Bharat Electronics Limited-BEL has published Rfp For Selection Of System Integrator For Sitc And Camc For 5 Years After 1 Year Warranty Of Automatic Rfid Based Boom Barrier System At Entry/Exit Point Of Mine And Sidings Of Mcl, And Weighbridge Centering System Including Operation Of Rfid Based Boom . Submission Date for this Tender is 14-06-2023. Gate Barrier Systems Tenders in SAMBALPUR Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 10-Jun-2023 | CORRIGENDUM-1 | Fee | 12-06-2023 |
2 | 12-Jun-2023 | CORRIGENDUM-2 | Date | 14-06-2023 |
Sl. No. | Item Description |
1 | RFID Reader - Passive Long Range UHF RFID Reader with TCP/IP Port |
2 | Desktop RFID Writer - UHF Reader and Writer with USB Cable |
3 | RFID Tags - Tamper Proof Windshield Passive UHF RFID Tags with one sided printing |
4 | RFID Cards Temporary Handheld Type in Hard Plastic Cover with One Sided Printing |
5 | Boom Barrier System - with Boom Machine, Safety Sensors, 6m Boom and 2 coloured LED Light Strip |
6 | 2 MP IP IR CCTV Camera |
7 | 16 Channel NVR (ANPR Analytics) with 16TB HDD or more |
8 | PC with 21.5 inch LED Monitor, wuth USB Mouse and Keyboard (i7 Processor, 8 TB RAM, 1TB HDD) |
9 | A4 Monochrome Laser Printer |
10 | Point to Point IP Radio |
11 | Point to Multi Point IP Radio |
12 | 16 Port L2 Industrial Managed Rugged Switch with 2 SFP |
13 | Server at Area Offices |
14 | Server at MCL HQ (Application Server, Database Server, Proxy Server) |
15 | 65 inch LED Display for VTS Control Room at HQ |
16 | 55 inch LED Display for VTS Control Room at Area |
17 | Online UPS (5 KVA) with minm. 2 hrs backup at full load |
18 | Online UPS (2 KVA/6400 VAH) with minm. 2 hrs backup at full load |
19 | Surge Protection Device (SPD) for UPS |
20 | RFID Application Software for Boom Barrier |
21 | Traffic Signal (2 Lights) with Poles |
22 | Portable Cabin with AC, Table, Chairs, Fans, Lights, 2 Windows |
23 | Weighbridge Centering System - With Controller and 2 coloured traffic light with pole |
24 | Stabilizer (3 KVA) for voltage range 110V to 280 V |
25 | Ethernet Surge Protector for IP radios, RFID Reader and CCTV |
26 | Wall Mounted 9U Networking Rack |
27 | 24U Server/ Network Rack (Floor Standing) |
28 | 5 Mtr Pole for RFID Reader and ANPR Camera |
29 | CAT - 6 STP Cable |
30 | Power Cable, 3 core, 2.5 sq. mm |
31 | Maintenance Free Chemical Earthing with BFC Bag Approximately-25 kg with all accessories and earthing Wire |
32 | Supplying and fixing of medium class PVC conduit / HDPE Pipe along with accessories in surface/recess/pole including cutting the wall and making good the same in case of recessed conduit / Pipe as reqd.(25mm) and laying OFC/CAT 6 through conduit as required |
33 | Excavation of trenches, laying of 2 inch GI Pipe, including supply of 2 inch GI Pipe, laying of OFC/Cat- 6/ Power cable through GI pipe and backfilling the trenches , in cement concrete surface/ road , trench depth 0.30 meter , and making good the demolished surface by cement concrete as required. |
34 | Supply & Erection of Self-Supported Tower (18 metres) with Civil Work foundation, earthing, lightening arrestor, aviation lamp etc. |
35 | Boom Barrier Operators (171) for 1st Year (Warranty Period) |
36 | Boom Barrier Operators (171) for 2nd Year (CAMC Period) |
37 | Boom Barrier Operators (171) for 3rd Year (CAMC Period) |
38 | Boom Barrier Operators (171) for 4th Year (CAMC Period) |
39 | Boom Barrier Operators (171) for 5th Year (CAMC Period) |
40 | Boom Barrier Operators (171) for 6th Year (CAMC Period) |
41 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 1st Year (Warranty Period) |
42 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 2ndYear (CAMC Period) |
43 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 3rd Year (CAMC Period) |
44 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 4thYear (CAMC Period) |
45 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 5th Year (CAMC Period) |
46 | INTERNET LL 2 Mbps (1:1) along with other networking equipment for Servers, and for PC at Boom Barrier location at 67 spots as per tender. For 6th Year (CAMC Period) |
47 | CAMC Charges forBoom barrier and Server+CMC Charges forWB Centering System - For 1st Year (CAMC Period) |
48 | CAMC Charges forBoom barrier and Server+CMC Charges forWB Centering System- For 2nd Year (CAMC Period) |
49 | CAMC Charges forBoom barrier and Server+CMC Charges forWB Centering System- For 3rd Year (CAMC Period) |
50 | CMC Charges forBoom barrier and Server+CMC Charges forWB Centering System- For 4th Year (CAMC Period) |
51 | CAMC Charges forBoom barrier and Server+CMC Charges forWB Centering System- For 5th Year (CAMC Period) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail