}

Tender For Renovation Works In Board Room, Entrance Lobby And Staircase Areas Of Admin Block - I At Cpcl, Manali Refinery., manali-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Tender For Renovation Works In Board Room, Entrance Lobby And Staircase Areas Of Admin Block - I At Cpcl, Manali Refinery.. Submission Date for this Tender is 05-06-2023. Building Work Tenders in manali Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37830581
Corrigendum : Tender For Renovation Works In Board Room, Entrance Lobby And Staircase Areas Of Admin Block - I At Cpcl, Manali Refinery.
Limitted
Indian
Tamil Nadu
manali
05-06-2023

Tender Details

Renovation Works In Board Room, Entrance Lobby And Staircase Areas Of Admin Block - I At Cpcl, Manali Refinery. , Renovation Works In Board Room , Civil Work , Demolition Of Brick Masonry Work In Lime Or Cement Mortar (Taking All Necessary Safety Precautions) ,Manually / By Mechanical Means Forheights 2.28M Above Plinth Level Including Supply Of All Tools And Tackles, Necessary Scaffolding, Propping, Underpinning, Cleaning And Disposal Of Unserviceable Materials To The Designated Place Within The Refinery Premises As Directed Andincluding Breaking Into Pieces, All Labor, Tools, Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge.( Refer Drawings Sheet No : 1 ) , Providing, Mixing Andlaying In Position Rccm35 With 20Mm And Down Graded Coarse Aggregates As Per Is 456:2000 With A Minimum Cement Content Of 400Kg/Cu.M. Using 53 Grade Ordinary Portland Cement In Lintel Above Door Including Cost Of Shuttering,Admixtures,Labour Charges, Tools And Tackles,Providing Pockets, Openings, Recesses, Chamfering, Wherever Requried, Vibrating, Tamping, Curing And Rendering If Required To Give A Smooth & Even Surface, Providing Neat Cement Wash, Etc. (Excluding The Cost Of Reinforcement), Etc. All Complete As Specified,And Directed By Engineer-In-Charge. , Removal Of Existing Wooden Flooring Taking All Necessary Safety Precautions, Manually / By Mechanical Means Including Supply Of All Tools And Tackles, Propping, Underpinning, Cleaning And Disposal Of Unserviceable Materials To The Designated Place Within The Refinery Premises As Directed Andincluding Breaking Into Pieces, All Labor, Tools, Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge.( Refer Drawings Sheet No : 1 ) , Providing & Layingcement Concrete Screed Using Machine Trowel Of Mix 1:1.5:3 (1 Cement : 1.5 M Sand: 3 Coarse Aggregates 12.5Mm And Down Graded Aggregates) Using 53 Grade Opc Inboard Room & Inclusive Of Curing/Pond Curing, Brooming With Wire Brush, Finishingetc.All Labours, Tools And Tackles Complete As Per Drawing, Specification & As Directed By Engineer In Charge. , Dismantling Of False Ceiling And Wall Panelling With Frame Workof Any Description(Taking All Necessary Safety Precautions) For All Heights Above Floor Level Including Hire Charges For Tools & Tackles, Providing Necessary Scaffolding, Propping, Underpinning, Temporary Supports Etc. ,As Per The Instruction Of Engineer-In-Charge, Cleaning And Stacking, Transporting, Loading & Unloading And Handing Over Of Serviceable Material Like Aluminium Frames At Destined Location /Cpcl Storage Yardwithin The Refinery Area And Disposal Of Unserviceable Material Atdesignated Place Within The Refinery Area As Per Specification And Directions Of Engineer-In-Charge. ( Refer Drawings Sheet No : 1 ) , Dismantling Of Windows & Doorswith Frame, Shutterschowkhats, Architrave, Holdfasts Grill ,Etc. All Complete Including Hire Charges For All Tools & Tackles Required For Carrying Out Dismantling,Stacking Material, Transporting, Loading & Unloading And Handing Overto Scrap Yard/Stores Within Refinery Premisesas Specified And Directed By The Engineer-In-Charge. ( Refer Drawings Sheet No : 2 ) , Providing And Laying Brick Masonry In Super Structureabove Ffl Level Using Cement Mortar 1:5 (1 Cement:5 Coarse Sand)For Allheightsincluding The Cost Of Materials, Labour,Tools And Tackles, Scaffolding/Staging, Sampling And Testing, Soaking Of Bricks, Cutting And Laying Of Bricks, Providing Recesses, Making Openings Of Any Shape And Size,Embedding The Fittings,Curing, Etc. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Providing 15Mm Thick Cement Plaster In Cement Mortar 1:4 (1Cement:4 M Sand) Onbrick Masonry, Pcc/Rcc Surfaces Including Preparation Of Base, Cleaning, Chipping, Hacking Of Existing Plaster, Scaffolding If Required, Finishing, Curingincludingmouldings And Providing Grooves In Plaster, Etc. As Specifiedfor All Depths And Heights Including Labour Charges,Tools And Tackles,Material Costs Etc. As Per Specifications And Asdirected By The Engineer-In-Charge. , Providing 6Mm Thick Cement Plaster In Cement Mortar 1:3 (1Cement:3 M Sand By Volume) On Roof Ceilings, Concretesurfaces Including Preparation Of Base, Cleaning, Chipping,Hacking Of Existing Plaster, Packing Of Electrical Works,Scaffolding, Finishing, Curing Etc.For All Heights Complete With All Labour Charges,Material Costs,Tools And Tackles Etc.As Per Specifications And As Directed By The Engineer-In-Charge. , Repair Of Existing Walls & Ceiling Plasters Of Varying Thickness Of 12Mm To 20Mm Including Cutting The Patch In Proper Shape, Raking Out Joints, Preparing And Plastering The Surface Of The Walls And Ceilings Complete Including Disposal Of Rubbish To The Designated Place Within The Refinery Premises With Cement Mortar 1:4 (1 Cement : 4 Fine Aggregate). Rate Inclusive Of Chipping And Scaffolding. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Flooring Tiles , Nylon Carpet Tile Of Multi Level Loop Pile Type Of Size 500X500mm With 100% Nylon 6 Yawn, Height Of The Pile Should Be 3.5Mm, Overall Thickness Of Carpet Should Be 6Mm. The Pile Weight Be 680G/Sqm. The Brand, Shade, Pattern And Colour Shouldbe Approved By E-Inc. (Refer Drawings Sheet No: 1) Samples To Be Submitted To Eic For Approval. , False Ceiling , Providing And Fixing Suspended12.5Mm Gypboard Plain Panel Ceiling Including Gypserra Perimeter Channelis Fixed Along The Perimeter Of Existing Wal With The Help Of Hilti Hps - 1 (6X40) Impact Anchor, At 600Mm Centres.Gypserra Ceiling Angleis Suspended By Fixing It To The Gyproc Soffit Cleat And Or Gyproc Rawl Plug-8X45mm Creating 1220Mm X 1220Mm Grid.Gypserra Intermediate Channelis Fixed To The Gypserra Ceiiing Angle With M6 X 12Mm Hex Bolt & Hex Nut Arrangement Or With 2 Nos Of Ø4.2X13 Gyproc Metal To Metal Screw. The Gypserra Ceiling Sectionis Then Fixed To The Gypserra Intermediate Channelwith The Help Of Gyproc Connecting Clipand In Direction Perpendicular To The Intermediate Channel At 457Mm C/C. Single Layer Of 12.5Mm Tapered Edge Gypboard Plain Tile (Conforming To Is 2095 Part 1 : 2011) Is Then Screw Fixed To Ceiling Section With 25Mm Drywall Screwsat230mm Centres On Ceiling Section And 150Mm At Periphery Of Ceiling.Finally Square And Tapered Edges Of The Boards Are To Be Jointed And Finished So As To Have A Flush Look Which Includes Filling And Finishing With Jointing Compound & Joint Paper Tape.The Work Is To Be Executed All Complete At All Different Elevations Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Supply & Fixing Of 600X600mm Aluminium Tile Perforated With Easy Demountable Clip-In Tile With Clip-In U Channel System Manufactured Out Of 0.7Mm Thick Coil Coated On A Continuous Coil Coating Process On Aluminium Alloy 3105 With 2.4Mm Dia Perforated 16% Openness In 5.5Mm Pitch With Nwt Acoustical Tissues At The Rear Side Of The Tile, Self-Glued To Achieve 0.7Nrc.The Work Is To Be Executed All Complete Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Providing And Fixing Linear Slat Ceiling 80B Perforated Aluminium Panel & V Groove Ceiling Manufactured By M/S Hunter Douglas India Pvt. Ltd. Of Walnut Wood Colour Consisting Of Panel 80Mm X 15 Mm Deep X 0.5Mm Thick Perforated Aluminium Panel Of 2 Mm Diameter Diagonal Patten With 5 Mm Centre To Centre Apertures Represents 16 % Openness With Panel Length Up To 6 Mtr, Coil Coated On A Continuous Paint Line, And Shall Be Stove Enamelled In A Continuous Coil Coating Process With The Approved Colour On The Exposed Side And The Reverse Side With Polyester Primer. The Work Is To Be Executed All Complete Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Wall Paneling , Providing Wall Panelling On Existing Brick Wall With 25Mm X 50 Mmx2mm(0.767Kg/M) Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Of 8 Mm Thick Bwp Plywood By Screwing To The Aluminium Framework And Providing With Walnut Veneer Of Greenply/Century/Archidplyon Exposed Side And Applying With Approved Quality Antitermite Chemical Solution On Concealed Surfaces With All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade ,Colour,Tecture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 4-7 ) , Providing Wall Panelling With 5Mm Thickwhite Coloured Saint Gobain Glass Pasted To The 8Mm Thk Bwp Plywood Using Silycon Sealant And 3M Double Sided Tapeas Shown In The Drawing Which Is Screwed To 25Mm X 50 Mmx2mm(0.767Kg/M) Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps Over The Brick Wall With Approved Quality Antitermite Chemical Solution On Concealed Surfaces. All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Sheet No : 4 - 7) ( Rate To Be Quoted Based On The Actual Glass Sizes To Be Fixed At Site Including Wasteages ) ( Refer Drawings Sheet No : 4-7 ) , Providing & Fixing Of Knauf Solutions (Armstrong) ‘Optra Acoustical Wall Paneling’ With Square Edges Made Of Fibre Glass Substrate 25Mm Thick And Wrapped On The Front Side With An Acoustically Transparent And Classified For Fire Reaction Class B-S1, D1 As Per En13501, Fabric With An Option Of Colors – Husk As Per The Choice Of The Architect Providing A Minimum Sound Absorption Level Of 0.90 Nrc To Be Affixed To Wall Using Wall Panel Impalers Supplied By M/S Knauf Ceiling Solutions (Armstrong)Industries India Pvt. Ltd And Construction Adhesives As Per The Instructions Laid Down By The Manufacturer. ( Refer Drawings Sheet No : 4-7 ) , Providing And Fixing Backing Surface For Fabric Knauf Panels Over 25Mm X 50 Mmx 2Mm(0.767Kg/M)Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Of 8 Mm Thick Bwp Plywood By Screwing To The Aluminium Framework A With Approved Quality Antitermite Chemical Solution On Concealed Surfaces With All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge. ( Refer Drawings Sheet No : 4-7 ) , Providing Wall Panelling On Existing Brick Wall With 25Mm X 50 Mmx2mm(0.767Kg/M) Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Europratik Louvers Or Its Equvt, Walnut Woodshade As Approved By E-In-C, Over 8 Mm Thick Bwp Plywood Which Is Screwing To The Aluminium Framework With Approved Quality Antitermite Chemical Solution On Concealed Surfacesall Complete Including Material Costs,Labour Costs,Tools And Tackles As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 4-7 ) , Door, Upvc Windows, Upvc Doors, Upvc Ventilators , Providing And Fixing In Position Fenesta Double Glazed Toughen Glass Openable Windowwalnut Wood Colour(No. Of Panels As Approved(With Clear 5Mm Thick Glass Double Glazing For Sound Proofing ),With G.I , Member 1.5 Mm Of White In Colour Including All Fixtures, Fastenings, Handle With Flush Lock, Epdm Gaskets, Wool Pile Etc., Making Recesses In Brick/Concrete Surfaces And Making Good The Same After Fixing Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 1) , Providing And Fixing In Positionupvc Doors (Electrical Room External Door ) Single Leaf Lwhite In Colour Upvc Panels Of Minimum 15Mm Thickness (Doors May Be Either Partly Glazed , Partly Paneled Or Fully Panelled)With Upvc Stiles, Rails,Frame And Accessories Holdfasts, Hinges, Pull Handles On Both Sides, Locking Arrangement As Per Requirementincluding Labour Charges, Material Cost, Tools And Tackles All Complete As Per Specifications & As Directed By Engineer-In-Charge. , Providing And Fixing Isi Marked, 30Mm Thick Bwp Flush Door Shutters Of Greenply/Century/Archidplydecorative Type, Consisting Of Solid Core Block Board Bonded With Phenol Formaldehyde Synthetic Resin Andwith 4Mm Overall Thickness Walnut Veneer Of Greenply/Century/Archidply Facing Both Sides With 1St Class Teak Wood Lipping On All Edges. The Center Part Should Be Removed As Mentioned In Drawing And Should Be Fixed With 8Mm Thk Bwp Plywood With 4Mm Thk Veneer On Both Sides Andproviding 6Mm Thick Teakwood Perimeter Beading Fixed By Means Of Approved Quality Neoprene Based Adhesive And Nailing @ 300Mm Max., Providing And Fixing 125Mm Long Stainless Steel Butt Hinges [For Each Shutter (Vertical Spacing Not Exceeding 600Mm) ] Including Providing Wooden Filler/Sealer, Stainless Steel Lock, Door Bush, Finishing Etc . Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providing And Fixing Isi Marked, Overall 30Mm Thick Bwp Flush Door Shutters Of Greenply/Century/Archidplydecorative Type, Consisting Of Solid Core Block Board Bonded With Phenol Formaldehyde Synthetic Resin And Fixedwith 4Mm Overall Thickness Walnut Veneer Of Greenply/Century/Archidplyon External Sideand Internal Side Fixed With Prefinished Charcoal Louvers Of Europratik Or Its Equivalent, Walnut Woodshade As Approved By E-In-C,.And Fixing 125Mm Long Stainless Steel Butt Hinges(Vertical Spacing Not Exceeding 600Mm)Including Providing Wooden Filler/Sealer, Stainless Steel Lock , Door Bush, Finishing Etc . Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providing And Fixingsecond Class Teak Wooden Frames150mmx60mm,For Doors For All Heights Including All Labours, Tools, Tackles, Cutting, Shaping, Jointing,Applying 2 Coats Of Wood Primer Mixed With Approved Quality Antitermite Chemical Solution On Concealed Surfaces, Fixing In Masonry/Rcc By Means Of 300Mm X 25Mm X 6Mm Thick M.S. Hold Fasts Screwed To Frame @ 600Mm Max Vertically And Grouted With 1:2:4Concrete By Volume In Min. 350Mm X 100Mmx100mm Sized Hole Made In Masonry/96Mm Long, 12Mm Dia M.S. Dash Fastner Etc. All Complete As Dirercted By Engineer-In-Charge. , Providing And Fixingaluminium Extruded Section Body Tubular Type Universal Hydraulic Door Closer Of Dorma Make With Double Speed Adjustment With Necessaryaccessories And Screws With All Labour Charges,Tools & Tackles Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge , Providing And Fixing Bright Finished Cp Brass 100Mm Mortice Handle With Lock Of Godrej Make Model As Approved By Eic, Isi Marked With Four Levers And A Pair Of Polished Stainless Steel Decorative Handles (Size Of Handles To Match The Door Size) With Necessary Screws Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge , Cabinets , Providing & Fixing Console Cabinet Tableof Size As Mentioned In Drgs Made Out Of18mm Thkbwpplywood With Walnut Shade Veneer Of Greenply/Century/Archidply,On External Surfaces And 1Mm Laminate On Internal Surface With Rehal Tape Of Walnut Shade And Finished With Saint Gobain 10 Mm Thickwhite Colour Glass Counter Top. The Cabinet Should Be Fitted With Eco Hinges And Chromium Plated Angle. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 21 ) , Providing & Fixing Wall Cabinet Around Tv Unit Of Size As Mentioned In Drgs Made Out Of18mm Thkbwpplywood Withwalnut Shade Veneer Of Greenply/Century/Archidply Finish Exposed Surface Of Wanut Shade With Openable Shuttersand Internal Surface To Be Finished With Laminate Of Walnaut Shade Using Butterfly Hinges And Chromium Plated Angle. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 5) , Special Elements , Providing And Fixing 25Mm X 40Mml Shape Stainless Steel Profile(Euro Pratik Elite Section Or Approved Equivalent ) Silver Finish As Edge Profile Glued With Sr Fevicol Including Material Costs,Labour,Tools And Tackles Ect.All Complete As Directed By Engineer In Charge. ( Refer Drawings Sheet No : 12 ) , Providing And Fixingaluminium Ripple Fold Concealed Curtain Track With Necessary Plastic Hooks And Wheels As Required, Screwed To The 18Mm Thk Bwp Plywood Box Section Which Is Srewed To The Side Wall / Lintel. The Work Is To Be Executed All Completeincluding Material Costs,Labour ,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providing And Fixing Satin Fabric Curtains ( Should Absorb Sound And Blackout The Light ). It Should Be Installed In A Ripple Fold Pattern. The Measurement Of The Curtain Is Based On The Width Of The Track And The Total Height Is From Floor Level.The Work Is To Be Executed All Complete Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providingandapplying Two Coats Ofinterior Royal Emulsion Paintwithasian Paint Or Approved Equivalent Make Of Any Shades/Colours Asper The Specifications And Including A Priming Coat With Cement Primer Of Approved Brand Of The Same And Appling One Coat Of Wall Putty, For Roof Ceiling/ Rafters/Walls/Wall Panelling/Ceiling, And Drywall Partition Withnecessaryscaffolding And Surface Preparation, Sand Papering, Scrapping & Removing Old Loose Paint Films, Filling All Holes And Depressions, Etc., Complete As Per Specification And As Directed By Engineer-In-Charge.Note-In Case Of Painting In Existing Walls Entire Wall Is To Be Cleaned And Putty To Be Applied Before Painting. , Disassembling The Conference Table Into 2 Or More Parts As Required, Shifting To Designated Location Before Commencement Of Dismantling Works Inside Board Room, Shifting Back To Board Room After Completion Of Board Room Interior Works, Reassemblingand Fixing Of 4Mm Thk Walnut Shade Veneer Of Greenply/Century/Archidply Above The Existing Conference Table Top With Teak Wood Perimeter Beading Of 6Mm Thikness On Vertical Edge Of Height 60Mm Or As Req. And Finish With Pu Varnish. All Complete Including Materials, Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.( Theveneer Need Not To Be Replaced Below The Table) , Repolishing Of Conference Table Vertical Support By Changing The Existing Teakwood Color To Walnut Color As Directed Bt E-In-C. The Set Durface Shall Be Finished With Melamine Matt Finish To Match The Same Walnutfinishsimilar Toveneer Fixed To Table Top. All Complete Including Materials, Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge , Providing And Fixing 5Mm Thickwhite Coloured Saint Gobain Glassusing Silycon Sealant And 3Mm Double Sided Tapeon Center Of The Table As Mentioned In Drawings. All Complete Including Materials, Labour Costs ,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge , Preparation Of New / Old Wood Surfacesby Applying Filler Coat,Staining Varnish Polish To Veneer/ Wooden Surfaces Of Shade And Colour As Approved By E-In-C And Applying One Layer Spray Coat Of Pu Coat( Polyurethane Coating) Semi Matt Finish Including All Labour Charges ,Material Charges Etc. All Complete As Directed By Engineer-In-Charge , Furniture , Supply Ofgodrej - La Sede High Back Chair [Conference - 17 ] As Per Following Specifications. Seat/Back Assembly : The Cushioned Seat Should Be Made Of Injection Molded Plastic Outer & Inner.Plastic Inner Should Be Upholstered With Pure Leather And Moulded High Resilience (Hr) Polyurethane Foam Of Density 45±2 Kg/M3,And Hardness Load 16 ± 2 Kgf For 25% Compression.The Cushioned Backshould Be Made Of Pu Foam With Insitu Molded Ms E.R.W Round Tube Of Size 1.9±0.03Cm X 0.16 ±0.0128Cm. It Upholstered With Pure Leather. Seat Size : 47.6 Cm. (W) X 49.2 Cm. (D)Back Size : 47.5 Cm. (W) X 77 Cm. (D) Armrests: The Armrest Top Should Be Moulded From Polyurethane(Pu), Upholstered In Pure Leather And Mounted On To A Drop Lift Adjustable Type Tubular Armrest Support Made Of 03.81±0.03Cm X 0.2±0.01 Cm Thk M.S E.R.W Tube Having Chrome Plated Finish.The Armrest Height Adjustable Up To 6.5±0.5Cm In 5 Stepsactive Bio-Synchro Mechanism: The Adjustable Tilting Mechanism Should Be Designed With The Following Features:• 360° Revolving Type.• Front-Pivot For Tilt With Feet Resting On Ground And Continuous Lumbar Support Ensuring More Comfort.• Tilt Tension Adjustment Can Be Operated In Seating Position.• 5-Position Tilt Limiter Giving Option Of Variable Tilt Angle To The Chair.• Seat/Back Tilting Ratio Of 1: 2• The Mechanism Housing Should Be Made Up Of Hpdc Aluminium Black Powder Coated.4 Seat Depth Adjustment: Seat Depth Adjustment Should Be Integrated In The Seat Through A Sliding Mechanism. Seat Depth Adjustment Range Should Be Of 6.0±0.5 Cm. Adjustable Back Support: Back Frame Should Be Connected To The Up/Dn Mechanism Housed In Plastic T Spine. It Can Be Adjusted In The Range Of 7.42±0.5 Cm For The Comfortable Back Support To Suit Individual Need.Pneumatic Ht. Adjustment: The Pneumatic Height Adjustment Has Anadjustment Stroke Of 10.0±0.3 Cm.Pedestal Assembly The Pedestal Should Be High Pressure Die Cast Polished Aluminium And Fitted With 5 Nos. Twin Wheel Castors. The Pedestal Should Be 65.0 ± 0.5Cm. Pitch-Center Dia.(75.0 ± 1.0Cm. With Castors.)Twin Wheel Castors:The Twin Wheel Castors Should Be Injection Moulded In Black Polypropylene. Overall Dimensions Of Chair Seat Height -44.5 To 54.5 Cm. Height -114-131.5 Cm. Width & Depth Of Chair As Measured From Base - Width-76.1 Cm And Depth-66.5 Cm , Supply Ofgodrej - La Sede Visitor Chair[ Conference - 20 ] As Per Following Specifications. Seat/Back Assembly : The Cushioned Seat Should Be Made Of Injection Molded Plastic Outer & Inner.Plastic Inner Should Be Upholstered With Pure Leather And Moulded High Resilience (Hr) Polyurethane Foam Of Density 45±2 Kg/M3,And Hardness Load 16 ± 2 Kgf For 25% Compression.The Cushioned Back Should Be Made Of Pu Foam With Insitu Molded Ms E.R.W Round Tube Of Size 1.9±0.03Cm X 0.16 ±0.0128Cm. It Upholstered With Pure Leather. Seat Size : 47.6 Cm. (W) X 49.2 Cm. (D)Back Size : 46.5 Cm. (W) X 59.5 Cm. (D)Visitor Tubular Frame: The Tubular Frame Should Be Cantilever Type And Made Of Ø2.54± 0.03 Cm X 0.02 ± 0.016Cm Thick Ss 202 Tube. The Back Should Be Connected To Frame Through Chrome Plated High Pressure Die Case Connector Piece.Overall Dimensions Of Chair Seat Height -46.2 Cm. Height -98.2 Cm. Width & Depth Of Chair As Measured From Base - Width-60.9 Cm And Depth-64.7 Cm , Supplying, Fabricating And Placing In Position High Strength Deformedsteel Bar Reinforcement Of Grade Fe500 For Rcc Work, Straightening,Cleaning, Decoiling, Cutting, Bending To Required Shapes And Lengths Asper Details, Binding With Contractors Own 16 Standard Wire Gauge(Swg)Black Soft Annealed Binding Wire At Every Intersection, Supplying Andplacing With Proper Cover Blocks, Supports, Overlaps, Chairs, Spacers,Lifting Hooks Etc For All Heights & Depths Etc. All Complete As Directedby Engineer-In-Charge. , Manufacturing, Transporting, Supplying And Erecting In Position Rccprecast Elements Of Nominal Mix 1:1.5:3 (1 Cement:1.5 M Sand: 3 Stone Aggregates Of 20Mm And Down Size Graded Crushed Stone Aggregates As Per Is:456-2000 Using Ordinary Portland Cement (Opc) 53 Grade For All Leads, Levels, Shapes And Thicknessincluding All Moulds, Shuttering And Centering, Vibrating, Tamping,Curing, Chamfering, Wherever Required, Finishing The Top Surface Withcement Mortar 1:3( 1 Cement : 3 Msand) To Give A Smooth And Evensurface Or Non Skid Finish As Specified, Providing Lifitng Hooks, Metalinserts, Making Holes Pockets, (Only M.S. Inserts To Be Measured & Paidseperately) Transporting To Site, Erecting, Levelling, Aligning Andfixing In Position All Complete (Excluding Cost Of Reinforcement) Andas Directed By The Engineer-In-Charge. , Providing And Applying Approved Epoxy Resin Of Fosroc Or Approved Equivalent For Bonding Of Fresh Concrete To Old Concrete In All Types Of Structures At All Depths And Heights Including Cleaning Of Concretesurfaces, Removing Of All Loose Concrete Pieces, Making Rough Bychiselling, Taking Off The Skin Of Concrete, Application Of Epoxy Resin System As Per Manufactures Recommendations Taking All Safety Measures,Etc.Complete As Specified And Directed By Engineer-In-Charge. , Repairs To Existing Rcc Beams, Columns & Slab Including Chipping And Dismantling & Removing Of Loose Particles Applying Cement Paste, Rakingout Joints, Applying Epoxy Resin Rakingout Joints, Applying Epoxy Resin For Bonding Fresh Cocrete To Oldconcerete, Filling Void Portion With Concrete 1:1:5:3 Concrete(1Cement:1.5 M Sand :3 Stone Aggregates 12Mm Size) Making Good As Same,Including Formwork, Curing, Staging, Working Platforms Labours, Tool Andtackles All Complete As Per S Pecifications And Directions Of Engineer-In-Charge. , Entrance Lobby And Staircase Areas , Civil Work , Dismantling Of Mosaic In Staircaselaid In Cement Mortar (Taking All Necessary Safety Precautions)Manually / By Mechanical Means Including Necessarytools And Tackles, Propping, Underpinning, Cleaning The Siteand Disposal Of Unserviceable Materialatdesignated Place Inside The Refinery Premises As Per Specification And Directions Of Engineer-In-Charge. ( Refer Drawings Sheet No : 1 ) , Taking Of Tile Work In Floors And Skirtinglaid In Cement Mortar For Thickness Upto 25Mm (Taking All Necessary Safety Precautions)Manually / By Mechanical Means Including Necessarytools And Tackles, Propping, Underpinning, Cleaning The Siteand Disposal Of Unserviceable Materialatdesignated Place Inside The Refinery Premises As Per Specification And Directions Of Engineer-In-Charge. , Dismantling Of False Ceiling And Wall Panelling With Frame Workof Any Description(Taking All Necessary Safety Precautions) For All Heights Above Floor Level Including Hire Charges For Tools & Tackles, Providing Necessary Scaffolding, Propping, Underpinning, Temporary Supports Etc. ,As Per The Instruction Of Engineer-In-Charge, Cleaning And Stacking Of Serviceable Material Like Aluminium Frames At Destined Location /Cpcl Storage Yardwithin The Refinery Area And Disposal Of Un Serviceable Material Atdesignated Place Inside The Refinery Premises As Per Specification And Directions Of Engineer-In-Charge. , Dismantling Of Windows & Doorswith Frame, Shutterschowkhats, Architrave, Holdfasts Grill ,Etc. All Complete Including Hire Charges For All Tools & Tackles Required For Carrying Out Dismantling,Stacking Material, Transporting, Loading & Unloading And Handing Overto Scrap Yard/Stores Within Refinery Premisesas Specified And Directed By The Engineer-In-Charge And Disposal Of Unserviceable Material Atdesignated Placeinside The Refinery Premises.( Refer Drawings Sheet No : 2 ) , Dismantling Of Wooden Handrail & Ss Balustade And Making The Side Plaster Surface Neat & Clean & Disposal Of Unserviceable Materialatdesignated Place Inside The Refinery Premises As Per Specification And Directions Of Engineer-In-Charge. , Providing, Erection & Dismantling Of Scaffolding For All Heights: Job Involves Erection Of Scaffolding At The Required Locations Using 1-1/2 Inch Dia Steel Tubular Pipes With Suitable Clamping Arrangement ,Providing Steel Gratings, Access Staircase System At Required Locations Firmly Tied On To The Scaffolding Pipes, Removal Of The Steel Gratings & Scaffolding Materials On Completion Of The Job. The Job Shall Be Carried-Out As Per Cpcl Scaffolding Procedure. The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, All Consumables And Labour To Complete The Job In All Respects, Supply & Transportation Of Steel Scaffolding Materials & Steel Gratings To The Work Site Etc. Complete As Per Directions And Approval Of Engineer-In-Charge. The Payment Will Be Made Once Irrespective Of Duration Of Scaffolding. , Repair Of Existing Walls & Ceiling Plasters Of Varying Thickness Of 12Mm To 20Mm Including Cutting The Patch In Proper Shape, Raking Out Joints, Preparing And Plastering The Surface Of The Walls And Ceilings Complete Including Disposal Of Rubbish To The Designated Place Within The Refinery Premises With Cement Mortar 1:4 (1 Cement : 4 Fine Aggregate). Rate Inclusive Of Chipping And Scaffolding. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Providing & Laying Cement Concrete Screed Using Machine Trowel Of Mix 1:1.5:3 (1 Cement : 1.5 M Sand: 3 Coarse Aggregates 12.5Mm And Down Graded Aggregates) Using 53 Grade Opc Inboard Room & Inclusive Of Curing/Pond Curing, Brooming With Wire Brush, Finishingetc.All Labours, Tools And Tackles Complete As Per Drawing, Specification & As Directed By Engineer In Charge. , Providing And Laying Brick Masonry In Super Structureabove Ffl Level Using Cement Mortar 1:5 (1 Cement:5 Coarse Sand)For Allheightsincluding The Cost Of Materials, Labour,Tools And Tackles, Scaffolding/Staging, Sampling And Testing, Soaking Of Bricks, Cutting And Laying Of Bricks, Providing Recesses, Making Openings Of Any Shape And Size,Embedding The Fittings,Curing, Etc. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Providing 15Mm Thick Cement Plaster In Cement Mortar 1:4 (1Cement:4 M Sand) Onbrick Masonry, Pcc/Rcc Surfaces Including Preparation Of Base, Cleaning, Chipping, Hacking Of Existing Plaster, Scaffolding If Required, Finishing, Curingincludingmouldings And Providing Grooves In Plaster, Etc. As Specifiedfor All Depths And Heights Including Labour Charges,Tools And Tackles,Material Costs Etc. As Per Specifications And Asdirected By The Engineer-In-Charge. , Providing 6Mm Thick Cement Plaster In Cement Mortar 1:3 (1Cement:3 M Sand By Volume) On Roof Ceilings, Concretesurfaces Including Preparation Of Base, Cleaning, Chipping,Hacking Of Existing Plaster, Packing Of Electrical Works,Scaffolding, Finishing, Curing Etc.For All Heights Complete With All Labour Charges,Material Costs,Tools And Tackles Etc.As Per Specifications And As Directed By The Engineer-In-Charge. , Flooring Tiles , Providing And Laying Of Premium Quality Glazed Vitrified Tiles Of Size 800X800mm / 600X1200mm Of Kajaria/Somany/Johnson- Shade, Size As Approved By Architect Or E-In-C,Glossy Finish, Decorative Type Of Tiles, Approved Make With Bed Of 20Mm Thick Cement Mortar 1:3 In Line And Level Including Cleaning The Finished Surfaces With Oxalic Acid Including Skirting Out The Joints, Flush Pointing Of Joints Of Tiles With Cement Paste/Grout Mixed With Colour Pigments Matching The Shade Of Tiles,4Skirting All Around As Per Drawing ,Along With Material Costs ,Tools And Tackles, Labour Charges Etc.As Per Specifications, Standards And Instructions Of Engineer-In-Charge As Per Drawing. (Refer Drawings Sheet No: 1) , Providing And Fixing 18Mm Thick Machine Cut, Mirror Polished, Premoulded And Pre-Polished Machine Cut Tanbrown Granite For Staircase (& Lapotra Finish For Staircase Treads Only)Of Approved Qualitywith Full Bull Nose Edge Polishing Etc.Of Required Size Ofcolour/Shade As Approved By E-In-C, Laid 20Mm Thick Base Cement Mortar 1:4 (1 Cement:4 M Sand) With Joints Treated With White Cement, Mixed With Matching Pigment, Epoxy Touch Ups, Including Machine Polishing To Edge To Give High Gloss Finish, Providing Machine Cut Opening As Per Requirement Etc., Rubbing, Curing, Moulding & Full Bull Nose Edge Polishing Etc. Complete At All Levels As Directed By Engineer-In-Charge.(Refer Drawings Sheet No:1 ) Work Includes Plastering And Touching Up The Side Surfaces Of Waist Slab And Finishing The Surfaces Neatly . , False Ceiling , Providing And Fixing Suspended12.5Mm Gypboard Plain Panel Ceiling Including Gypserra Perimeter Channelis Fixed Along The Perimeter Of Existing Wall/ Partition With The Help Of Hilti Hps - 1 (6X40) Impact Anchor, At 600Mm Centres.Gypserra Ceiling Angleis Suspended By Fixing It To The Gyproc Soffit Cleat And Or Gyproc Rawl Plug-8X45mm Creating 1220Mm X 1220Mm Grid.Gypserra Intermediate Channelis Fixed To The Gypserra Ceiiing Angle With M6 X 12Mm Hex Bolt & Hex Nut Arrangement Or With 2 Nos Of Ø4.2X13 Gyproc Metal To Metal Screw. The Gypserra Ceiling Sectionis Then Fixed To The Gypserra Intermediate Channelwith The Help Of Gyproc Connecting Clipand In Direction Perpendicular To The Intermediate Channel At 457Mm C/C. Single Layer Of 12.5Mm Tapered Edge Gypboard Plain Tile (Conforming To Is 2095 Part 1 : 2011) Is Then Screw Fixed To Ceiling Section With 25Mm Drywall Screwsat230mm Centres On Ceiling Section And 150Mm At Periphery Of Ceiling.Finally Square And Tapered Edges Of The Boards Are To Be Jointed And Finished So As To Have A Flush Look Which Includes Filling And Finishing With Jointing Compound & Joint Paper Tape.The Work Is To Be Executed All Complete At All Different Elevations Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Providing And Fixing Of Wooden False Ceiling Above Reception Counter With 18 Mm Thick Bwp Plywood Withwalnut Veneer Of Greenply/Century/Archidply On Exposed Side Which Is Screwed With Wooden Framework Using Country Wood Of Size 50Mmx50mm. All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade,Colour,Texture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Providingand Fixing Of Wooden False Ceiling Above Reception Counter With 100Mm X 12Mm Bwp Plywood Battern With 4Mm Thk Ost And 6Mm Thk Teak Wood Perimetrebeading On Both The Ends And Screwing It To The 6Mm Bwp Plywood Which Is Screwed With Wooden Framework Using Country Wood Of Size 50Mmx50mmwith All Complete Including Material Costs,Labour Costs ,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade,Colour,Tecture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. ( Refer Drawings Sheet No : 23-26 ) , Wall Paneling , Providing Wall Panelling On Existing Brick Wall With 25Mm X 50 Mm X2mm(0.767Kg/M)Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Of 8 Mm Thick Bwp Plywood By Screwing To The Aluminium Framework And Providingwalnut Veneer Of Greenply/Century/Archidplyon Exposed Side By Pasting To The Plywood With Approved Quality Antitermite Chemical Solution On Concealed Surfaces With All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade,Colour,Texture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 8 - 11) , Providing Wall Panelling With 5Mm Thickwhite Coloured Saint Gobain Glass Pasted To The 8Mm Thk Bwp Plywood Using Silicon Sealant And 3M Double Sided Tapeas Shown In The Drawing Which Is Screwed To Aluminion Framework Made Of 25Mm X 50 Mm X2mm(0.767Kg/M)Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps Over The Brick Wall With Approved Quality Antitermite Chemical Solution On Concealed Surfaces. All Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Sheet No : 4 - 7) ( Rate To Be Quoted Based On The Actual Glass Sizes To Be Fixed At Site Including Wastages ) (Refer Drawings Sheet No : 8 - 11) , Providing Wall Panelling Behind Reception Table On Existing Brick Wall With 25Mm X 50 Mm X2mm(0.767Kg/M)Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Of 100Mm X 12Mm Bwp Plywood Battens With 4Mm Thk Ost And 4Mm Thk Beading On Both The Ends And Screwing It To The8 Mm Bwp Plywood Which Is Screwed To The Aluminium Framework With Approved Quality Antitermite Chemical Solution On Concealed Surfaces All Complete Including Material Costs ,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade,Colour,Texture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 8 - 11) , Providing Wall Panelling Near Staircase Area On Existing Brick Wall With 25Mm X 50 Mm X2mm(0.767Kg/M) Aluminum Hollow Sections At Not More Than575 Mm C/C On Either Direction With Necessary Clamps And Fixing Europratik Louvers Or Its Equvt. To 8 Mm Thick Bwp Plywood Which Is Screwing To The Aluminium Framework With Approved Quality Antitermite Chemical Solution On Concealed Surfacesall Complete Including Material Costs,Labour Costs,Tools And Tackles Etc. All Complete As Directed By Engineer In Charge.The Shade,Colour,Tecture Of Veneer Shall Be As Approved Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 16 - 18) , Panelling On The Jambs Of Patch Fitting Glass Door Using 12Mm Thk Bwp Plywood With 4 Mm Thick Veneer Of Greenply/Century/Archidply With Lipping All As Shown In The Drawing Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Refurbishing The Partition Below Staircase Landing By Removing The Existing Laminate And Replacing With New Laminate Over The Existing Surface After Making The Surface Level Neat & Clean & Pasting With Necessary Sr / Fevicol. , Door, Upvc Windows, Upvc Doors, Upvc Ventilators , Providing And Fixing In Position Upvc Sliding Window Of Venesta(No. Of Panels As Approved ,With G.I , Member 1.5 Mmwhite In Colour Including All Fixtures, Fastenings, Handle With Flush Lock, Epdm Gaskets, Wool Pile Etc., Making Recesses In Brick/Concrete Surfaces And Making Good The Same After Fixing Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 1) , Providing And Fixing In Position Fixed Glazing Upvc Windows Of Venesta (With Clear 5Mm Thick Glass Double Glazing), White In Colour Including All Fixtures, Fastenings, Etc. Making Recesses In Brick/Concrete Surfaces And Making Good The Same After Fixing All Complete As Per Directions Of Engineer-In-Charge. (Refer Drawings Sheet No : 1) , Providing And Fixing Isi Marked,Double Leaf 30Mm Thick Bwp Flush Door Shutters Of Greenply/Century/Archidplydecorative Type, Consisting Of Solid Core Block Board Bonded With Phenol Formaldehyde Synthetic Resin And With 4Mm Thick Veneer Of Greenply/Century/Archidply Facing Both Sides With 1St Class Teak Wood Lipping On All Edges. The Center Part Should Be Removed As Mentioned In Drawing And Should Be Fixed With 8Mm Thk Bwp Plywood With 4Mm Thk Walnut Veneer On Both Sides Andproviding 6Mm Thick Teakwood Perimeter Beading Fixed By Means Of Approved Quality Neoprene Based Adhesive And Nailing @ 300Mm Max., Providing And Fixing 125Mm Long Stainless Steel Butt Hinges [For Each Shutter (Vertical Spacing Not Exceeding 600Mm) ] Including Providing Wooden Filler/Sealer, Stainless Steel Lock, Door Bush, Finishing Etc . Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 13) , Providing And Fixingsecond Class Teak Wooden Frames150mmx60mm,For Doors For All Heights Including All Labours, Tools, Tackles, Cutting, Shaping, Jointing,Applying 2 Coats Of Wood Primer Mixed With Approved Quality Antitermite Chemical Solution On Concealed Surfaces, Fixing In Masonry/Rcc By Means Of 300Mm X 25Mm X 6Mm Thick M.S. Hold Fasts Screwed To Frame @ 600Mm Max Vertically And Grouted With 1:2:4Concrete By Volume In Min. 350Mm X 100Mmx100mm Sized Hole Made In Masonry/96Mm Long, 12Mm Dia M.S. Dash Fastner Etc. All Complete As Dirercted By Engineer-In-Charge. , Providing And Fixing Frameless Glass Door Of Size 1.8M X 2.1M Using 10Mm Thick Clear Toughened Glass With Patch And Other Fittings Of Dormakaba Make Including Cutting, Making Holes, Cutouts In The Glass Of Required Shape And Size To Accommodate Fittings And Fixing The Fittings In Floors, Soffits, Jambs Including Necessary Screws, Fixtures, Sealants Wherever Required And Ss Cover Over Patch Fittings Etc., All Complete As Per Particular Specification (Refer Drawings Sheet No : 8 - 9) , Providing And Fixing Fixed Glass Partitons On Either Side Of Frameless Glass Door To A Height Of 2.55M Using 10 Mm Thick Toughened Glass With Ulpt 90/ Ulpt 92 Patch Fittings Of Dormakaba Make At The Top And Aluminium Channel At The Bottom. Cost To Include, Cost Of Glass Including Making Holes, Cut Outs And Applying Sealants All Complete.(Refer Drawings Sheet No : 8 - 9) , Providing And Fixingaluminium Extruded Section Body Tubular Type Universal Hydraulic Door Closer Of Dormakaba Make With Double Speed Adjustment With Necessaryaccessories And Screws With All Labour Charges,Tools & Tackles Etc. Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge , Providing And Fixing Bright Finished Cp Brass 100Mm Mortice Handle With Lock Of Godrej Make Of Model As Approved By Eic,Isi Marked With Four Levers And A Pair Of Polished Stainless Steel Decorative Handles (Size Of Handles To Match The Door Size) With Necessary Screws Etc.Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge , Cabinets , Providing & Fixingreceptiontable Of Size 2.43M X 0.60M X 1.00M Made Out Of18mmthk Bwp Plywood With Veneer Of Greenply/Century/Archidply Finished On Exposed Surface On Shown In Drawings With Pu Coating ( Polyurethane) Semi Matt Finish Partially And Nano White Stone Partially On Exposed Sidesand 1Mm White Laminate Inside With Rehau Tape Of Walnut Shadewith 18Mm Thk Nano Whitestone Counter Top. The Cabinet Shutters Should Be Fitted Butterflyhinges , The Drawer Channels, Keyboard Channelsof Ebco Make With Screws And Nails Complete Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge(Refer Drawings Sheet No : 20) , Providing & Fixing Storage Cabinet Of Size2.10Mx0.3M X 3.43M Made Out Of 18Mm Thkbwpplywood With Walnut Veneer Of Greenply/Century/Archidply Finished With Pu Coating ( Polyurethane) Semi Matt Finish. The Cabinet Shutter Should Be Fitted With Butterfly Hinges And Chromium Plated Angle.Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. (Refer Drawings Sheet No : 22) , Special Elements , Entrance Decorative Special Table Of Size 1.50M X 0.45M Made Out Of Sshollow Box Section Of Size 75X25 Mm(304 Grade) Of Required Thicknessbend To Shape In Cnc , Welded And Polished Neatly And Thetable Top Provided With 12Mm Thick Saint Gobin White Coloured Glassas Approved By Engineer-In-Charge. (Refer Drawings Sheet No : 19) , Providing And Fixingaluminium Ripple Fold Concealed Curtain Track With Necessary Plastic Hooks And Wheels As Required, Screwed To The 18Mm Thk Bwp Plywood Box Section Which Is Srewed To The Side Wall / Lintel. The Work Is To Be Executed All Completeincluding Material Costs,Labour ,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providing And Fixing Satin Fabric Curtains ( Should Absorb Sound And Blackout The Light ). It Should Be Installed In A Ripple Fold Pattern. The Measurement Of The Curtain Is Based On The Width Of The Track And The Total Height Is From Floor Level.The Work Is To Be Executed All Complete Including Material Costs,Labour,Tools And Tackles Complete All As Per Trade Practice And As Directed Byarchitect/ Consultant /Engineer In Charge. , Providing And Fixing Roller Blind With 100% Polyester Blackout Fabric ,Colour Coated With Acrylic And Control Unit With Clutch Mechanism,Idler ,Operating Chain,Galvanized M.S.Bracket With Powder Coated Bracket ,Spring Steel Clamp , Extruded Aluminum Channel Powder Coated In White Load Bar,Aluminum Extruded Grooved Tube –Anodized & Covered With Matching Fabric,Fabric Roller Tube All Complete As Directed By Engineer-In-Charge.The Colour And Pattern To Be Decided Jointly With Eic. (Refer Sheet No : 18) , Providingandapplying Two Coats Ofinterior Royal Emulsion Paintwithasian Paint Or Approved Equivalent Make Of Any Shades/Colours Asper The Specifications And Including A Priming Coat With Cement Primer Of Approved Brand Of The Same And Appling One Coat Of Wall Putty, For Roof Ceiling/ Rafters/Walls/Wall Panelling/Ceiling, And Drywall Partition Withnecessaryscaffolding And Surface Preparation, Sand Papering, Scrapping & Removing Old Loose Paint Films, Filling All Holes And Depressions, Etc., Complete As Per Specification And As Directed By Engineer-In-Charge.Note-In Case Of Painting In Existing Walls Entire Wall Is To Be Cleaned And Putty To Be Applied Before Painting. , Supply And Fixing Of Ss Handrail By Using Ss Pipe 50Mm Dia 16 Swg 304 Grade At Top And Vertical 40 X 40 Squaress Pipe (Spacing?) 304 Grade (M/S. Jindal Or Any Other Specific Make?) And Intermediate Horizontal Pipes Are 20Mm Dia (20 Mm X3 Nos?)Ss 304 Grade With Necessary Base Plate And Anchor Fastners. (Refer Drawings Sheet No : 15) , Preparation Of New Wood Surfacesby Applying Filler Coat,Staining Varnish Polish To Veneer/ Wooden Surfaces Of Shade And Colour As Approved By E-In-C And Applying One Layer Spray Coat Of Pu Coat( Polyurethane Coating) Semi Matt Finish Including All Labour Charges ,Material Charges Etc. All Complete As Directed By Engineer-In-Charge , Providing And Fixing Decorative Charcoal Sheets Of Size Mentioned In Drawing Of 12Mm Thickness Of Euro Pratik Make Or Its Approved Equivalent,Fixed &Pasted Using Fevicol Srand Heatx Over 12Mm Thk Plywood Which Is Screwed To The Wall In Locations As Specified By Eic ,All Complete Including Material Costs,Tools And Tackles,Labour Charges Etc. (Refer Drawings Sheet No : 16 -17 ) , Furniture , Supply Of Godrej -Pisa 2 Seater Sofa Or Approved Equivalent Brand And Shade Appproved By Eic As Per Following Specifications.Seat Foam: The Seat Should Be Made Of Pu Foam With Density 32 ± 2 Kg/Cu.Mtr Having An Additional Toplayer Of J Pu Foam With Density 28 ± 2 Kg/Cu. Seat Should Be Upholstered With Fabric Or Leatherette. 2) Back Foam: The Back Should Be Made Of Pu Foam With Density 28 ± 2 Kg/Cu. Mtr With Two Additional Top Layer Of Supersoft Foam Of Density 23±2 Kg/Cu. Mtr, Upholstered With Fabric Or Leatherette Understructre Understructure Should Be Made Up Of 1.2±0.1 Cm. Thick Hot Pressed Plywood Ocp-Qltapl14- 18 4. Dia 4Mm Zigzag Spring Assembly Should Be Mounted In Understructure For Support And Additional Cushioning Purpose Leg Assembly: It Should Be A Welded Assembly Made In Stainless Steel (Grade Ss 202) Tube & Plate.Width (W): 146.0 Cm. Depth (D): 92.0 Cm. Height (H): 82.0 Cm. Seat Height (Sh): 45.0 Cm. , Supply Of Godrej -Pisa 1 Seater Sofaas Per Following Specifications. Seat Foam: The Seat Should Be Made Of Pu Foam With Density 32 ± 2 Kg/Cu.Mtr Having An Additional Toplayer Of J Pu Foam With Density 28 ± 2 Kg/Cu. Seat Should Be Upholstered With Fabric Or Leatherette. 2) Back Foam: The Back Should Be Made Of Pu Foam With Density 28 ± 2 Kg/Cu. Mtr With Two Additional Top Layer Of Supersoft Foam Of Density 23±2 Kg/Cu. Mtr, Upholstered With Fabric Or Leatherette Understructre Understructure Should Be Made Up Of 1.2±0.1 Cm. Thick Hot Pressed Plywood Ocp-Qltapl14- 18 4. Dia 4Mm Zigzag Spring Assembly Should Be Mounted In Understructure For Support And Additional Cushioning Purpose Leg Assembly: It Should Be A Welded Assembly Made In Stainless Steel (Grade Ss 202) Tube & Plate.Width (W): 146.0 Cm. Depth (D): 92.0 Cm. Height (H): 82.0 Cm. Seat Height (Sh): 45.0 Cm. , Supply Of Pisa Side Table As Per Following Specifications. Should Be A Center Table Glass : It Should Be 12 ±0.3 Mm Thick Black Tinted Toughened Glass Uv Glued With Bushes Made In Ss 202 Grade For Fixing With Understructure. Pshould Be A Center Table Understructure : It Should Be A Welded Assembly Made In Ss202 Grade Having Dia. 12±0.04 As Per Should Be :1762. Width Of Table= 60.0 Cm, Depth=60.0 Cm, Height=35.1 Cm.. , Supply Ofgodrej - La Sede High Back Chair[ Conference - 1 ]As Per Following Specifications. Seat/Back Assembly : The Cushioned Seat Should Be Made Of Injection Molded Plastic Outer & Inner.Plastic Inner Should Be Upholstered With Pure Leather And Moulded High Resilience (Hr) Polyurethane Foam Of Density 45±2 Kg/M3,And Hardness Load 16 ± 2 Kgf For 25% Compression.The Cushioned Backshould Be Made Of Pu Foam With Insitu Molded Ms E.R.W Round Tube Of Size 1.9±0.03Cm X 0.16 ±0.0128Cm. It Upholstered With Pure Leather. Seat Size : 47.6 Cm. (W) X 49.2 Cm. (D)Back Size : 47.5 Cm. (W) X 77 Cm. (D) Armrests: The Armrest Top Should Be Moulded From Polyurethane(Pu), Upholstered In Pure Leather And Mounted On To A Drop Lift Adjustable Type Tubular Armrest Support Made Of 03.81±0.03Cm X 0.2±0.01 Cm Thk M.S E.R.W Tube Having Chrome Plated Finish.The Armrest Height Adjustable Up To 6.5±0.5Cm In 5 Stepsactive Bio-Synchro Mechanism: The Adjustable Tilting Mechanism Should Be Designed With The Following Features:• 360° Revolving Type.• Front-Pivot For Tilt With Feet Resting On Ground And Continuous Lumbar Support Ensuring More Comfort.• Tilt Tension Adjustment Can Be Operated In Seating Position.• 5-Position Tilt Limiter Giving Option Of Variable Tilt Angle To The Chair.• Seat/Back Tilting Ratio Of 1: 2• The Mechanism Housing Should Be Made Up Of Hpdc Aluminium Black Powder Coated.4 Seat Depth Adjustment: Seat Depth Adjustment Should Be Integrated In The Seat Through A Sliding Mechanism. Seat Depth Adjustment Range Should Be Of 6.0±0.5 Cm. Adjustable Back Support: Back Frame Should Be Connected To The Up/Dn Mechanism Housed In Plastic T Spine. It Can Be Adjusted In The Range Of 7.42±0.5 Cm For The Comfortable Back Support To Suit Individual Need.Pneumatic Ht. Adjustment: The Pneumatic Height Adjustment Has Anadjustment Stroke Of 10.0±0.3 Cm.Pedestal Assembly The Pedestal Should Be High Pressure Die Cast Polished Aluminium And Fitted With 5 Nos. Twin Wheel Castors. The Pedestal Should Be 65.0 ± 0.5Cm. Pitch-Center Dia.(75.0 ± 1.0Cm. With Castors.)Twin Wheel Castors:The Twin Wheel Castors Should Be Injection Moulded In Black Polypropylene. Overall Dimensions Of Chair Seat Height -44.5 To 54.5 Cm. Height -114-131.5 Cm. Width & Depth Of Chair As Measured From Base - Width-76.1 Cm And Depth-66.5 Cm , Board Room And Lobby Modification , Electricalworks For Entrance Lobby , Supply Of Metal Glad Plug And Socket, Single Phase, Neutral And Earth (Industrial Type) , Supply, Installation, Testing And Commissioning Of Single Phase 3 Pin Socket Type To Connect The 3 Tone A/C Unit At Board Room At Entrance Respectively. , Supply Of 32 A 1 Ph Ip 66 Protected Industrial Type Socket Above Falls Ceiling On The Surface Or Flush With Wall As Per The Site Requirements. , Supply, Installation, Testing And Commissioning Of 32 Dp Mcb Control Box For Controlling The A/C 3 Tone Unit In A Suitable Enclosure At Table Top Level On The Surface Or Flush With Wall As Per The Site Requirements. , Supply Of Sockets , The Scope Of Work Includes Supply Of The Below Mentioned Sockets As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Supply, Erection, Testing And Commissioning Of 1 No. 16A/6A Socket Outlet Controlled By 1 No. 16A Switch , Supply, Erection, Testing And Commissioning Of 1 No. 6A Socket Controlled By 1 No 6A Switch (Board Socket). , 2 Nos 6A Malty Utility 5 Pin Sockets Controlled By 1 No.6A Switch For Computer Power Points Long The Patrician Wall Of The Cabin Or On The Wall On Surface Or Flush With Surface. , Switch Boards For Controlling Light Points , One No 6A Switch Controlling One Light Point , One No 6 A Switch Controlling 2 Points , One No 6 A Switch Controlling 3 Points , One No 6 A Switch Controlling 8 Points , Two Way Controlled Light Point Switch , Installation Of Conduit , The Scope Of Work Includes Installation And Laying Of Conduits In Concealed Or Surface Mounted For Circuit/Main/Telephone/Video Conferencing/Data Wiring With Clamps, Saddles, Pull Boxes And All Other Conduit Accessories As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Installation Of 32 Mm Pvc Conduit , Installation Of 25 Mm Pvc Conduit , Installation Of 20Mm Conduit , Supply Of Data Wiring , The Scope Of Work Includes Supply, Fixing And Connection Of Modular Type Of Anchor Make (Roma) Or Approved Equivalent Rj-45 Computer Socket Cat-6 With Shutter, Metal Box And Cover Plate, Complete With Labour And Materials As Per Direction Of The Engineer-In-Charge. , Cat-6 Cabling: , The Scope Of Work Includes Supply And Laying Of 4 Pair Cat-6 Type Cable In Pvc Pipe/Casing Caping With All Necessary Accessories For Computer Networking, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Only Isi Marked Wires Of Make Finolex/Polycab/Havells/Kei/Rpg/V-Guard Shall Be Used. , Telephone Systems , The Scope Of Work Includes Supply And Laying Of 2 Pair,0.5/0.9 Mm Annealed Unarmoured Telephone Cable Laid In Already Installed Pvc Conduits With All Necessary Accessories From The Telephone Jb To Officer’S Table, All Complete With Labour And Materials, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , The Scope Of Work Includes Supply And Fixing Of Telephone Rj 11 Jack With Shutter In Gi Box Along With Modular Base And Cover Plate, Concealed In Wall / Partition, All Complete With Labour And Materials, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. The Make Shall Be Anchor Or Equivalent. , Supply And Erection Of Point Wiring Material , The Scope Of Work Includes Supply Of Concealed/Surface Point Wiring Using 660V/1.1Kv Grade Copper Conductor Pvc Insulated Frls Copper Wires (With Proper R, Y, B Colour Code), As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , 3 R Of 2.5 Sq. Mm Cu Conductor Wire (Circuit Mains) , 3 R Of 1.5 Sq. Mm Cu Conductor Wire (Point Wiring) , 3 R Of 2.5 Sq. Mm Cu Conductor Wire (6A Power Sockets) , Power Point Wiring With The Following Size Of Wires. , 2 R Of 6 Sq.Mm Cu Conductor Wire With 1R Of 2.5 Sq. Mm Cu Wires. (For A/C 3 Tone Unit) , 2 R Of 4 Sq.Mm Cu Conductor Wire With 1R Of 2.5 Sq. Mm Cu Wires. (For 16 A Power Plus) , Junction Boxes. , Suitable Size Junction Boxes To Terminate Power Wiring Cable, Which In Turn Should Be Enable To Take The Pipe Along With Wires In To The Patrician Walls And Other Area Where Wiring In Done In A Concealed Pattern.Size 200Mm X 50 Mm , Supply Of Electrical Fixtures , The Scope Of Work Includes Supply Of Following Light Fixtures Including Necessary Hardware Such As Clamps, Nuts, Bolts, Screws, Nails, Suspension Rods And Materials Required For Terminations, Interconnections, Earthing From Terminal Block/Ceiling Rose To Light Fitting, As Per Specifications Of This Tender And Directions Of Engineer-In-Charge. , 10 W Aura Style Edge Nw (Philips Make) , 20W 4 Feet Led Batten Ww (Philips Make) , 10 W 2 Feet Led Batten (Philips Make) , 12W Durasternsquare Nw , Beacon Pendent Model No. 58074 , 3 Watts Altra Spot Tilt Ww , Electricalworksfor Board Room , Supply Of Distribution Boards , Supply Of Auto Sources Change Over Switch To Have One Source At All Time Without Failure. , Fabrication And Supply Of Ats Switch Of 63A 4P Socomec Switch With The Following: , Supply, Installation, Testing And Commissioning Of Floor Power Distribution Boards With The Following Incoming And Out Goings: Indicating Lamps To Indicate Which Source Is In Operation. Phase Indication Lamp 3 Nos. With Control Fuses. 1 No. Of 63A 4P Mcb And 1 Nos. Of 40A 4P Mcb Isolators To Feed These Supply To Ac Pdb And Pdb Respectively.These Arrangement Shall Be Made In A Single Enclosure Made Of 14G Ms Sheet, With Necessary Bus Bars Interconections And Cable Adotor Boxes To Enable The Incoming And Out Goings. , Fabrication And Supply Of Ats Switch Of 63A 4P Socomec Switch With The Following: (For Ldb) , Supply, Installation, Testing And Commissioning Of Floor Lighting Distribution Boards With The Following Requirements:Indicating Lamps To Indicate Which Source Is In Operation. Phase Indication Lamp 3 Nos. With Control Fuses. These Arrangement Shall Be Made In A Single Enclosure Made Of 14G Ms Sheet, With Necessary Bus Bars Interconections And Cable Adotor Boxes To Enable The Incoming And Out Goings. , Pdb - I (Main): , The Scope Of Work Includes Supply Of Pre-Fabricated, Pre Wired Db’S Provided With Insulated Phase Busbars, Neutral Busbar With Shrouds, Earth Busbar With Colour Coded Interconnecting Wires, Blank Plates, Circuit Identification Tags, Double Door With Ip43 (Industrial Type) Vertical Type 4 Way Tpn Mcb Db(Pdb) Consisting Of Following, , Incomer: 63 A Fp Mccb , Outgoings: 8 Nos 32 A Sp Mcbs , To Feed Power Supply To 3 Nos. 3 Tone A/Cs Powers At Board Room And 2 Nos 3 Tone A/Cs At Entrance Lobby. 3 Nos. 32A Sp Mcbs Remains Spare. , Db Shall Have Top Cable Adopter Box With Necessary Fixing Accessories Etc., To Enable Termination Of Incoming Cable And Outgoing Wires, And Shall Be As Per Is Standards And Directions Of Engineer-In-Charge. , Pdb - Ii: , The Scope Of Work Includes Supply Of Pre-Fabricated, Pre Wired Db’S Provided With Insulated Phase Busbars, Neutral Busbar With Shrouds, Earth Busbar With Colour Coded Interconnecting Wires, Blanking Plates, Circuit Identification Tags, Double Door With Ip43 (Industrial Type) 7 Segment 8-Way Tpn Mcb Db(Pdb) Consisting Of Following: , Incomer: 63 A Fp Mcb , Outgoings: , 3 Nos 40A Dp Rccb (100 Ma) For Phase Control, 24 Nos 16A/10A Sp Mcbs To Feed The Small Powers.Db Shall Have Top Cable Adopter Box With Necessary Fixing Accessories Etc., To Enable Termination Of Incoming Cable And Outgoing Wires, And Shall Be As Per Is Standards And Directions Of Engineer-In-Charge. , Ldb - I: , The Scope Of Work Includes Supply Of Pre-Fabricated, Pre Wired Db’S Provided With Insulated Phase Busbars, Neutral Busbar With Shrouds, Earth Busbar With Colour Coded Interconnecting Wires, Blank Plates, Circuit Identification Tags, Double Door With Ip43 (Industrial Type) 7 Segment 8 Way Tpn Mcb Db(Pdb) Consisting Of Following, , Incomer: 63 A Fp Mcb , Outgoings: 3 Nos 32 A Dp Rccb (30 Ma) For Phase Control24 Nos 10A Sp Mcbs To Feed To Lighting Circuit. , Db Shall Have Top Cable Adopter Box With Necessary Fixing Accessorise Etc To Enable Cable And Outgoing Wires, And Shall Be As Per Is Standards And Directions Of Engineer-In-Charge. , Supply Of Metal Glad Plug And Socket, Single Phase, Neutral And Earth (Industrial Type) , Supply, Installation, Testing And Commissioning Of Single Phase 3 Pin Socket Type To Connect The 3 Tone A/C Unit At Board Room At Entrance Respectively. , Supply Of 32 A 1 Ph Ip 66 Protected Industrial Type Socket Above Falls Ceiling On The Surface Or Flush With Wall As Per The Site Requirements. , Supply, Installation, Testing And Commissioning Of 32 Dp Mcb Control Box For Controlling The A/C 3 Tone Unit In A Suitable Enclosure At Table Top Level On The Surface Or Flush With Wall As Per The Site Requirements. , Supply & Laying Of Lt Ug Cables , The Scope Of Work Includes Supply, Laying, Testing And Commissioning Of Ayfy/Aywy/ Pvc Armoured Aluminium Conductor Cables Along Walls, Cable Trays Including Supply And Fixing Of Clamps, Nuts, Bolts, Screws, Identification Tags At Beginning And End Each Cables. The Cables Shall Be Properly Dressed. (Nb: Measurements May Change Upon Site Requirements) , Supply & Erection Of 4C X 25 Sq.Mm Aly Ug Cable (From The Existing Main Panel To Pdb I Floor Main Distribution Board) , Supply & Erection Of 4C X 16 Sq.Mm Aly Ug Cable( From The Existing Main Panel To Pdb-Ii) , Supply & Erection Of 4C X 10 Sq.Mm Aly Ug Cable (From The Main Floor Distribution Board To Ldb -I) , Supply & Installation Of Lt Cable Termination , Supply & Installation Of All Materials And Termination Of The Following Ywy/Ayfy Copper Flexible Lt Ug Cables Using Double Compression Type Cadmium Plated Brass Cable Glands Suitable Crimped Type Cable Lugs(Copper), Cable Identification Tags And Including Gland Earthing Using Cu Conductor Of Adequate Size. , Termination Of 4C X 25 Sq.Mm Alu Ug Cable , Termination Of 4 C X 16 Sq.Mm Alu Ug Cable , Termination Of 4 C X 10Sq.Mm Alu Ug Cable , Supply Of Sockets , The Scope Of Work Includes Supply Of The Below Mentioned Sockets As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Supply, Erection, Testing And Commissioning Of 1 No. 16A/6A Socket Outlet Controlled By 1 No. 16A Switch , Supply, Erection, Testing And Commissioning Of 1 No. 6A Socket Controlled By 1 No 6A Switch (Board Socket). , 2 Nos 6A Malty Utility 5 Pin Sockets Controlled By 1 No.6A Switch For Computer Power Points Long The Patrician Wall Of The Cabin Or On The Wall On Surface Or Flush With Surface. , Switch Boards For Controlling Light Points , One No 6A Switch Controlling One Light Point , One No 6 A Switch Controlling 2 Points , One No 6 A Switch Controlling 3 Points , One No 6 A Switch Controlling 8 Points , Two Way Controlled Light Point Switch , Installation Of Conduit , The Scope Of Work Includes Installation And Laying Of Conduits In Concealed Or Surface Mounted For Circuit/Main/Telephone/Video Conferencing/Data Wiring With Clamps, Saddles, Pull Boxes And All Other Conduit Accessories As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Installation Of 32 Mm Pvc Conduit , Installation Of 25 Mm Pvc Conduit , Installation Of 20Mm Conduit , Supply Of Data Wiring , The Scope Of Work Includes Supply, Fixing And Connection Of Modular Type Of Anchor Make (Roma) Or Approved Equivalent Rj-45 Computer Socket Cat-6 With Shutter, Metal Box And Cover Plate, Complete With Labour And Materials As Per Direction Of The Engineer-In-Charge. , Cat-6 Cabling: , The Scope Of Work Includes Supply And Laying Of 4 Pair Cat-6 Type Cable In Pvc Pipe/Casing Caping With All Necessary Accessories For Computer Networking, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , Only Isi Marked Wires Of Make Finolex/Polycab/Havells/Kei/Rpg/V-Guard Shall Be Used. , Telephone Systems , The Scope Of Work Includes Supply And Laying Of 2 Pair,0.5/0.9 Mm Annealed Unarmoured Telephone Cable Laid In Already Installed Pvc Conduits With All Necessary Accessories From The Telephone Jb To Officer’S Table, All Complete With Labour And Materials, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , The Scope Of Work Includes Supply And Fixing Of Telephone Rj 11 Jack With Shutter In Gi Box Along With Modular Base And Cover Plate, Concealed In Wall / Partition, All Complete With Labour And Materials, As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. The Make Shall Be Anchor Or Equivalent. , Supply And Erection Of Point Wiring Material , The Scope Of Work Includes Supply Of Concealed/Surface Point Wiring Using 660V/1.1Kv Grade Copper Conductor Pvc Insulated Frls Copper Wires (With Proper R, Y, B Colour Code), As Per The Specifications Of This Tender And Directions Of Engineer-In-Charge. , 3 R Of 2.5 Sq. Mm Cu Conductor Wire (Circuit Mains) , 3 R Of 1.5 Sq. Mm Cu Conductor Wire (Point Wiring) , 3 R Of 2.5 Sq. Mm Cu Conductor Wire (6A Power Sockets) , Power Point Wiring With The Following Size Of Wires. , 2 R Of 6 Sq.Mm Cu Conductor Wire With 1R Of 2.5 Sq. Mm Cu Wires. (For A/C 3 Tone Unit) , 2 R Of 4 Sq.Mm Cu Conductor Wire With 1R Of 2.5 Sq. Mm Cu Wires. (For 16 A Power Plus) , Junction Boxes. , Suitable Size Junction Boxes To Terminate Power Wiring Cable, Which In Turn Should Be Enable To Take The Pipe Along With Wires In To The Patrician Walls And Other Area Where Wiring In Done In A Concealed Pattern.Size 200Mm X 50 Mm , Supply Of Electrical Fixtures , The Scope Of Work Includes Supply Of Following Light Fixtures Including Necessary Hardware Such As Clamps, Nuts, Bolts, Screws, Nails, Suspension Rods And Materials Required For Terminations, Interconnections, Earthing From Terminal Block/Ceiling Rose To Light Fitting, As Per Specifications Of This Tender And Directions Of Engineer-In-Charge. , Rc 380 B Led 36W 6500 G6 600X600 , 3 Watts Altra Spot Tilt Ww , 10 W Wiz Aura W1 F1 , 55 W /Pro Glow Nxt Strip Lighting /Bp 264 Led , 25W Cove Glow Strip Light With Driver 72 Led/Mtrs , 2 Mtrs 17Mm / Aluminium Profile , Supply And Associated Ac Works For Lobby , Supply Of Ceiling Mounted Fresh Air Fan, Low Noise Fans , Fresh Air Fan, 150 Cfm Ducted Type Fitted With Grille Make:Ecoair,, ,Equivalent ,, , Installation Work-Lowside , Installation Of 1.84 Tr 4 Way Cassette Unit , Installation Of Fresh Air Fan-150 Cfm , Supply & Installation Of Copper Pipe With Insulation With 19 Mm Thick Nitrile Rubber Insulation & Polyshield Coating-Cu Piping Thickness As Per Oem Standards Make: Mandev,Mexflow,Uniflow ,Armaflex,Kflex , Supply And Installation Of Drain Pipe With 9 Mm Thick Nitrile Rubber Insulation Make:Supreme ,Finolex,Astral , 32 Mm Dia , 25 Mm Dia , Supply & Installation Of Interconnecting Cable-4C X 2.5 Sqmm Make :Lapp,Beldon,Polycab,Finolex , Outdoor Unit Stand , Nitrogen Pressure Testing, Vaccumissing Etc , Bird/Insect Screen Mesh Of Ss, Ss Cowl @ 45 Deg , Air Transfer Grilles-400 Mm X 100 Mm Make:Cosmic,Airmaster,Systemaire , Supply Of Cassette Ac For Lobby , Supply Of 4 Way Cassette Unit , 1.84 Tr, Smart Featured 4 Way Cassette Unit, 5 Star, Inverter Model, Twin Rotary Compressor, 5 Years Warranty On Compressor, 5 Years Warranty On Pcb, 5 Year Warranty On Outdoor Casing Only, Lcd Wireless Remote Controller, Cooling Only Model, Capable Of Working With R32 Refrigerant, 100% Copper Model, Indoor Unit Air Quantity @ High Speed- 1350 Cmh, Unit Shall Be Capable Of Accessing Through Mobile App For Easy Operation. Additional Protective Corrosive Resistance Coating For Both Indoor & Outdoorheat Transfer Coils, Pcb Etc Make: Panasonic/Daikin/Mitsubishi Electric/Toshiba , Supply & Associated Ac Works Board Room , Supply Of Ceiling Mounted Fresh Air Fan, Low Noise Fans , Fresh Air Fan, 275 Cfm Ducted Type Fitted With Grille Make:Ecoair,,,Equivalent. , Installation Work-Lowside , Installation Of 3 Tr 4 Way Cassette Unit , Installation Of Fresh Air Fan-275 Cfm , Supply & Installation Of Copper Pipe With Insulation With 19 Mm Thick Nitrile Rubber Insulation & Polyshield Coating Make:Mandev,,Mexflow,,Uniflow , Supply And Installation Of Drain Pipe With 9 Mm Thick Nitrile Rubber Insulation Make:Armaflex,Kflex , 32 Mm Dia Make:Supreme,,Finolex,,Astral , 25 Mm Dia , Supply & Installation Of Interconnecting Cable-4C X 2.5 Sqmm , Outdoor Unit Stand Make:Lapp,Beldon,,,Polycab,,,Finolex. , Nitrogen Pressure Testing, Vaccumissing Etc , Bird/Insect Screen Mesh Of Ss, Ss Cowl @ 45 Deg , Air Transfer Grilles-400 Mm X 100 Mm Make:Cosmic,,,Airmaster,Systemaire. , Supply Of Cassette Ac For Board Room , Supply Of 4 Way Cassette Unit , 3.0 Tr, Smart Featured 4 Way Cassette Unit, 4 Star, Inverter Twin Rotary Compressor, 5 Years Warranty On Compressor, 5 Years Warranty On Pcb, 5 Year Warranty On Outdoor Casing Only, Lcd Wireless Remote Controller, Cooling Only Model, Capable Of Working With R32 Refrigerant, 100% Copper Model, Indoor Unit Air Quantity @ High Speed- 2200 Cmh, Unit Shall Be Capable Of Accessing Through Mobile App For Easy Operation. Additional Protective Corrosive Resistance Coating For Both Indoor & Outdoorheat Transfer Coils, Pcb Etc => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-May-2023 Corrigendum No.1 for Renovation Works in Board Room, Entrance Lobby and Staircase Areas of Admin Block - I at CPCL, Manali Refinery. Terms and Conditions 31-05-2023
2 31-May-2023 Corrigendum No.2 for Renovation Works in Board Room, Entrance Lobby and Staircase Areas of Admin Block - I at CPCL, Manali Refinery. Date 05-06-2023

Key Value

Document Fees
Refer document
EMD
INR 83000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Renovation Works in Board Room, Entrance Lobby and Staircase Areas of Admin Block - I at CPCL, Manali Refinery.
Sl. No. Item Description
1RENOVATION WORKS IN BOARD ROOM
2CIVIL WORK
3DEMOLITION OF BRICK MASONRY WORK in lime or cement mortar (taking all necessary safety precautions) ,manually / by mechanical means forheights 2.28m above plinth level including supply of all tools and tackles, necessary scaffolding, propping, underpinning, cleaning and disposal of unserviceable materials to the designated place within the Refinery premises as directed andincluding breaking into pieces, all labor, tools, etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.( Refer drawings sheet no : 1 )
4Providing, mixing andlaying in position RCCM35 with 20mm and down graded coarse aggregates as per IS 456:2000 with a minimum cement content of 400kg/Cu.m. using 53 grade Ordinary Portland Cement in LINTEL above door including cost of Shuttering,admixtures,labour charges, tools and tackles,providing pockets, openings, recesses, chamfering, wherever requried, vibrating, tamping, curing and rendering if required to give a smooth & even surface, providing neat cement wash, etc. (Excluding the Cost of Reinforcement), etc. all complete as specified,and directed by Engineer-in-Charge.
5REMOVAL OF EXISTING WOODEN FLOORING taking all necessary safety precautions, manually / by mechanical means including supply of all tools and tackles, propping, underpinning, cleaning and disposal of unserviceable materials to the designated place within the Refinery premises as directed andincluding breaking into pieces, all labor, tools, etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.( Refer drawings sheet no : 1 )
6Providing & layingCEMENT CONCRETE SCREED Using machine trowel of mix 1:1.5:3 (1 cement : 1.5 M sand: 3 Coarse aggregates 12.5mm and down graded aggregates) using 53 grade OPC inBoard Room & inclusive of curing/pond curing, brooming with wire brush, finishingetc.all labours, tools and tackles complete as per drawing, specification & as directed by Engineer in charge.
7DISMANTLING OF FALSE CEILING AND WALL PANELLING with frame workof any description(taking all necessary safety precautions) for all heights above floor level including hire charges for tools & tackles, providing necessary scaffolding, propping, underpinning, temporary supports etc. ,as per the instruction of Engineer-in-Charge, cleaning and stacking, transporting, loading & unloading and handing over of serviceable material like aluminium frames at destined location /CPCL storage Yardwithin the refinery area and disposal of unserviceable material atdesignated place within the refinery area as per specification and directions of Engineer-in-Charge. ( Refer drawings sheet no : 1 )
8DISMANTLING OF WINDOWS & DOORSwith frame, shutterschowkhats, architrave, holdfasts grill ,etc. all complete including hire charges for all tools & tackles required for carrying out dismantling,stacking material, transporting, loading & unloading and handing overto scrap yard/stores within Refinery premisesas specified and directed by the Engineer-in-charge. ( Refer drawings sheet no : 2 )
9Providing and laying BRICK MASONRY IN SUPER STRUCTUREabove FFL level using cement mortar 1:5 (1 Cement:5 Coarse Sand)for allheightsincluding the cost of materials, labour,tools and tackles, scaffolding/staging, sampling and testing, soaking of bricks, cutting and laying of bricks, providing recesses, making openings of any shape and size,embedding the fittings,curing, etc. all complete as per specifications, and as directed by Engineer-in-Charge.
10Providing 15mm THICK CEMENT PLASTER in cement mortar 1:4 (1Cement:4 M sand) onbrick masonry, PCC/RCC surfaces including preparation of base, cleaning, chipping, hacking of existing plaster, scaffolding if required, finishing, curingincludingmouldings and providing grooves in plaster, etc. as specifiedfor all depths and heights including labour charges,tools and tackles,material costs etc. as per specifications and asdirected by the Engineer-in-Charge.
11Providing 6mm THICK CEMENT PLASTER in cement mortar 1:3 (1Cement:3 M sand by volume) on Roof Ceilings, concretesurfaces including preparation of base, cleaning, chipping,hacking of existing plaster, packing of electrical works,scaffolding, finishing, curing etc.for all heights complete with all labour charges,material costs,tools and tackles etc.as per specifications and as directed by the Engineer-in-Charge.
12REPAIR OF EXISTING WALLS & CEILING plasters of varying thickness of 12mm to 20mm including cutting the patch in proper shape, raking out joints, preparing and plastering the surface of the walls and ceilings complete including disposal of rubbish to the designated place within the Refinery premises with cement mortar 1:4 (1 cement : 4 fine aggregate). Rate inclusive of chipping and scaffolding. All complete as per specifications, and as directed by Engineer-in-Charge.
13FLOORING TILES
14Nylon Carpet tile of multi level loop pile type of size 500x500mm with 100% Nylon 6 yawn, height of the pile should be 3.5mm, overall thickness of carpet should be 6mm. The pile weight be 680g/sqm. The Brand, shade, Pattern and colour shouldbe approved by E-INC. (Refer drawings sheet no: 1) Samples to be submitted to EIC for approval.
15FALSE CEILING
16Providing and Fixing suspended12.5mm GYPBOARD PLAIN PANEL CEILING including Gypserra Perimeter Channelis fixed along the perimeter of existing wal with the help of HILTI HPS - 1 (6x40) impact anchor, at 600mm centres.Gypserra Ceiling Angleis suspended by fixing it to the Gyproc Soffit cleat and or Gyproc Rawl Plug-8x45mm creating 1220mm x 1220mm grid.Gypserra Intermediate channelis fixed to the Gypserra Ceiiing Angle with M6 x 12mm Hex Bolt & Hex Nut arrangement or with 2 Nos of Ø4.2x13 Gyproc metal to metal screw. The Gypserra Ceiling Sectionis then fixed to the Gypserra Intermediate Channelwith the help of Gyproc Connecting Clipand in direction perpendicular to the Intermediate channel at 457mm c/c. Single layer of 12.5mm tapered edge GYPBOARD PLAIN TILE (conforming to IS 2095 Part 1 : 2011) is then screw fixed to ceiling section with 25mm drywall screwsat230mm centres on ceiling section and 150mm at periphery of ceiling.Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Jointing Compound & Joint Paper tape.The work is to be executed all complete at all different elevations including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
17Supply & Fixing of 600X600mm Aluminium Tile Perforated with easy demountable Clip-In Tile with Clip-In U channel system manufactured out of 0.7mm thick Coil Coated on a continuous coil coating process on Aluminium Alloy 3105 with 2.4mm dia perforated 16% Openness in 5.5mm Pitch with NWT acoustical tissues at the rear side of the tile, self-glued to achieve 0.7NRC.The work is to be executed all complete including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
18Providing and fixing Linear Slat Ceiling 80B Perforated Aluminium Panel & V groove ceiling manufactured by M/s Hunter Douglas India Pvt. Ltd. of Walnut wood colour consisting of panel 80mm X 15 mm deep X 0.5mm thick Perforated Aluminium Panel of 2 mm diameter diagonal patten with 5 mm centre to centre apertures represents 16 % openness with panel length up to 6 mtr, Coil Coated on a Continuous Paint Line, and shall be stove enamelled in a continuous coil coating process with the approved colour on the exposed side and the reverse side with polyester primer. The work is to be executed all complete including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
19WALL PANELING
20Providing WALL PANELLING on existing brick wall with 25mm x 50 mmX2mm(0.767kg/M) aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing of 8 mm thick BWP plywood by screwing to the aluminium framework and providing with walnut veneer of Greenply/Century/Archidplyon exposed side and applying with approved quality antitermite chemical solution on concealed surfaces with all complete including material costs,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.The shade ,colour,tecture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 4-7 )
21Providing WALL PANELLING with 5mm thickwhite coloured saint gobain glass Pasted to the 8mm thk BWP plywood using silycon sealant and 3m double sided tapeas shown in the drawing which is Screwed to 25mm x 50 mmx2mm(0.767kg/M) aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps over the brick wall with approved quality antitermite chemical solution on concealed surfaces. all complete including material costs,labour costs,tools and tackles etc as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer Sheet No : 4 - 7) ( rate to be quoted based on the actual glass sizes to be fixed at site including wasteages ) ( Refer drawings sheet no : 4-7 )
22"Providing & Fixing of KNAUF SOLUTIONS (ARMSTRONG) ‘Optra Acoustical Wall Paneling’ with square edges made of fibre glass substrate 25mm thick and wrapped on the front side with an acoustically transparent and classified for Fire reaction Class B-s1, d1 as per EN13501, fabric with an option of colors – Husk as per the choice of the Architect providing a minimum sound absorption level of 0.90 NRC to be affixed to wall using Wall panel impalers supplied by M/s KNAUF CEILING SOLUTIONS (ARMSTRONG)Industries India Pvt. Ltd and construction adhesives as per the instructions laid down by the manufacturer. ( Refer drawings sheet no : 4-7 ) "
23Providing and Fixing backing surface for fabric KNAUF panels over 25mm x 50 mmx 2mm(0.767kg/M)aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing of 8 mm thick BWP plywood by screwing to the aluminium framework a with approved quality antitermite chemical solution on concealed surfaces with all complete including material costs,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge. ( Refer drawings sheet no : 4-7 )
24Providing WALL PANELLING on existing brick wall with 25mm x 50 mmx2mm(0.767kg/M) aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing Europratik Louvers or its equvt, Walnut woodshade as approved by E-IN-C, over 8 mm thick BWP plywood which is screwing to the aluminium framework with approved quality antitermite chemical solution on concealed surfacesall complete including material costs,labour costs,tools and tackles as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 4-7 )
25DOOR, UPVC WINDOWS, UPVC DOORS, UPVC VENTILATORS
26Providing and fixing in position FENESTA DOUBLE GLAZED TOUGHEN GLASS OPENABLE WINDOWWalnut Wood Colour(no. of panels as approved(with clear 5mm thick glass double glazing for sound proofing ),with G.I , MEMBER 1.5 MM of white in colour including all fixtures, fastenings, handle with flush lock, EPDM gaskets, wool pile etc., making recesses in brick/concrete surfaces and making good the same after fixing complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 1)
27Providing and fixing in positionuPVC DOORS (Electrical Room external door ) single leaf lwhite in colour uPVC panels of minimum 15mm thickness (doors may be either partly glazed , partly paneled or fully panelled)with UPVC stiles, rails,frame and accessories holdfasts, hinges, pull handles on both sides, locking arrangement as per requirementincluding labour charges, material cost, tools and tackles all complete as per specifications & as directed by Engineer-in-Charge.
28Providing and Fixing ISI marked, 30mm thick BWP FLUSH DOOR SHUTTERS of Greenply/Century/Archidplydecorative type, consisting of solid core block board bonded with phenol formaldehyde synthetic resin andwith 4mm overall thickness walnut veneer of Greenply/Century/Archidply facing both sides with 1st class teak wood lipping on all edges. The center part should be removed as mentioned in drawing and should be fixed with 8mm thk BWP Plywood with 4mm thk veneer on both sides andproviding 6mm thick teakwood perimeter beading fixed by means of approved quality neoprene based adhesive and nailing @ 300mm max., providing and fixing 125mm long stainless steel butt hinges [for each shutter (vertical spacing not exceeding 600mm) ] including providing wooden filler/sealer, stainless steel lock, door bush, finishing etc . complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
29Providing and Fixing ISI marked, overall 30mm thick BWP FLUSH DOOR SHUTTERS of Greenply/Century/Archidplydecorative type, consisting of solid core block board bonded with phenol formaldehyde synthetic resin and fixedwith 4mm overall thickness walnut veneer of Greenply/Century/Archidplyon external sideand internal side fixed with prefinished charcoal louvers of Europratik or its equivalent, Walnut woodshade as approved by E-IN-C,.and fixing 125mm long stainless steel butt hinges(vertical spacing not exceeding 600mm)including providing wooden filler/sealer, stainless steel lock , door bush, finishing etc . complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
30Providing and fixingSECOND CLASS TEAK WOODEN FRAMES150mmx60mm,for doors for all heights including all labours, tools, tackles, cutting, shaping, jointing,applying 2 coats of wood primer mixed with approved quality antitermite chemical solution on concealed surfaces, fixing in masonry/RCC by means of 300mm x 25mm x 6mm thick M.S. Hold fasts screwed to frame @ 600mm max vertically and grouted with 1:2:4concrete by volume in min. 350mm x 100mmx100mm sized hole made in masonry/96mm long, 12mm dia M.S. dash fastner etc. all complete as dirercted by Engineer-in-Charge.
31Providing and Fixingaluminium extruded section body tubular type universal HYDRAULIC DOOR CLOSER of dorma make with double speed adjustment with necessaryaccessories and screws with all labour charges,tools & tackles etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge
32Providing and fixing bright finished CP brass 100mm MORTICE HANDLE WITH LOCK of Godrej make model as approved by EIC, ISI marked with four levers and a pair of polished stainless steel decorative handles (size of handles to match the door size) with necessary screws etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge
33CABINETS
34providing & fixing CONSOLE CABINET tableof size as mentioned in drgs Made out of18mm thkBWPPlywood with walnut shade veneer of Greenply/Century/Archidply,on external surfaces and 1mm laminate on internal surface with rehal tape of walnut shade and finished with saint Gobain 10 mm thickwhite colour glass counter top. The cabinet should be fitted with eco hinges and chromium plated angle. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 21 )
35providing & fixing WALL CABINET around tv unit of size as mentioned in drgs Made out of18mm thkBWPPlywood withwalnut shade veneer of Greenply/Century/Archidply finish exposed surface of wanut shade with openable shuttersand Internal surface to be finished with laminate of walnaut shade using butterfly hinges and chromium plated angle. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 5)
36SPECIAL ELEMENTS
37Providing and fixing 25mm x 40mmL SHAPE STAINLESS STEEL PROFILE(Euro Pratik Elite section or approved equivalent ) silver finish as edge profile glued with SR Fevicol including material costs,labour,tools and tackles ect.all complete as directed by Engineer in Charge. ( Refer drawings sheet no : 12 )
38Providing and fixingAluminium Ripple Fold Concealed Curtain Track with necessary plastic hooks and wheels as required, screwed to the 18mm thk BWP Plywood box section which is srewed to the side wall / lintel. The work is to be executed all completeincluding material costs,labour ,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
39Providing and fixing Satin Fabric CURTAINS ( should absorb sound and blackout the light ). It should be installed in a ripple fold pattern. The measurement of the curtain is based on the width of the track and the total height is from floor level.The work is to be executed all complete including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
40Providingandapplying two coats ofINTERIOR ROYAL EMULSION PAINTwithAsian Paint or approved equivalent make of any shades/colours asper the specifications and including a priming coat with cement primer of approved brand of the same and appling one coat of wall putty, for roof ceiling/ rafters/walls/wall panelling/ceiling, and drywall partition withnecessaryscaffolding and surface preparation, sand papering, scrapping & removing old loose paint films, filling all holes and depressions, etc., complete as per specification and as directed by Engineer-in-Charge.NOTE-In case of painting in existing walls entire wall is to be cleaned and putty to be applied before painting.
41Disassembling the conference table into 2 or more parts as required, shifting to designated location before commencement of dismantling works inside board room, shifting back to board room after completion of board room interior works, Reassemblingand Fixing of 4mm thk Walnut shade veneer of Greenply/Century/Archidply above the existing conference table top with teak wood perimeter beading of 6mm thikness on vertical edge of height 60mm or as req. and finish with PU Varnish. all complete including materials, labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.( theveneer need not to be replaced below the table)
42Repolishing of Conference Table vertical support by changing the existing teakwood color to Walnut color as directed bt E-IN-C. The set durface shall be finished with Melamine matt finish to match the same Walnutfinishsimilar toveneer fixed to table top. all complete including materials, labour costs,tools and tackles etc. all complete as directed by Engineer in Charge
43Providing and fixing 5mm thickwhite coloured saint gobain glassusing silycon sealant and 3mm double sided tapeon center of the table as mentioned in drawings. all complete including materials, labour costs ,tools and tackles etc. all complete as directed by Engineer in Charge
44Preparation of new / old wood surfacesby applying filler coat,Staining VARNISH POLISH to veneer/ wooden surfaces of shade and colour as approved by E-IN-C and applying one layer spray coat of PU coat( polyurethane coating) semi matt finish including all labour charges ,material charges etc. all complete as directed by Engineer-in-Charge
45FURNITURE
46"Supply ofGodrej - LA SEDE HIGH BACK CHAIR [Conference - 17 ] as per following specifications. Seat/back assembly : the cushioned seat should be made of injection molded plastic outer & inner.plastic inner should be upholstered with pure leather and moulded high resilience (hr) polyurethane foam of density 45±2 kg/m3,and hardness load 16 ± 2 kgf for 25% compression.the cushioned backshould be made of pu foam with insitu molded ms e.r.w round tube of size 1.9±0.03cm x 0.16 ±0.0128cm. it upholstered with pure leather. seat size : 47.6 cm. (w) x 49.2 cm. (d)back size : 47.5 cm. (w) x 77 cm. (d) armrests: the armrest top should be moulded from polyurethane(pu), upholstered in pure leather and mounted on to a drop lift adjustable type tubular armrest support made of 03.81±0.03cm x 0.2±0.01 cm thk m.s e.r.w tube having chrome plated finish.the armrest height adjustable up to 6.5±0.5cm in 5 stepsactive bio-synchro mechanism: the adjustable tilting mechanism should be designed with the following features:• 360° revolving type.• front-pivot for tilt with feet resting on ground and continuous lumbar support ensuring more comfort.• tilt tension adjustment can be operated in seating position.• 5-position tilt limiter giving option of variable tilt angle to the chair.• seat/back tilting ratio of 1: 2• the mechanism housing should be made up of hpdc aluminium black powder coated.4 seat depth adjustment: seat depth adjustment should be integrated in the seat through a sliding mechanism. seat depth adjustment range should be of 6.0±0.5 cm. adjustable back support: back frame should be connected to the up/dn mechanism housed in plastic t spine. it can be adjusted in the range of 7.42±0.5 cm for the comfortable back support to suit individual need.pneumatic ht. adjustment: the pneumatic height adjustment has anadjustment stroke of 10.0±0.3 cm.pedestal assembly the pedestal should be high pressure die cast polished aluminium and fitted with 5 nos. twin wheel castors. the pedestal should be 65.0 ± 0.5cm. pitch-center dia.(75.0 ± 1.0cm. with castors.)twin wheel castors:the twin wheel castors should be injection moulded in black polypropylene. Overall Dimensions of Chair Seat Height -44.5 to 54.5 cm. Height -114-131.5 cm. Width & Depth of Chair as measured from base - Width-76.1 cm and Depth-66.5 cm"
47"Supply ofGodrej - LA SEDE VISITOR CHAIR[ Conference - 20 ] as per following specifications. Seat/back assembly : the cushioned seat should be made of injection molded plastic outer & inner.plastic inner should be upholstered with pure leather and moulded high resilience (hr) polyurethane foam of density 45±2 kg/m3,and hardness load 16 ± 2 kgf for 25% compression.the cushioned back should be made of pu foam with insitu molded ms e.r.w round tube of size 1.9±0.03cm x 0.16 ±0.0128cm. it upholstered with pure leather. seat size : 47.6 cm. (w) x 49.2 cm. (d)back size : 46.5 cm. (w) x 59.5 cm. (d)visitor tubular frame: the tubular frame should be cantilever type and made of ø2.54± 0.03 cm x 0.02 ± 0.016cm thick ss 202 tube. the back should be connected to frame through chrome plated high pressure die case connector piece.Overall Dimensions of Chair Seat Height -46.2 cm. Height -98.2 cm. Width & Depth of Chair as measured from base - Width-60.9 cm and Depth-64.7 cm"
48Supplying, fabricating and placing in position HIGH STRENGTH DEFORMEDSTEEL BAR REINFORCEMENT of grade Fe500 for RCC work, straightening,cleaning, decoiling, cutting, bending to required shapes and lengths asper details, binding with contractor"s own 16 Standard Wire Gauge(SWG)black soft annealed binding wire at every intersection, supplying andplacing with proper cover blocks, supports, overlaps, chairs, spacers,lifting hooks etc for all heights & depths etc. all complete as directedby Engineer-in-Charge.
