Seruvamani @ Seruvamani Panchayat. |
| 62 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 63 | PLASTERING WITH CM 1:5using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 64 | Paving Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost andconvenyence to Site and all labour charges etccomplete,. |
| 65 | Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2 |
| 66 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 67 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 68 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 69 | Paitingtwo coats over New iron works using ready mixed enamel paint including cost and coveyance of paint and all labour charges etc.. |
| 70 | Supply and Fixing of PVC pipe 110mm for Sanitary Arrangements |
| 71 | Provision for New IRON DOORS |
| 72 | Provision for Leach pit arrangements for urinal with cover Toilet, urinal |
| 73 | Provision for Septic tank |
| 74 | 6.Repairs to Toilet @PUE school building North Facing-2 in Seruvamani @ Seruvamani Panchayat. |
| 75 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 76 | PLASTERING WITH CM 1:5using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 77 | Paving Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost andconvenyence to Site and all labour charges etccomplete,. |
| 78 | Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2 |
| 79 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 80 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 81 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 82 | Paitingtwo coats over New iron works using ready mixed enamel paint including cost and coveyance of paint and all labour charges etc.. |
| 83 | Supply and Fixing of PVC pipe 110mm for Sanitary Arrangements |
| 84 | Provision for 75 mm pvc plain bend |
| 85 | Provision for Leach pit arrangements for urinal with cover slab , urinal |
| 86 | Provision for 110mm PVC TEE |
| 87 | 7.Repairs to Toilet @PUE school building North Facing Elupur in Seruvamani Panchayat. |
| 88 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 89 | PLASTERING WITH CM 1:5using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 90 | Paving Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost andconvenyence to Site and all labour charges etccomplete,. |
| 91 | Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2 |
| 92 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 93 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 94 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 95 | Paitingtwo coats over New iron works using ready mixed enamel paint including cost and coveyance of paint and all labour charges etc.. |
| 96 | Supply and Fixing of PVC pipe 110mm for Sanitary Arrangements |
| 97 | Provision for 75 mm pvc plain bend |
| 98 | Provision for Leach pit arrangements for urinal with cover slab , urinal |
| 99 | Provision for 110mm PVC TEE |
| 100 | 8.Repairs to Toilet @PUE school building South Facing Elupur in Seruvamani Panchayat. |
| 101 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 102 | PLASTERING WITH CM 1:5using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 103 | Paving Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost andconvenyence to Site and all labour charges etccomplete,. |
| 104 | Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2 |
| 105 | white washing two coat with best shell lime including cost of materials and all labour charegs etc complete. |
| 106 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 107 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 108 | Paitingtwo coats over New iron works using ready mixed enamel paint including cost and coveyance of paint and all labour charges etc.. |
| 109 | Supply and Fixing of PVC pipe 110mm for Sanitary Arrangements |
| 110 | Provision for 75 mm pvc plain bend |
| 111 | Provision for Leach pit arrangements for urinal with cover slab , urinal |
| 112 | Provision for 110mm PVC TEE |
| 113 | 9.Repairs to The PUE school building South Facing in Nallur @ Nallur Panchayat. |
| 114 | Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete. |
| 115 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 116 | PLASTERING WITH CM 1:3 using 10mm thick including cost and conveyanceof materials and all labour charges etc complete |
| 117 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement |
| 118 | Door ( 1.10 x 2.00 m) |
| 119 | Window ( 1.15 x 1.35m ) |
| 120 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 121 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 122 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 123 | Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with staPainting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 124 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 125 | Electrical Work |
| 126 | Tube light Fitting |
| 127 | Ceiling Fan |
| 128 | Provision for Sintax tank |
| 129 | Provision for Teacher Cubboard |
| 130 | Provision for Cheppal Rack |
| 131 | Provision for Drinking arrangements |
| 132 | Provision for Student cub board |
| 133 | Provision for Spiral roll |
| 134 | Provision for White board |
| 135 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |