Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Tender For Addition Of 01 No. 132/33 Kv, 63 Mva T/F And Its Bay At 132 Kv S/S Rasara Under Etd, Ballia.. Submission Date for this Tender is 04-07-2023. Transformer Supply Tenders in ballia Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Jun-2023 | Date Extension | Date | 04-07-2023 |
Sl. No. | Item Description |
1 | Bolted type tension gun fitting suitable for Single ACSR Panther conductor . |
2 | Bolted type suspension gun fitting suitable for ACSR Pantherconductor |
3 | P.G Clamp made of Aluminium alloy with 3 Nos. suitable size galvanized G.I. nut, bolts & washer for panther to panther conductor. |
4 | P.G Clamp made of Aluminium alloy with 4 Nos. suitable size galvanized G.I. nut, bolts & washer for moose to Moose conductor. |
5 | P.G Clamp made of Aluminium alloy with 4 Nos. suitable size galvanized G.I. nut, bolts & washer for moose to panther conductor. |
6 | Bus post clamp Suitable forMoose |
7 | Bus post clamp Suitable forPanther |
8 | G.I Nut. Bolt with washer Size- 16x40 mm |
9 | G.I Nut. Bolt with washer Size- 16x45 mm |
10 | G.I Nut. Bolt with washer Size- 16x50 mm |
11 | 70 KN Disc insulator |
12 | 40 mm MS Rod for main Earthmat |
13 | 40 mmDia MS electrodeof 3 meter length |
14 | 36KV ,1-Core 630 sqmm ,XLPE Copper conuctor power cable |
15 | 36KV Termination kit at both end for 1x630 mm^2 mmm XLPE copper cable |
16 | Shifting upto 20 M of main tank ofdismantled 63 MVA ,132/33 KV transformer (defectivem/s Aditya make ) from unloading place to suitable placeincluding turning of tank , if required. All T&P and all other associated works fo completion of job satisfactory. |
17 | Additinal shifting of 5 meter a part therof 10 meter of 63 MVA132/33 KV Transfomer@5 meter per job. |
18 | Shifting upto 20 M of main tank of 40 MVA ,132/33 KV transformer from unloading place to plinth including turning of tank , if required. All T&P and all other associated works fo completion of job satisfactory. |
19 | Additinal shifting of 5 meter a part therof 50 meter of 40 MVA132/33 KV Transfomer@5 meter per job. |
20 | Complete erection of40 MVA, 132/33 KV Transformerby erection of radiators, conservator tank, all bushing, their turrets connecting allpipe lines, cooling fans, motor drive mechanism of tap charger, RTCC panels, oil pumps and associated oil pipe lines etc to complete the job satisfactorily including first filling of oil and topping up of T/F oil (Not circulation) in tank radiators, oil pipe lines, conservator tank etc, and attending the oil leakage, if any and all other associated works for satisfactory completion of job. Crane and T&P shall be provided by the contractor |
21 | Following Testing of t/f oil If any NABL Accredite lab the detail as:- BDV PPM DGA |
22 | Centrifuging of fresh transformer oil and filling of balance oil into the transformer with machine ,operator and to provide final BDV & PPM testing results. Machine and operator will be provided by the contractor. |
23 | Jumpering of 40 MVA T/F HV side 1 X Panther conductor |
24 | LV side with 1X Moose conductor |
25 | Construction of Delta earthing by piercing3.00 meter long electrodes in earth and then connecting them with each other by 75x10 mm M.S flat and connectingtoneutal bushing ,the same with main earthmate at 2 places (X&Y axis of main earth mat of the substation )as required, excluding the cost of M.S. Bar and M.S. flat to be provided by the department free of cost. and all other associated work to completion the job satisfactory. |
26 | Part -C, Work (Erection of63 MVA T/F Bay) Sortng, countingand loading and carriage of substation structure (20MT) from EFU Naini Prayagraj to 132 KV S/S Ballia and after carriage unloading it at 132 KV S/S Ballia. Sortng, countingand loading of G.IS/S Structure(20 MT) at EFU Naini . |
27 | Carriage of S/S Structure(20MT ) from EFU Naini Pryagraj to 132 KV S/S Ballia (Approx distance 350 KM) (20M.T X340KM )=6800. |
28 | Unloadingand stacking of G.IStructure(20 MT)at 132 S/S Ballia. |
