| 1 | (Erection/Labour Part HT Line ) |
| 2 | Erection of S/T pole 9 mtr long,(Double pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 3 | Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 4 | Erection ofHT earthing setcomprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects. |
| 5 | Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 6 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying ofConductor, stringing & sagging, binding with insulator complete in all respects. |
| 7 | Erection of H T line with ACSR100 mm²,7/4.26mmsuch as stringing, tensioning and sagging,jointing andfastening . |
| 8 | Mannual carriage,loading, unloading and transportation of complete Material of H T line from road side to site of work for average distance of 0.100 KM lead. |
| 9 | (Supply Part HT Line) |
| 10 | Prov R.C.C.Muffs for Steel Tubuler Poles with concrete muffing |
| 11 | Belt set-MS Angle Iron: 50x50x6, length [1800 mm x 2 No.] |
| 12 | X-arm (Horizontal)- MS Channel Iron: 100x50x6, length (2340mm X 2 Nos.) |
| 13 | X-Bracing Set MS Angle Iron: 50x50x6, length (2125 mm X 2 Nos.) |
| 14 | X-arm (Horizontal)- MS Channel Iron: 75x40x6, length [2800 mm x 2 Nos.] |
| 15 | Disc insulators set on dead end structure (comprising 1 No. Disc: ^^(Porcelian, BS, 12 KV, 90 KN,) i/c Dead end clamps etc.) x (3 Nos. conductors) x (2 Nos. sides) |
| 16 | 11 KV Pin insulators (Porcelian, 12 KV, 10 KN): 3 Nos. per DP structure |
| 17 | Prov. Stay set complete in all respect |
| 18 | Prov. Stay Wire (7/3.15 mm) (@ 6.0 Kg. Per Stay Set) |
| 19 | HT Earthing Set Complete |
| 20 | Single Continous Earth Wire |
| 21 | Eye Hook for earth wire |
| 22 | Earth wire clamp |
| 23 | Full Clamp |
| 24 | Half Clamps |
| 25 | Prov. M.S. Nuts & Bolts of various sizes with flat and spring washers |
| 26 | Prov. Barbed Wire |
| 27 | Prov. Alluminium Paint . |
| 28 | GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 29 | Danger Plate |
| 30 | Red Oxide |
| 31 | (Erection/Labour Part Sub-Station) |
| 32 | Erection of250 kVA, 11/0.4 kV Sub-Stationcomplete in all respect |
| 33 | Mannual/ Transportation/ Loading /UnloadingCharges of Hydra of 250 KVA,11/0.4kV S/Stn from road side to site of work for average distance between Hamirpur to Mandap i.e. 0.100 kms. |
| 34 | (Supply Part Sub-Station) |
| 35 | Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVAof relevent IS standardand from approved vendors of HPSEBL. |
| 36 | Muffs with concerete filling |
| 37 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] |
| 38 | X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 39 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x(1 Nos for LA\"s + 2 No. for Dist Panel Box) |
| 40 | [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for Supporting Main Channel of DTR |
| 41 | MS Angle Iron (35x35x5)mm, Length 460 mm x 2 Nos. |
| 42 | GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 43 | D.O Fuse Unit |
| 44 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 45 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 46 | Stay set complete |
| 47 | StayWire(7/3.15mm)(6.0kg per stay set) |
| 48 | Pipe Earthing Set |
| 49 | LT Distribution Panel Box with MCCB (400A, 50KA 3P, 1 No.) & ICU 150 A (09 No. rewirable) |
| 50 | Half Clamp (M.S. Flat 50X6 mm) |
| 51 | Full Clamp (M.S. Flat 50X6 mm) |
| 52 | Nuts and Bolts of Various Sizes with flat and spring washers |
| 53 | Aluminium Thimble |
| 54 | Aluminium Thimble |
| 55 | Danger Plate |
| 56 | Aluminium Paint. |
| 57 | Energy Meter( 3-Phase, 4 wire) DLMS compliant 100/5 A CT type for 250 KVA Transformer |
| 58 | CT-PT Combined unit 15 KV/110V 100/5 A |
| 59 | Barbed Wire |
| 60 | Transformer Bed(Civil Work) |
| 61 | Red Oxide |
| 62 | Chain Link Fencing, Angle Iron, Gate etc for Transformer fencing |
| 63 | (Erection/Labour Part LT Line ) |
| 64 | Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 65 | Erection ofLT earthing setcomprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects. |
| 66 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 67 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying ofConductor, stringing & sagging, binding with insulator complete in all respects. |
| 68 | AAAC cond.Erection of LT line with ACSR AAAC 6/1/3.35Conductor(50 mm2) such as stringing, tensioning and sagging,jointing andfastening . |
| 69 | Mannual carriage loading, unloading and transportation of complete Material of L T line from road side to site of work for average distance of 0.100 KM lead. |
| 70 | (Supply Part LT Line) |
| 71 | Prov. RCC Muff with concrete filling |
| 72 | AI (75x75x6) (length 1.5 mtr.) |
| 73 | Shackle Insulator |
| 74 | D iron(u- clamp) |
| 75 | Earth Knob |
| 76 | LT Stay Set |
| 77 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 78 | Kit Kat IC |
| 79 | Full Clamps (2 No. for AI & 1 No. for Stay Set) |
| 80 | LT Earthing Set Complete |
| 81 | Prov. M.S. Nuts & Bolts of various sizes with flat and spring washers |
| 82 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 83 | Spool Tie |
| 84 | Prov. Alluminium Paint . |
| 85 | Spiral PVC Spacer |
| 86 | Red Oxide |