Public Works Department-PWD has published Construction Of 50 Bedded Upgraded To 100 Bedded Additional Accommodation For Civil Hospital At Jawalamukhi, Distt. Kangra, Hp (Sh- Providing Lan System Therein). Submission Date for this Tender is 31-05-2023. Building Work Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-May-2023 | corrigendum | Financial Bid | 31-05-2023 |
Sl. No. | Item Description |
1 | Supply, installation, testing & Commissioning of UTP Cat 6 cable in existing pipe/channel complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. Make:- Molex/R&M/Semon. |
2 | Supply, installation, testing & Commissioning of UTP cat 6information outlet( RED - for Data - User End) complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. Make:Molex/R&M/Semon . |
3 | Supply, installation, testing & Commissioning ofUTP Face plate(Single/dual) complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. Make: Molex/R&M/Semon. |
4 | Supply, installation, testing & Commissioning of UTP cat 6Mounting Patch CordsLow smoke zero helogene (LSZH/LS0H )complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. Make:- Molex/R&M/Semon . |
5 | 3 FT lenth |
6 | 7 FT lenth |
7 | Supply, installation, testing & Commissioning of UTP cat 6 24 port jack pannelcomplte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. Makes:- Molex/R&M/Semon . |
8 | Supply, installation, testing & Commissioning of Edge Switch 24 Port 10/100/1000 plus 4 SFP Layer 2 manageble Base T Manageble auto sense, Ethernet switch complete in all respect up to the entire satisfaction of Engineer-in charge of work. Makes: CISCO C 9200 -24 -4G-E/Allied X 230-28 GT/Juiper EX2300-24 GT / D-link-DGS-1250-28X. |
9 | Supply, installation, testing & Commissioning of L3 Switch with 24x1G SFP Ports and 4 1/10GxSFP+ Ports, 4K VLAN,IEEE 802.1ad Provider, bridges (VLAN stacking, Q-in-Q),IP v4: IGMP v1, v2 and v3,MLD Snooping v1/v2,IPv6 : MLD, OSPF, RIP, PIM ITU-T G.8032 for ring ,protection,Link Aggregation based on 802.3ad across the, switches.802.1p/Tos/ Diffserv marking and mapping,IP Source , Guard, Dynamic ARP Inspection, IEEE 802.1x and DHCP,snooping,IPv6 Logo Ready, EN55032, EN55024,UL, EN60950. Operating Temp: 0 to 45 C. Makes: Cisco C9300 series/ Allied Telesis AT-x510 series/ Juniper EX4300 series./D-link-DGS-1250-28X. |
10 | Supply, installation, testing & Commissioning of 1G SFP+ Transceiver for Single Mode Fibercomplete in all respect up to the entire satisfaction of Engineer-in charge of work. Make:Allied/CISCO/Juniper. |
11 | Supply, installation, testing & Commissioning of 6 core SM Optical fiber. Makes:- Molex/R&M/Simon |
12 | Supply, installation, testing & Commissioningof 24 Port LIU. Make:- Molex/R&M/Simon. |
13 | Supply, installation, testing & Commissioningof 24 Port LIU. Make:- Molex/R&M/Simon. |
14 | Supply, installation, testing & Commissioning ofLC to SC Patch Cord. Make:- Molex/R&M/Simon. |
15 | Supply, installation, testing & Commissioning of SC SM Pigtail. Make:- Molex/R&M/Simon. |
16 | Supply, installation, testing & Commissioning of12 U rack with cable manager,fan tray,power distribution kit complete in all respect. Make: Comrack/Netrack/Wallrack. |
17 | Supply, installation, testing & Commissioning of 9 U rack with cable manager,fan tray,power distribution kit complete in all respect. Make: HCL/ Comrack/ Wallrack/ Netrack. |
18 | Supply, installation, testing & Commissioning of 1KVA off line UPS with 3 nos 17 AH 12V along with batteries stand comple in all respect. Make:-APC/Numeric/Microtek. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail