Tender For Construction Of Ag Floating Roof, Cone Roof (Fixed Type) - Ug Tanks At Jammu Cuf Bpcl, jammu-Jammu And Kashmir

Bridge And Roof Company I Limited has published Tender For Construction Of Ag Floating Roof, Cone Roof (Fixed Type) - Ug Tanks At Jammu Cuf Bpcl. Submission Date for this Tender is 05-07-2023. Shed Construction Tenders in jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

37965058
Corrigendum : Tender For Construction Of Ag Floating Roof, Cone Roof (Fixed Type) - Ug Tanks At Jammu Cuf Bpcl
Open Tender
Indian
Jammu And Kashmir
jammu
05-07-2023

Tender Details

Construction Of Ag Floating Roof, Cone Roof (Fixed Type) - Ug Tanks At Jammu Cuf Bpcl Engagement Of Sub-Contractors For Surface Preparation And Application Of Paint Including Supply Of All Materials And Labours For Construction Of Ag Floating Roof, Cone Roof (Fixed Type) - Ug Tanks At Jammu Cuf For (Bpcl)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Jun-2023 CORRIGENDUM-1 Date 28-06-2023
2 28-Jun-2023 CORRIGENDUM-II Date 05-07-2023

Key Value

Document Fees
INR 2360 /-
EMD
INR 602800.0 /-
Tender Value
INR 4.93 Crore /-

BOQ Items

Name of Work:ENGAGEMENT OF SUB-CONTRACTORS FOR SURFACE PREPARATION AND APPLICATION OF PAINT INCLUDING SUPPLY OF ALL MATERIALS AND LABOURS FOR CONSTRUCTION OF AG FLOATING ROOF, CONE ROOF (FIXEDTYPE) –UG TANKS AT JAMMU CUF FOR BHARAT PETROLEUM CORPORATION LTD. (BPCL)
Sl. No. Item Description
1PAINTING WORKS
2Painting BPCL logoon outer surfaceof the tank with two coats ofminimum 25 microns each of synthetic enamel paint of first quality asperour standard drawing attached. Rate to include for supply of required shade of enamel paints ofapproved make, supply and erection of pipe scaffolding and painting thelogo as per standard drawing complete. Logo should be painted as perrequired colour code. 4 M x 3.2 M
3Painting BPCL logoon outer surfaceof the tank with two coats ofminimum 25 microns each of synthetic enamel paint of first quality asperour standard drawing attached. Rate to include for supply of required shade of enamel paints ofapproved make, supply and erection of pipe scaffolding and painting thelogo as per standard drawing complete. Logo should be painted as perrequired colour code. 3 x 2.4 M
4Supplying and painting tank surface as specifiedwith two coats ofsynthetic enamel paint of standard make for colour bands of 300 mm widthhorizontally 5000 mm from the bottom of the tankbuilding upto 40microns per coat. Rate to include for supply of required shade of enamel paints ofapproved make, on existing scaffolding and painting the color band asper standard drawing complete. Band should be painted as per requiredcolour code.
5BPCL standards including all labour; double scaffolding; equipments etc. complete. Unit to be read as M2.
6Painting Surface preparation of tank by shot blasting to SA 2.5 finishof Swedish Ivonsk Standard SIS 055900-Latest editionto bare metal toensure thorough cleaning of the surfaces to receive paints as perspecifications and BPCL standards including all labour;equipments etc.complete. (double scaffolding shall be paid seperately.) Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Note: Contractor to arrange and keep at site the relevant Swedishphotographic standards for inspection by BPCL Site in charge. Unit to be read as M2.
7Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,testing for thickness etc complete. Primer details given below: One coat of inorganic zinc silicate at 65 micron and one tie coat epoxycoating of 30 micron on existing scaffolding
8Supplying and applying intermediate coat paints on the preparedsurface including all labour, scaffolding,consumables,equipments,paintsetc. complete as per specifications.(primer shall be applied within 8hours of surface preparation) including all labour; double scaffolding;equipments etc. complete. Application Area :Internal / External surface of tank shell,roof(fixed roof),tank appertunances exposed to atmosphere Rate to include wastages, mixing as per manufacture"s specifications,testing for thickness etc complete. Unit to be read as M2. Intermediate coat details given below:One coat of epoxy high buildmicaceous iron oxide at 125 microns on existing scaffolding
