| 1 | CIVILWORKS (PART-I) |
| 2 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area with all labour T&P etc complete as per specification & direction of Engineer-in-charge. |
| 3 | Dismantling aroof timbers of thatched roof including stacking the useful materials for reuse and removing the debris within 50m lead with all labour T&P etc complete as per specification & direction of Engineer-in-charge. |
| 4 | Dismantling double Nuria tileroofing (Tiles only) including stacking the useful materials for reuse and removing the debris within 50m lead with all labour T&P etc complete as per specification & direction of Engineer-in-charge. |
| 5 | Dismantling and removing old tiled flooring including removing the base course and stacking the useful materials for reuse and removing the debris within 50m lead with all labour T&P etc complete as per specification & direction of Engineer-in-charge. |
| 6 | a) Ground Floor |
| 7 | b) 1st Floor |
| 8 | Dismantling wrought and framed timber in roof frame work of floors after careful removal of nail, bolts etc. and stacking the useful materials for reuse and removing the debris within 50m lead with all labour T&P etc complete as per specification & direction of Engineer-in-charge. |
| 9 | Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nutsincluding stacking of the materials for reuse and removing the debris within 50m lead etc. complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. |
| 10 | Supplying, diluting and preparing chemical emulsion like Imidacloprid 30.5 % SC or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as Pre-Constructional Anti-termite Treatment confirming to IS 6313 (Part-II) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center (or as directed by the manufacturer) including the cost of all materials, cost of all labour, conveyance,loading, unloading, T&P, etc. all complete as per the direction of Engineer-in-Charge. |
| 11 | ( The payment shall be made on the basis of actual plinth area of the building at ground floor and vertical faces will not be measured for payment). Note- The contractor shall have to furnish Ten (10) years guarantees to maintain the anti-termite treated area / structure free from termite. In addition to the 10 years guarantee furnished as above, the contractor shall have to furnish ten years (after certificate of final completion) Bank Guarantee Bond issued by any Nationalized Bank executed in favour of the client as directed in the prescribed proforma available in the tender document for an amount of 10% (ten percent) of cost of this item of work. |
| 12 | Providing lifting , hoisting and laying reinforced cement concrete of M 25 grade(using branded cement) to the following structural member or in places as shown in the drawing for all floors with 20 mm and down graded size hard crusher broken granite chips of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumb and finishing the exposed surfaces smooth (if required by grouting / providing plaster with cement mortar 1:4 wherever necesary without any extra cost) scaffolding, including watering and curing for the required period including providing strong, rigid, levelled and plumbed steel / wood centring and shuttering to required shape and size, for floors with steel centring materials, with all necessary bracing and ties and supports pockets for electrical conduits, pipes, PH pipes, for hooks or boxes, switchboards and insert plates, clamps and extension bars, etc, including dismantling the same after the required interval from the date of casting, includingcost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering,curing, sundries. tools and plants etc. complete as per direction of the engineer-in-charge, but excluding cost of steel reinforcement. |
| 13 | a) Ground Floor |
| 14 | b) 1st Floor |
| 15 | Supplying steel i.e.Tor Steel / HYSD Bars from primary producerof SAIL / Tiscon / RINL / JINDAL STEEL / SHYAM STEEL make (grade Fe-500D) includingstraightening, cutting, bending, binding, welding and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work and providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors with labour cess etc. (Linear measurement will be taken and quantity will be calculated on standard weight of tor steel / HYSD bars for all heights) complete as per specification & direction of Engineer-in-charge. |
| 16 | a) Ground Floor |
| 17 | b) 1st Floor |
| 18 | Providing Fly Ash brick masonry work in super structure using 25 X 12 X 8 cm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand),(using branded cement) immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., completeas per the direction of the Engineer-in-charge. |
| 19 | a) First Floor |
| 20 | Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand )(using branded cement) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves or beads where ever necessary, including cost of all materials,labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tools and plants etc. completeas per the direction of the Engineer-in-charge. |
| 21 | a) Ground Floor |
| 22 | b) 1st Floor |
| 23 | Providing 16 mm thick cement plaster with cement mortar of mix (1:6) (Using Branded Cement) with screened and washed sharp sand for mortar and finished smooth to the inside rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves or beads where ever necessary with cost, conveyance, royalties and taxes of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge. |
| 24 | a) Ground Floor |
| 25 | b) 1st Floor |
| 26 | Supplying, fitting and fixing vitrified tiles of premium grade having thickness 10mm confirming to IS 13755 of size 600mm x 600mm Colour printed series (homogenious)of approved make a shade (Orient Bell, Somany, Kajaria, Johnson) in floors on 20mm thick bed of C.M. (1:4) (Using Branded Cement) and filling the joint with white cement mixed with pigment to match the shades of the tile including washing and cleaning with oxalic acid complete including cost of all materials, taxes, labour, labour cess, T&P etc. required for the work completein all respect as per specification & direction of Engineer-in-charge. |
| 27 | a) Ground Floor |
| 28 | Providing, fitting, fixing vitrified tiles of premium grade having thickness 10mm confirming to IS 13756 of size 600mm x 600mm Colour printed series (homogenious) of approved make (Orient Bell, Somany, Kajaria, Johnson)in dados skirting and risers of steps on 12mm thick cement plaster (1:3)(Using Branded Cement) jointed with neat cement mixed with pigment to match the shades of the tiles including washing and cleaning with oxalic acid and polishing etc. complete with cost, conveyance, royalties and taxes of all materials all labour,labour cess complete in all respects as per specification & direction of Engineer-in-charge. |
| 29 | a) Ground Floor |
| 30 | Providing and fixing 45mm X 75mm factory made single extruded WPC (Wood Polymer Composite) solid door/window/Ceosetory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/cum, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2, modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-In- Charge. (Make: WPC Door Frame: Century/Black Cobra/Rajshri Plastiwood,Colour:Coffee Brown) |
| 31 | Note: For WPC solid door/window frames, minus 5mm tolerance in dimensions i.e depth and width of profile shall be acceptable. Variation in profile dimensions on plus side shall be acceptable but no extra payment on this account shall be made. |
| 32 | (a)Ground Floor |
| 33 | (b)First Floor |
| 34 | Supplying, fitting and fixing of 32mm thick flush door shutter with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved design and quality including cost of all door fitting and fixture complete etc including cost of all materials, hardware fittings, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. completeas per the direction of the Engineer-in-charge. |
| 35 | (a)Ground Floor |
| 36 | (b)First Floor |
| 37 | Supplying & fitting, fixing of Un-plasticised poly Vinyl Chloride (UPVC) (FENESTA/NCL VEKA LTD) Three track three panel sliding window-60-series duly Manufactured using UPVC reinforced profiles of 108mm x 45mm x 2.5mm for outer frames and window sash of39mm x 58mm x 2.5mm capable of mounting single glazing system structurally reinforced with hot dip galvanised upto 50 microns of minimum thickness of 1.5mm prefabricated & welded through fusion welding the window frame shall be fitted with 6mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced large coupler at the site using anchor fasteners, silicon rubber sealant, easy glazing / deglazing at site etc. including cost & conveyance of all materials acessories labour charges, Cess, taxes of all materials & product conforming to ASTM D 638-14 EN-477-95 and other applicable codes and standards. |
| 38 | (a)Ground Floor |
| 39 | (b)First Floor |
| 40 | Providing M.S grill of required patterns forwindows/verandahs etc. with M.S flats, square orround bars etc. including applying a coat of approvedsteel primer and two or more coats of syntheticenamel paint of approved make & shade, all completeas per drawing & specification. (All steel sectionscontractor\"s own supply). including cost ,conveyance, taxes of all material, labour ,cess required for the work completeas per the direction of the Engineer-in-charge. |
| 41 | (a)Ground Floor |
| 42 | (b)First Floor |
| 43 | Finishing wall surface with painting two coats with Weather coat paint (1st quality) exterior grade over a coat of Cement Primer (Water based) of approved make & approved shade to make an even finished surface in all floors and heights with all scaffolding and staging charges including cost, conveyance, cess, taxes of all materials, cost of all labours, T & P, sundries etc. as required for the work complete in all respect as per the direction of the Engineer-in-Charge. |
| 44 | a) Ground Floor |
| 45 | b) 1st Floor |
| 46 | Finishing wall surface of walls with Acrylic wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding & staging charges with,cost of all materials, taxes, cess, labour, conveyance, royalties, watering, curing, tools and plants, etc. complete, as per the direction of the Engineer-in-charge. |
| 47 | a) Ground Floor |
| 48 | b) 1st Floor |
| 49 | Providing and applying painting over the plastered surfaces with 2 coats of Plastic emulsion paint over a coat of Cement primer of approved quality and shade, using the required quantity of Plastic emulsion paint as specified by the manufacturerto give an even shade includingcost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 50 | a) Ground Floor |
| 51 | b) 1st Floor |
| 52 | Painting two coats withSynthetic enamel paint of approved quality and shade over a coat of primer (Red Oxide Primer) on surfaces as specified below Steel Surface) to give an even shade with 2 coats of approved quality paint, including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 53 | a) Ground Floor |
| 54 | b) 1st Floor |
| 55 | Providing and fixing Glass Reinforced Concrete (G.R.C) Screens in approved size, pattern, design, shadeand thickness of 50mm on frame and design element in 30mm thick have weight approximately between 3.5 – 4 Kg per Sq. Ft. and color of M/S UniStone make or equivalent. The above weight and thickness is considering dimensions of screens up to 2133mm in height and 1219mm in width and having at least 50% void space. The screens should be made from ‘53 grade’ White Portland Cement manufactured by ‘JK Cement’ or equivalent, Quartz, Fine Silica Sand, Alkali Resistant Glass Fiber manufactured by ‘N.E.G JAPAN’ or equivalent, Super Plasticizers manufactured by ‘BASF’ or equivalent, Polymers manufactured by ‘BASF’ or equivalent and U.V resistant Synthetic inorganic pigments should be used for pigmentation manufactured by ‘BAYFERROX (Germany)’ or equivalent. The material casting should take place in FRP Molds. The fixing of Screens should be ‘Dry fixing’ i.e. to be done with M.S Galvanized Clamps, fixtures and fasteners of Hilti / Fischer. |
| 56 | a) Ground Floor |
| 57 | b) 1st Floor |
| 58 | Manufacturing, Providing and Installation of GFRCCornice (Glass Fiber Reinforced Concrete), Make“SAMUDYAM” of size 230 x 225 mm, with Pattern,design, and colour of approved make to be fixedon/between RCC /Block work Column or structuralwork with Dry Fixing method with appropriate SS Pipe& Cleats frame work, using fasteners, and necessaryhardware etc including MS scaffolding(Client Scope).in Building Façade. The element shall be made from\"53 grade\" Portland Cement make Birla/ \"JK Cement\" or equivalent, Quartz, Fine Silica Sand, Alkali Resistant Glass fibre make \"Owens Corning\" or equivalent, Super plasticizers / Additives make by \"BASF\" or equivalent, Polymers make \"BASF\" or equivalent and U.V resistant Synthetic inorganic pigments shall be used for pigmentation make \"BAYFERROX (Germany)\" or equivalent. The material casting shall take place in Synthetic Rubber / FRP Mould manufactured by Mould / Tool / Mould Grade Resin of Revex/ \"Reckli\" or equivalent. |
| 59 | a) Ground Floor |
| 60 | b) 1st Floor |