49Manufacturing, transporting, supplying and erecting in position RCCPRECAST ELEMENTS of Nominal Mix 1:1.5:3 (1 cement:1.5 M sand: 3 stone aggregates of 20mm and down size graded crushed stone aggregates as per IS:456-2000 using Ordinary Portland Cement (OPC) 53 grade for all leads, levels, shapes and thicknessincluding all moulds, shuttering and centering, vibrating, tamping,curing, chamfering, wherever required, finishing the top surface withcement mortar 1:3( 1 Cement : 3 MSand) to give a smooth and evensurface or non skid finish as specified, providing lifitng hooks, metalinserts, making holes pockets, (only M.S. inserts to be measured & paidseperately) transporting to site, erecting, levelling, aligning andfixing in position all complete (excluding cost of Reinforcement) andas directed by the Engineer-in-Charge.
50Providing and applying approved EPOXY RESIN of Fosroc or approved equivalent for bonding of fresh concrete to old concrete in all types of structures at all depths and heights including cleaning of concretesurfaces, removing of all loose concrete pieces, making rough bychiselling, taking off the skin of concrete, application of Epoxy Resin System as per manufacture"s recommendations taking all safety measures,etc.complete as specified and directed by Engineer-in-Charge.
51"REPAIRS TO EXISTING RCC BEAMS, COLUMNS & SLAB including chipping and dismantling & removing of loose particles applying cement paste, rakingout joints, applying epoxy resin rakingout joints, applying epoxy resin for bonding fresh cocrete to oldconcerete, filling void portion with concrete 1:1:5:3 concrete(1Cement:1.5 M Sand :3 stone aggregates 12mm size) making good as same,including formwork, curing, staging, working platforms labours, tool andtackles all complete as per s pecifications and directions of Engineer-in-Charge."
52ENTRANCE LOBBY AND STAIRCASE AREAS
53CIVIL WORK
54DISMANTLING OF MOSAIC in staircaselaid in cement mortar (taking all necessary safety precautions)manually / by mechanical means including necessarytools and tackles, propping, underpinning, cleaning the siteand disposal of unserviceable materialatdesignated place inside the Refinery premises as per specification and directions of Engineer-in-Charge. ( Refer drawings sheet no : 1 )
55TAKING OF TILE WORK IN FLOORS AND SKIRTINGlaid in cement mortar for thickness upto 25mm (taking all necessary safety precautions)manually / by mechanical means including necessarytools and tackles, propping, underpinning, cleaning the siteand disposal of unserviceable materialatdesignated place inside the Refinery premises as per specification and directions of Engineer-in-Charge.
56DISMANTLING OF FALSE CEILING AND WALL PANELLING with frame workof any description(taking all necessary safety precautions) for all heights above floor level including hire charges for tools & tackles, providing necessary scaffolding, propping, underpinning, temporary supports etc. ,as per the instruction of Engineer-in-Charge, cleaning and stacking of serviceable material like aluminium frames at destined location /CPCL storage Yardwithin the refinery area and disposal of un serviceable material atdesignated place inside the refinery premises as per specification and directions of Engineer-in-Charge.
57DISMANTLING OF WINDOWS & DOORSwith frame, shutterschowkhats, architrave, holdfasts grill ,etc. all complete including hire charges for all tools & tackles required for carrying out dismantling,stacking material, transporting, loading & unloading and handing overto scrap yard/stores within Refinery premisesas specified and directed by the Engineer-in-charge and disposal of unserviceable material atdesignated placeinside the refinery premises.( Refer drawings sheet no : 2 )
58DISMANTLING OF WOODEN HANDRAIL & SS BALUSTADE and making the side plaster surface neat & clean & disposal of unserviceable materialatdesignated place inside the Refinery premises as per specification and directions of Engineer-in-Charge.
59PROVIDING, ERECTION & DISMANTLING OF SCAFFOLDING FOR ALL HEIGHTS: Job involves erection of scaffolding at the required locations using 1-1/2 inch dia steel tubular pipes with suitable clamping arrangement ,providing steel gratings, access staircase system at required locations firmly tied on to the scaffolding pipes, removal of the steel gratings & scaffolding materials on completion of the job. The job shall be carried-out as per CPCL Scaffolding procedure. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, all consumables and labour to complete the job in all respects, supply & transportation of steel scaffolding materials & steel gratings to the work site etc. complete as per directions and approval of Engineer-in-charge. The payment will be made once irrespective of duration of scaffolding.
60REPAIR OF EXISTING WALLS & CEILING plasters of varying thickness of 12mm to 20mm including cutting the patch in proper shape, raking out joints, preparing and plastering the surface of the walls and ceilings complete including disposal of rubbish to the designated place within the Refinery premises with cement mortar 1:4 (1 cement : 4 fine aggregate). Rate inclusive of chipping and scaffolding. All complete as per specifications, and as directed by Engineer-in-Charge.
61Providing & laying CEMENT CONCRETE SCREED Using machine trowel of mix 1:1.5:3 (1 cement : 1.5 M sand: 3 Coarse aggregates 12.5mm and down graded aggregates) using 53 grade OPC inBoard Room & inclusive of curing/pond curing, brooming with wire brush, finishingetc.all labours, tools and tackles complete as per drawing, specification & as directed by Engineer in charge.
62Providing and laying BRICK MASONRY IN SUPER STRUCTUREabove FFL level using cement mortar 1:5 (1 Cement:5 Coarse Sand)for allheightsincluding the cost of materials, labour,tools and tackles, scaffolding/staging, sampling and testing, soaking of bricks, cutting and laying of bricks, providing recesses, making openings of any shape and size,embedding the fittings,curing, etc. all complete as per specifications, and as directed by Engineer-in-Charge.
63Providing 15mm THICK CEMENT PLASTER in cement mortar 1:4 (1Cement:4 M sand) onbrick masonry, PCC/RCC surfaces including preparation of base, cleaning, chipping, hacking of existing plaster, scaffolding if required, finishing, curingincludingmouldings and providing grooves in plaster, etc. as specifiedfor all depths and heights including labour charges,tools and tackles,material costs etc. as per specifications and asdirected by the Engineer-in-Charge.
64Providing 6mm THICK CEMENT PLASTER in cement mortar 1:3 (1Cement:3 M sand by volume) on Roof Ceilings, concretesurfaces including preparation of base, cleaning, chipping,hacking of existing plaster, packing of electrical works,scaffolding, finishing, curing etc.for all heights complete with all labour charges,material costs,tools and tackles etc.as per specifications and as directed by the Engineer-in-Charge.
65FLOORING TILES
66Providing and laying of premium quality Glazed VITRIFIED TILES of size 800x800mm / 600x1200mm of Kajaria/Somany/Johnson- shade, size as approved by Architect or E-IN-C,GLOSSY FINISH, decorative type of tiles, approved make with bed of 20mm thick cement mortar 1:3 in line and level including cleaning the finished surfaces with oxalic acid including skirting out the joints, flush pointing of joints of tiles with cement paste/grout mixed with colour pigments matching the shade of tiles,4"skirting all around as per drawing ,along with material costs ,tools and tackles, labour charges etc.as per specifications, standards and instructions of Engineer-in-Charge as per drawing. (Refer drawings sheet no: 1)
67Providing and fixing 18mm thick machine cut, mirror polished, premoulded and pre-polished machine cut Tanbrown GRANITE FOR STAIRCASE (& Lapotra finish for Staircase Treads only)of approved qualitywith full bull nose edge polishing etc.of required size ofcolour/shade as approved by E-IN-C, laid 20mm thick base cement mortar 1:4 (1 Cement:4 M Sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including machine polishing to edge to give high gloss finish, providing machine cut opening as per requirement etc., rubbing, curing, moulding & full bull nose edge polishing etc. complete at all levels as directed by Engineer-in-Charge.(Refer drawings sheet no:1 ) WORK INCLUDES PLASTERING AND TOUCHING UP THE SIDE SURFACES OF WAIST SLAB AND FINISHING THE SURFACES NEATLY .
68FALSE CEILING
69Providing and Fixing suspended12.5mm GYPBOARD PLAIN PANEL CEILING including Gypserra Perimeter Channelis fixed along the perimeter of existing wall/ partition with the help of HILTI HPS - 1 (6x40) impact anchor, at 600mm centres.Gypserra Ceiling Angleis suspended by fixing it to the Gyproc Soffit cleat and or Gyproc Rawl Plug-8x45mm creating 1220mm x 1220mm grid.Gypserra Intermediate channelis fixed to the Gypserra Ceiiing Angle with M6 x 12mm Hex Bolt & Hex Nut arrangement or with 2 Nos of Ø4.2x13 Gyproc metal to metal screw. The Gypserra Ceiling Sectionis then fixed to the Gypserra Intermediate Channelwith the help of Gyproc Connecting Clipand in direction perpendicular to the Intermediate channel at 457mm c/c. Single layer of 12.5mm tapered edge GYPBOARD PLAIN TILE (conforming to IS 2095 Part 1 : 2011) is then screw fixed to ceiling section with 25mm drywall screwsat230mm centres on ceiling section and 150mm at periphery of ceiling.Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Jointing Compound & Joint Paper tape.The work is to be executed all complete at all different elevations including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
70Providing and fixing of Wooden False Ceiling above reception counter with 18 mm thick BWP plywood withwalnut veneer of Greenply/Century/Archidply on exposed side which is screwed with wooden framework using country wood of size 50mmx50mm. all complete including material costs,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.The shade,colour,texture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
71Providingand fixing of Wooden False Ceiling above reception counter with 100mm x 12mm BWP plywood battern with 4mm thk ost and 6mm thk teak wood perimetrebeading on both the ends and screwing it to the 6mm BWP Plywood which is screwed with wooden framework using country wood of size 50mmx50mmwith all complete including material costs,labour costs ,tools and tackles etc. all complete as directed by Engineer in Charge.The shade,colour,tecture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. ( Refer drawings sheet no : 23-26 )
72WALL PANELING
73Providing WALL PANELLING on existing brick wall with 25mm x 50 mm X2mm(0.767kg/M)aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing of 8 mm thick BWP plywood by screwing to the aluminium framework and providingwalnut veneer of Greenply/Century/Archidplyon exposed side by pasting to the plywood with approved quality antitermite chemical solution on concealed surfaces with all complete including material costs,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.The shade,colour,texture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 8 - 11)
74Providing WALL PANELLING with 5mm thickwhite coloured saint gobain glass Pasted to the 8mm thk BWP plywood using silicon sealant and 3m double sided tapeas shown in the drawing which is Screwed to Aluminion Framework made of 25mm x 50 mm X2mm(0.767kg/M)aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps over the brick wall with approved quality antitermite chemical solution on concealed surfaces. all complete including material costs,labour costs,tools and tackles etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer Sheet No : 4 - 7) ( rate to be quoted based on the actual glass sizes to be fixed at site including wastages ) (refer drawings Sheet No : 8 - 11)
75Providing WALL PANELLING BEHIND RECEPTION TABLE on existing brick wall with 25mm x 50 mm X2mm(0.767kg/M)aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing of 100mm x 12mm BWP plywood battens with 4mm thk ost and 4mm thk beading on both the ends and screwing it to the8 mm BWP Plywood which is screwed to the aluminium framework with approved quality antitermite chemical solution on concealed surfaces all complete including material costs ,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.The shade,colour,texture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 8 - 11)
76Providing WALL PANELLING NEAR STAIRCASE AREA on existing brick wall with 25mm x 50 mm X2mm(0.767kg/M) aluminum hollow sections at not more than575 mm c/c on either direction with necessary clamps and fixing Europratik Louvers or its equvt. to 8 mm thick BWP plywood which is screwing to the aluminium framework with approved quality antitermite chemical solution on concealed surfacesall complete including material costs,labour costs,tools and tackles etc. all complete as directed by Engineer in Charge.The shade,colour,tecture of veneer shall be as approved complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 16 - 18)
77Panelling on the jambs of patch fitting glass door using 12mm thk BWP Plywood with 4 mm thick veneer of Greenply/Century/Archidply with lipping all as shown in the drawing complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
78Refurbishing the partition below staircase landing by removing the existing laminate and replacing with new laminate over the existing surface after making the surface level neat & clean & Pasting with necessary SR / Fevicol.
79DOOR, UPVC WINDOWS, UPVC DOORS, UPVC VENTILATORS
80Providing and fixing in position upvc sliding window of Venesta(no. of panels as approved ,with G.I , MEMBER 1.5 MMwhite in colour including all fixtures, fastenings, handle with flush lock, EPDM gaskets, wool pile etc., making recesses in brick/concrete surfaces and making good the same after fixing complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 1)
81Providing and fixing in position Fixed Glazing uPVC WINDOWS of Venesta (with clear 5mm thick glass double glazing), white in colour including all fixtures, fastenings, etc. making recesses in brick/concrete surfaces and making good the same after fixing all complete as per directions of Engineer-in-Charge. (refer drawings Sheet No : 1)
82Providing and Fixing ISI marked,Double Leaf 30mm thick BWP FLUSH DOOR SHUTTERS of Greenply/Century/Archidplydecorative type, consisting of solid core block board bonded with phenol formaldehyde synthetic resin and with 4mm thick veneer of Greenply/Century/Archidply facing both sides with 1st class teak wood lipping on all edges. The center part should be removed as mentioned in drawing and should be fixed with 8mm thk BWP Plywood with 4mm thk Walnut veneer on both sides andproviding 6mm thick teakwood perimeter beading fixed by means of approved quality neoprene based adhesive and nailing @ 300mm max., providing and fixing 125mm long stainless steel butt hinges [for each shutter (vertical spacing not exceeding 600mm) ] including providing wooden filler/sealer, stainless steel lock, door bush, finishing etc . complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 13)
83Providing and fixingSECOND CLASS TEAK WOODEN FRAMES150mmx60mm,for doors for all heights including all labours, tools, tackles, cutting, shaping, jointing,applying 2 coats of wood primer mixed with approved quality antitermite chemical solution on concealed surfaces, fixing in masonry/RCC by means of 300mm x 25mm x 6mm thick M.S. Hold fasts screwed to frame @ 600mm max vertically and grouted with 1:2:4concrete by volume in min. 350mm x 100mmx100mm sized hole made in masonry/96mm long, 12mm dia M.S. dash fastner etc. all complete as dirercted by Engineer-in-Charge.