29 | Erection of Main and auxiliary structure by shifting of structure from store to work siteas per relevant drawing and practices using Nut - Bolt and spring washers .The material shall be supplied by department free of cost but the contractor has to manageT & P and all other associated work to complete the job satisfactory. |
30 | Stringing ofthreephase 132 KV Jack Bus barwith ACSR single Panther conductor. The workincludes cutting, bending and clamping fitting of tension clamp with all associated accessories, hoisting of insulator string after shifting of material from store to worksite and all other associated work to complete the work satisfactory. 132KV JackBus bar |
31 | 132KV making Y shape Jumpers |
32 | Erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material from store to work site includig all other associated work to complete the job Satisfactory. 145 KVBSI |
33 | 145 KV CT |
34 | 145KV Post Insulator |
35 | 132KV Transformer (C&R)Panel |
36 | 145 KV PT |
37 | 120 KV LA |
38 | 145 KV SF6 ,CB |
39 | Junction box for 145 KV CT |
40 | Erection of 33KV Equipments 30 KV LA |
41 | 36 KV CT |
42 | Junction box for 36 KV CT |
43 | 36 KV VCB |
44 | 36 KV BSI |
45 | 132KV Transformer (C&R)Panel |
46 | Erection of ABT Energy Metering panel with main and check rack |
47 | Doubel feeder control panel of 132KV Chitabargaon |
48 | Dismantiling of 132KV Control panel of 132KV chitabaragaon in old control panel including disconnecting control cablethen shifting in new control panel. |
49 | Equipment interconnection jumpering with main bus bar job includes bending of conductor in proper shape tightening with help of clamps and other associated work to complete the job. Transformer bay for 132KV & 33 KV side |
50 | 132kv transfer bay |
51 | Laying of follwing size control cables from control & relay panels to various equipment junction boxes etcin switchyard as per cable schedule, its binding at every 1.5 mtr. distance with M.S. saddle including carriage of cable from store to work site and shiftingback to store and all associated works to complete the job satisfactorily . 2C x 2.5 sq. mm |
52 | 4Cx 2.5 sq. mm |
53 | 6Cx 2.5 sq. mm |
54 | 10Cx 2.5 sq. mm |
55 | Delta earthing of 120 KV and 30 kv LA consisting of 03 Nos 3 meter long electodes its placing inside the ground and connecting all three electrodes with 75x10 mm MS flat and connecting the same with LAat two place required including cost of M.S stripexcluding cost of M.S round bar. |
56 | Earthing ofMain & Auxiliary structure and various type equipments (CT, PT, CB, LA, LSI, BSI etc ) by M.S strips by cutting to proper size, digging of earth from ground level to earthmat then proper welding as per drawing and leveling earth. Painting of M.S Strips of one coat red oxide primer and two coat with green colourand all associated work to complete the job satisfactory . M.S Flat will be provided by the contractor. 75 x 10 mm |
57 | 50 x 6 mm |
58 | Termination of above cable as per cable schedule including making necessary holes in gland plates of boxes where ever required including Supply and fixing of cable glands of approxinmate size and to provide ferrules and nos. for each core of cable and its termination with all the other associated works to complete the Job. |
59 | Layingof 40 mm dia. Round bar 700 mm below ground level including cutting straightening ,welding painting excavation of earth in trench from back filling after completion of work with all other associated work to complete the job satisfactory ,excluding cost of 40mm dia round bar. |
60 | Fabrication of3 meter long electrode with 40 mmMS round bar having 150 mm conical shape and then its piercingvertically inside the ground with top 700 mm below ground level and its welding exluding cost of 40 mm dia. Round bar. |
61 | Laying of 36KV, 1 X 630 sqmm HT Power XLPEcable(4nos. 03 no for o1 set and 01 core for spare) & jointing of outdoor cable jointing kit (08 No) and other associated work complete the job satisfactory . |