| 61 | Providing & fixing of GFRC cladding at wall edges ,Make Samudyam, with pattern, design and color ofapproved make to be ixed on / between RCC/Blockwork column or structural work with dry fixing methodwith appropriate SS pipes and cleats frame work,using fastners and necessary hardwares including MSscaffolding in building facade. The element shall bemade from 53 frade cement make ( Birla/ JK cementor equivalent, Quartz, fine silica sand, alkali resistantglass fibre make ownes corning or equivalent, superplasticizer make by (BASF) Polymers make(BASF),and UV resistant synthetic inorganic pigments shall beused for pigmentation make \"Bayferrox\" or equivalent.The material casting shall take place in syntheticrubber/ FRP mould manufactured by mould/ tool/mould grade resin of revex/ recli |
| 62 | a) Ground Floor |
| 63 | b) 1st Floor |
| 64 | Supplying, fitting & fixing of grid mineral fibre ceilingboard having size 600x600x16mm of approved designand quality complete with frame and all fittings andfixtures including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 65 | a) Ground Floor |
| 66 | b) 1st Floor |
| 67 | Supplying & fixing of roller blinds by fixing powdercoated top channel, bottom channel with bottom endcap, control unit and good quality of 0.60mm thickfabric of approved design and quality etc complete including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 68 | a) Ground Floor |
| 69 | b) 1st Floor |
| 70 | Providing and Fixing of 5 mm thick Click-N-Lock tileswith wear layer is of 0.5 mm, made up of StonePolymer composite and has an IXPE Cushion backingof 1 mm ,100% Water & Termite proof, Scratch / Fire / UV resistant, a Recyclable Green product havingWEL- LOCK click system with suitable skirting.Classification of abrasion resistance ( Rubbing actionof two abrading wheels of S-42 Type , load Applied500 grams, No. of Cycles 4,200).Design as approvedby the Engineer\"MAKE -Welspun / squarefoot or |
| 71 | a) Ground Floor |
| 72 | b) 1st Floor |
| 73 | Steel work of grade - Yst 250 in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer with welding and bolted with special shaped washers (Hot finished seamless type tubes) including cost, conveyance of all materials, all labour, T&P etc complete as per approved design and specification. |
| 74 | Providing and Painting of Epoxy paint (Two or more coats) on steel work at all locations prepared and applied as per manufacturer\"s ecifications including appropriate priming coat(Red Oxide Zinc Chromate) , preparation of surface, etc. complete as per Direction of E.I.C. (Make:Dulux/Nerolac/Berger/Asian Paint) |
| 75 | Supply+ Erection + Transportation of 50mm thick double skin PUF Insulated sandwich Roof Panel having core with Trapezodial sheet in Top & Micro Ribbed Liner Panel sheet in Bottom skin. The PUF panel shall be manufactured on continuous line running on uninterrupted power supply. Panel shall have pre coated GaIvalume sheet on both side of Puf. The pre coated sheet shall be of minimum 550 Mpa steel. The PPGL sheet shall have plastic protective guard film of minimum 25 microns to avoid scratches during transportation. The PU Foam shall be self-extinguishing type confirming to IS 12436.Top Sheet: 0.5mm TCT PPGL RMP AZ-150 sheet with 550 Mpa tensile strength. Bottom Sheet: 0.5mm TCT PPGL RMP AZ-150 sheet with 550 Mpa tensile strength.including cost, conveyance, taxes, transportation of all materials, cost of all labour, sundries, T&P etc. complete as per direction of Engineer in charge.(Make:Kingspan Jindal/Eqv.) |
| 76 | Providing & laying 80mm thick factory made cement concrete interlocking Paver Block of M-40 grade(using branded cement) made by block making machine with strong vibratory compaction of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge |
| 77 | Supplying & fixing pre cast kerb stone of size600x300x150mm of M-30 grade of approved make,design, colour andsize made by block makingmachine with proper compaction fixed in requiredpattern etc complete in all respect conforming to IS5758:1984 including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 78 | Supplying & fixing of wall panelling made of aluminiumanodised section framing conforming to standardaluminium sections as horizontal and verticalmembers with at least 600mm c/c and fixing of 9mmthick BWR ply with 4 mm thick veneer pasting finishedwith melamine polishing complete including cost of all materials, labour, conveyance, taxes, cess, royalties, scaffolding. watering, curing, sundries. tools and plants, etc., complete as per the direction of the Engineer-in-charge. |
| 79 | a) Ground Floor |
| 80 | b) 1st Floor |