9Painting Supply and Applying two coats of Acrylic Aliphatic Polyurethane finishpaint (camaflage painting for Pipe Line and Tanks of BPCL approved make)Volume solids should be minimum 45%. Erection of Scaffolding at allheights for Pipe Line/Tank painting as per std. Specification of BPCL.The rate inclusive of all materials and labour charges etc complete. DFT of 30 Microns for each coat
10Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,providing necessary double scaffolding, testing for thickness etccomplete. Primer details given below: Two coats of Epoxy Zinc Phosphate Primer at 25 microns/coat on existingscaffolding
11Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,testing for thickness etc complete. Primer details given below: One coat of Epoxy Zinc Phosphate Primer at 40 micron/coat on existingscaffolding
12Supplying and applying finish coat paints on the prepared surfaceincluding all labour, double scaffolding,consumables,equipments,paintsetc. complete as per specifications.(primer shall be applied within 8hours of surface preparation) Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Rate to include wastages, mixing as per manufacture"s specifications,providing necessary pipe double scaffolding, testing for thickness,shadeas per painting manual etc complete. Unit to be read as M2. Finish coat details given below:Two coats of solvent free epoxy tanklining at 250 microns/coat (passing MIBK Test)
13Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,testing for thickness etc complete. Primer details given below: One coat of Inorganic zinc silicate primer at 65 micron on existingscaffolding
14Supplying and applying finish coat paints on the prepared surfaceincluding all labour, double scaffolding,consumables,equipments,paintsetc. complete as per specifications.(primer shall be applied within 8hours of surface preparation) Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Rate to include wastages, mixing as per manufacture"s specifications ,testing for thickness,shade as per painting manual etc complete. Unit to be read as M2. Finish coat details given below:Two coats of amine cured epoxy tanklining at 125 microns/coat on existing scaffolding
15Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,providing necessary double scaffolding, testing for thickness etccomplete. Primer details given below: One coat of weldable zinc silicate primerat 25 micron
16Supplying and applying finish coat paints on the prepared surfaceincluding all labour, double scaffolding,consumables,equipments,paintsetc. complete as per specifications.(primer shall be applied within 8hours of surface preparation) Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Rate to include wastages, mixing as per manufacture"s specifications,testing for thickness,shade as per painting manual etc complete. Unit to be read as M2. Finish coat details given below:Two coats of high build coal tar epoxyat 125 micron / coat on existing scaffolding
17Supplying and applying primer on the prepared surface complete as perspecifications (primer shall be applied within 8 hours ofsurfacepreparation) including all labour; double scaffolding; equipments ,consumables,primer etc. complete. Application Area :Internal / External surface of tankshell/bottom/Roof/Pipe Line and internal surface,appertunancesas specified in BPCL painting Manual. Unit to be read as M2. Rate to include wastages, mixing as per manufacturer"s specifications,testing for thickness etc complete. Primer details given below: One coat of surface tolerant epoxy mastic coating at 100 microns onexisting scaffolding
18Supply and painting the following details on the second shell of thetanks in black enamel paint :tank number,name of the product,Tankcapacity,size of the tank,safe filling height,date of painting,date ofcommisioning,date of calibration,date of hydrotesting,due date ofcleaning etc Painting as per standard colour scheme in letters of following heightand as per the instructions of site engineer.Payment shall be made oneach letter for the following size given below 50 MM
19Supply and painting the following details on the second shell of thetanks in black enamel paint :tank number,name of the product,Tankcapacity,size of the tank,safe filling height,date of painting,date ofcommisioning,date of calibration,date of hydrotesting,due date ofcleaning etc Painting as per standard colour scheme in letters of following heightand as per the instructions of site engineer.Payment shall be made oneach letter for the following size given below 80 MM
20Supply and painting the following details on the second shell of thetanks in black enamel paint :tank number,name of the product,Tankcapacity,size of the tank,safe filling height,date of painting,date ofcommisioning,date of calibration,date of hydrotesting,due date ofcleaning etc Painting as per standard colour scheme in letters of following heightand as per the instructions of site engineer.Payment shall be made oneach letter for the following size given below 150 MM
21Supply and painting the following details on the second shell of thetanks in black enamel paint :tank number,name of the product,Tankcapacity,size of the tank,safe filling height,date of painting,date ofcommisioning,date of calibration,date of hydrotesting,due date ofcleaning etc Painting as per standard colour scheme in letters of following heightand as per the instructions of site engineer.Payment shall be made oneach letter for the following size given below 230 MM
22Preparation of external surface of underground storage tank : Surface preparation : Shot blasting upto SA 2.5 finish Primer: 2 coats of tank mastic (100 Micron) Finish coat : 2 coats of tar plastic paint( each coat of2.5mm thickness) Recommended Makes for paints :Asian/Berger/J&N/Shalimar make. Rate shall be paid in M2 basis of painted surface inclusive of cost ofpaint/primer labour etc.complete.
23Painting of internal structural steel of the tanks as perBPCL painting scheme (attached with the tender) including surfacepreparation byShot blasting for getting the surface to match SA 2.5. The cost includes surface preparation by grit/shot blasting to SA2.5finish of swedish standard SIS 05 5900. Primer Coat : After surafce preparation one coate of inrganic zinc silicate @ 65microns. Intermediate Coat: One coat of epoxy high built micaceous iron oxide @ 100 microns. Top Finish Coat : 2 coats of acrylic aliphatic polyeurethene @ 30 microns per coat. Total DFT 225 microns minimum. The rate includes supply of paints, cost of materials, consumables, labour, tools andplants,transportation, loading, unloading, machinery, safety requirents,incidental charges, if any, all complete. (scaffolding work shall not be paid seperately.)
24Painting of Self levelling rolling ladder with riser/runner steps and pipe handrailing along with landing platform as per BPCL painting scheme (attached with the tender) including surfacepreparation byShot blasting for getting the surface to match SA 2.5. Surface Prepararion : Blast Clean to SA 2.5 Primer Coat : Two coats of epoxy zinc phosphate primer at 25 microns per coat Final Coat : Two coats of high build coal tar epoxy at 125 microns per coat (scaffolding work shall not be paid seperately.)
25PAINTING OF STRUCTURE AS PER FOLLOWING SPECIFICATIONS : The cost includes surface preparation by grit/shot blasting to SA2.5finish of swedish standard SIS 05 5900. Primer Coat : After surafce preparation one coate of inrganic zinc silicate @ 65microns. Intermediate Coat: One coat of epoxy high built micaceous iron oxide @ 100 microns. Top Finish Coat : 2 coats of acrylic aliphatic polyeurethene @ 30 microns per coat. Total DFT 225 microns minimum. The rate includes supply of oaints, cost of materials, consumables, labour, tools andplants,transportation, loading, unloading, machinery, safety requirents,incidental charges, if any, all complete. (scaffolding work shall not be paid seperately.)
26Painting works for GI pipes (MVWS Spray, Foam System etc.) The cost includes surface preparation by Manual clean to St- 2/St-3 Primer Coat : One coat of wash primer at 10 microns incl supply of paints. Intermediate Coat : One coat of epoxy zinc phosphate primer at 40 microns per coat incl supply of paints. Final Coat : Two coats of enamel paint at 25 microns per coat including supply of paint. (scaffolding work shall not be paid seperately.)
27"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail