| 1 | Demolishing cement concrete manually/ by mechanical means including disposal up to all leads & lifts of material as per direction of Engineer- in - charge(a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights . |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth upto all lead and lifts. Complete in all respect as per the direction of Engineer In-Charge . |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : -1:5:10 (1 cement : 5 fine sand : 10 gradedstone aggregate 40 mm nominal size) Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights. |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size .Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights. ISI make |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete upto plinth level.Mild steel and Medium Tensile steel bars . Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights. ISI Make. |
| 6 | Dismantling of steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking up to all leads & lifts.Complete in all respect as per the direction of Engineer In-Charge. |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. ( Old dismentled steel) (30% of through rate).Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights. |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer .Complete in all respect as per the direction of Engineer In-Charge. ISI make |
| 9 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever (a) 0.63 mm thick with zinc coating not less than275 gm/ m² .Complete in all respect up to all lead, lifts & height as per the direction of Engineer In-Chargeup to all leads, lifts & heights . |
| 10 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. (a) 0.63 mm thick with zinc coating not less than 275 gm/m². Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights . |
| 11 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar.(a)Red sand stone cement mortar 1:5 (1 cement : 5 coarse sand) . Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights. |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) Two coats on new work over and under coat of suitable shade with ordinarypaint of approved brand and manufacture .Complete in all respect as per the direction of Engineer In-Chargeup to all leads, lifts & heights ( Assian paints) |