84Providing and fixing frameless glass door of size 1.8m x 2.1m using 10mm thick clear toughened glass with patch and other fittings of Dormakaba make including cutting, making holes, cutouts in the glass of required shape and size to accommodate fittings and fixing the fittings in floors, soffits, jambs including necessary screws, fixtures, sealants wherever required and SS cover over patch fittings etc., all complete as per particular specification (refer drawings Sheet No : 8 - 9)
85Providing and fixing fixed glass partitons on either side of frameless glass door to a height of 2.55m using 10 mm thick toughened glass with ULPT 90/ ULPT 92 patch fittings of Dormakaba make at the top and aluminium channel at the bottom. Cost to include, cost of glass including making holes, cut outs and applying sealants all complete.(refer drawings Sheet No : 8 - 9)
86Providing and Fixingaluminium extruded section body tubular type universal HYDRAULIC DOOR CLOSER of dormakaba make with double speed adjustment with necessaryaccessories and screws with all labour charges,tools & tackles etc. complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge
87Providing and fixing bright finished CP brass 100mm MORTICE HANDLE WITH LOCK of Godrej make of model as approved by EIC,ISI marked with four levers and a pair of polished stainless steel decorative handles (size of handles to match the door size) with necessary screws etc.complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge
88CABINETS
89providing & fixingReceptiontable of size 2.43m x 0.60m x 1.00m made out of18mmthk BWP plywood with veneer of Greenply/Century/Archidply finished on exposed surface on shown in drawings with PU Coating ( Polyurethane) semi matt finish partially and NANO WHITE STONE PARTIALLY on exposed sidesand 1mm white laminate inside with rehau tape of Walnut shadewith 18mm thk NANO WHITESTONE counter top. The cabinet shutters should be fitted butterflyhinges , The drawer channels, keyboard channelsof ebco make with screws and nails complete complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge(refer drawings Sheet No : 20)
90providing & fixing Storage cabinet of size2.10mx0.3m x 3.43m made out of 18mm thkBWPPlywood with Walnut veneer of Greenply/Century/Archidply finished with PU Coating ( Polyurethane) semi matt finish. The cabinet shutter should be fitted with Butterfly hinges and chromium plated angle.complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge. (refer drawings Sheet No : 22)
91SPECIAL ELEMENTS
92ENTRANCE DECORATIVE SPECIAL TABLE of size 1.50m x 0.45m made out of sshollow box section of size 75x25 mm(304 grade) of required thicknessbend to shape in cnc , welded and polished neatly and thetable top provided with 12mm thick saint gobin white coloured glassas approved by Engineer-in-Charge. (refer drawings Sheet No : 19)
93Providing and fixingAluminium Ripple Fold Concealed Curtain Track with necessary plastic hooks and wheels as required, screwed to the 18mm thk BWP Plywood box section which is srewed to the side wall / lintel. The work is to be executed all completeincluding material costs,labour ,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
94Providing and fixing Satin Fabric CURTAINS ( should absorb sound and blackout the light ). It should be installed in a ripple fold pattern. The measurement of the curtain is based on the width of the track and the total height is from floor level.The work is to be executed all complete including material costs,labour,tools and tackles complete all as per trade practice and as directed byarchitect/ consultant /Engineer in charge.
95Providing and fixing ROLLER BLIND with 100% polyester blackout fabric ,colour coated with acrylic and Control Unit with clutch Mechanism,Idler ,Operating Chain,Galvanized M.S.Bracket with Powder coated Bracket ,Spring steel clamp , Extruded aluminum channel Powder Coated in White Load Bar,Aluminum extruded grooved tube –anodized & covered with matching fabric,fabric roller tube all complete as directed by Engineer-in-Charge.The colour and pattern to be decided jointly with EIC. (refer Sheet No : 18)
96Providingandapplying two coats ofINTERIOR ROYAL EMULSION PAINTwithAsian Paint or approved equivalent make of any shades/colours asper the specifications and including a priming coat with cement primer of approved brand of the same and appling one coat of wall putty, for roof ceiling/ rafters/walls/wall panelling/ceiling, and drywall partition withnecessaryscaffolding and surface preparation, sand papering, scrapping & removing old loose paint films, filling all holes and depressions, etc., complete as per specification and as directed by Engineer-in-Charge.NOTE-In case of painting in existing walls entire wall is to be cleaned and putty to be applied before painting.
97Supply and Fixing of SS Handrail by using SS Pipe 50mm dia 16 SWG 304 grade at top and vertical 40 X 40 SquareSS Pipe (spacing?) 304 grade (M/s. Jindal or any other specific Make?) and intermediate horizontal pipes are 20mm dia (20 mm x3 Nos?)ss 304 grade with necessary base plate and anchor fastners. (refer drawings Sheet No : 15)
98Preparation of new wood surfacesby applying filler coat,Staining VARNISH POLISH to veneer/ wooden surfaces of shade and colour as approved by E-IN-C and applying one layer spray coat of PU coat( polyurethane coating) semi matt finish including all labour charges ,material charges etc. all complete as directed by Engineer-in-Charge
99Providing and fixing DECORATIVE CHARCOAL SHEETS of size mentioned in drawing of 12mm thickness of Euro Pratik make or its approved equivalent,fixed &pasted using Fevicol SRand Heatx over 12mm thk plywood which is screwed to the wall in locations as specified by EIC ,all complete including material costs,tools and tackles,labour charges etc. (refer drawings Sheet No : 16 -17 )
100FURNITURE
101Supply of Godrej -PISA 2 SEATER SOFA or Approved Equivalent brand and Shade appproved by EIC as per following specifications.seat foam: the seat should be made of pu foam with density 32 ± 2 kg/cu.mtr having an additional toplayer of j pu foam with density 28 ± 2 kg/cu. seat should be upholstered with fabric or leatherette. 2) back foam: the back should be made of pu foam with density 28 ± 2 kg/cu. mtr with two additional top layer of supersoft foam of density 23±2 kg/cu. mtr, upholstered with fabric or leatherette understructre understructure should be made up of 1.2±0.1 cm. thick hot pressed plywood ocp-qltapl14- 18 4. dia 4mm zigzag spring assembly should be mounted in understructure for support and additional cushioning purpose leg assembly: it should be a welded assembly made in stainless steel (grade ss 202) tube & plate.Width (W): 146.0 CM. Depth (D): 92.0 CM. Height (H): 82.0 CM. Seat Height (SH): 45.0 CM.
102Supply of Godrej -PISA 1 SEATER SOFAas per following specifications. seat foam: the seat should be made of pu foam with density 32 ± 2 kg/cu.mtr having an additional toplayer of j pu foam with density 28 ± 2 kg/cu. seat should be upholstered with fabric or leatherette. 2) back foam: the back should be made of pu foam with density 28 ± 2 kg/cu. mtr with two additional top layer of supersoft foam of density 23±2 kg/cu. mtr, upholstered with fabric or leatherette understructre understructure should be made up of 1.2±0.1 cm. thick hot pressed plywood ocp-qltapl14- 18 4. dia 4mm zigzag spring assembly should be mounted in understructure for support and additional cushioning purpose leg assembly: it should be a welded assembly made in stainless steel (grade ss 202) tube & plate.Width (W): 146.0 CM. Depth (D): 92.0 CM. Height (H): 82.0 CM. Seat Height (SH): 45.0 CM.
103Supply of PISA SIDE TABLE as per following specifications. Should be a center table glass : it should be 12 ±0.3 mm thick black tinted toughened glass uv glued with bushes made in ss 202 grade for fixing with understructure. pshould be a center table understructure : it should be a welded assembly made in ss202 grade having dia. 12±0.04 as per should be :1762. Width of table= 60.0 cm, Depth=60.0 cm, height=35.1 cm..
104" Supply ofGodrej - LA SEDE HIGH BACK CHAIR[ Conference - 1 ]as per following specifications. seat/back assembly : the cushioned seat should be made of injection molded plastic outer & inner.plastic inner should be upholstered with pure leather and moulded high resilience (hr) polyurethane foam of density 45±2 kg/m3,and hardness load 16 ± 2 kgf for 25% compression.the cushioned backshould be made of pu foam with insitu molded ms e.r.w round tube of size 1.9±0.03cm x 0.16 ±0.0128cm. it upholstered with pure leather. seat size : 47.6 cm. (w) x 49.2 cm. (d)back size : 47.5 cm. (w) x 77 cm. (d) armrests: the armrest top should be moulded from polyurethane(pu), upholstered in pure leather and mounted on to a drop lift adjustable type tubular armrest support made of 03.81±0.03cm x 0.2±0.01 cm thk m.s e.r.w tube having chrome plated finish.the armrest height adjustable up to 6.5±0.5cm in 5 stepsactive bio-synchro mechanism: the adjustable tilting mechanism should be designed with the following features:• 360° revolving type.• front-pivot for tilt with feet resting on ground and continuous lumbar support ensuring more comfort.• tilt tension adjustment can be operated in seating position.• 5-position tilt limiter giving option of variable tilt angle to the chair.• seat/back tilting ratio of 1: 2• the mechanism housing should be made up of hpdc aluminium black powder coated.4 seat depth adjustment: seat depth adjustment should be integrated in the seat through a sliding mechanism. seat depth adjustment range should be of 6.0±0.5 cm. adjustable back support: back frame should be connected to the up/dn mechanism housed in plastic t spine. it can be adjusted in the range of 7.42±0.5 cm for the comfortable back support to suit individual need.pneumatic ht. adjustment: the pneumatic height adjustment has anadjustment stroke of 10.0±0.3 cm.pedestal assembly the pedestal should be high pressure die cast polished aluminium and fitted with 5 nos. twin wheel castors. the pedestal should be 65.0 ± 0.5cm. pitch-center dia.(75.0 ± 1.0cm. with castors.)twin wheel castors:the twin wheel castors should be injection moulded in black polypropylene. Overall Dimensions of Chair Seat Height -44.5 to 54.5 cm. Height -114-131.5 cm. Width & Depth of Chair as measured from base - Width-76.1 cm and Depth-66.5 cm"
105Board Room and lobby Modification
106Electricalworks for Entrance Lobby
107SUPPLY OF METAL GLAD PLUG and SOCKET, single PHASE, Neutral and EARTH (INDUSTRIAL TYPE)
108Supply, installation, testing and commissioning of single phase 3 Pin socket type to connect the 3 tone A/C unit at Board Room at Entrance respectively.
109Supply of 32 A 1 Ph IP 66 Protected industrial type socket above falls ceiling on the surface or flush with wall as per the site requirements.
110Supply, installation, testing and commissioning of 32 DP MCB control box for controlling the A/C 3 tone unit in a suitable enclosure at table top level on the surface or flush with wall as per the site requirements.
111Supply of SOCKETS
112The scope of work includes supply of the below mentioned sockets as per the specifications of this tender and directions of Engineer-In-Charge.
113Supply, erection, testing and commissioning of 1 No. 16A/6A socket outlet controlled by 1 No. 16A switch
114Supply, erection, testing and commissioning of 1 No. 6A socket controlled by 1 no 6A switch (board socket).
1152 Nos 6A malty utility 5 pin sockets controlled by 1 No.6A switch for computer power points long the patrician wall of the cabin or on the wall on surface or flush with surface.
116Switch boards for controlling light points
117One no 6A switch controlling one light point
118One no 6 A switch controlling 2 points
119One no 6 A switch controlling 3 points
120One no 6 A switch controlling 8 points
121Two way controlled light point switch
122INSTALLATION OF CONDUIT
123The scope of work includes Installation and laying of conduits in concealed or surface mounted for circuit/main/telephone/video conferencing/data wiring with clamps, saddles, pull boxes and all other conduit accessories as per the specifications of this tender and directions of Engineer-In-Charge.
124Installation of 32 mm PVC conduit
125Installation of 25 mm PVC conduit
126Installation of 20mm conduit
127SUPPLY OF DATA WIRING
128The scope of work includes supply, fixing and connection of modular type of Anchor make (Roma) or approved equivalent RJ-45 computer socket Cat-6 with shutter, metal box and cover plate, complete with labour and materials as per direction of the Engineer-in-Charge.
129CAT-6 CABLING:
130The scope of work includes supply and laying of 4 pair CAT-6 type cable in PVC pipe/Casing Caping with all necessary accessories for computer networking, as per the specifications of this tender and directions of Engineer-In-Charge.
131Only ISI marked wires of make Finolex/Polycab/Havells/KEI/RPG/V-GUARD shall be used.
132TELEPHONE SYSTEMS
133The scope of work includes supply and laying of 2 pair,0.5/0.9 mm annealed unarmoured Telephone cable laid in already installed PVC conduits with all necessary Accessories from the Telephone JB to officer’s table, all complete with labour and materials, as per the specifications of this tender and directions of Engineer-In-Charge.
134The scope of work includes supply and fixing of Telephone RJ 11 Jack with shutter in GI box along with modular base and cover plate, concealed in wall / partition, all complete with labour and materials, as per the specifications of this tender and directions of Engineer-In-Charge. The make shall be Anchor or equivalent.
135SUPPLY AND ERECTION OF POINT WIRING MATERIAL
136The scope of work includes supply of concealed/surface point wiring using 660V/1.1KV grade copper conductor PVC insulated FRLS copper wires (with proper R, Y, B colour code), as per the specifications of this tender and directions of Engineer-In-Charge.
1373 R of 2.5 Sq. mm cu conductor wire (Circuit mains)
1383 R of 1.5 Sq. mm cu conductor wire (point wiring)
1393 R of 2.5 Sq. mm cu conductor wire (6A power sockets)
140Power point wiring with the following size of wires.
1412 R of 6 sq.mm cu conductor wire with 1R of 2.5 Sq. mm cu wires. (For A/C 3 tone unit)
1422 R of 4 sq.mm cu conductor wire with 1R of 2.5 Sq. mm cu wires. (For 16 A power plus)
143JUNCTION BOXES.
144Suitable size junction boxes to terminate power wiring cable, which in turn should be enable to take the pipe along with wires in to the patrician walls and other area where wiring in done in a concealed pattern.Size 200mm x 50 mm
145SUPPLY OF ELECTRICAL FIXTURES
146The scope of work includes supply of following light fixtures including necessary hardware such as clamps, nuts, bolts, screws, nails, suspension rods and materials required for terminations, interconnections, earthing from terminal block/ceiling rose to light fitting, as per specifications of this tender and directions of Engineer-In-Charge.
14710 W AURA STYLE EDGE NW (Philips Make)
14820W 4 Feet LED Batten WW (Philips Make)
14910 W 2 feet LED Batten (Philips Make)
15012W DURASTERNSquare NW
151Beacon pendent model No. 58074
1523 Watts ALTRA Spot Tilt WW
153ElectricalWorksfor Board Room
154SUPPLY OF DISTRIBUTION BOARDS
155Supply of Auto sources Change over switch to have one source at all time without failure.
156Fabrication and supply of ATS switch of 63A 4P Socomec switch with the following:
157Supply, Installation, testing and commissioning of Floor power distribution boards with the following incoming and out goings: Indicating lamps to indicate which source is in operation. Phase indication lamp 3 Nos. with control fuses. 1 no. of 63A 4P MCB and 1 nos. of 40A 4P MCB isolators to feed these supply to AC PDB and PDB respectively.These arrangement shall be made in a single enclosure made of 14G MS sheet, with necessary bus bars interconections and cable adotor boxes to enable the incoming and out goings.
158Fabrication and supply of ATS switch of 63A 4P Socomec switch with the following: (For LDB)
159Supply, Installation, testing and commissioning of Floor lighting distribution boards with the following requirements:Indicating lamps to indicate which source is in operation. Phase indication lamp 3 Nos. with control fuses. These arrangement shall be made in a single enclosure made of 14G MS sheet, with necessary bus bars interconections and cable adotor boxes to enable the incoming and out goings.
160PDB - I (main):
161The scope of work includes supply of pre-fabricated, pre wired DB’s provided with insulated phase busbars, neutral busbar with shrouds, earth busbar with colour coded interconnecting wires, blank plates, circuit identification tags, double door with IP43 (industrial type) Vertical type 4 way TPN MCB DB(PDB) consisting of following,
162Incomer: 63 A FP MCCB
163Outgoings: 8 Nos 32 A SP MCBs
164to feed power supply to 3 Nos. 3 Tone A/Cs powers at Board room and 2 Nos 3 tone A/Cs at Entrance Lobby. 3 nos. 32A SP MCBs remains spare.
165DB shall have top cable adopter box with necessary fixing accessories etc., to enable termination of incoming cable and outgoing wires, and shall be as per IS standards and directions of Engineer-In-Charge.
166PDB - II:
167The scope of work includes supply of pre-fabricated, pre wired DB’s provided with insulated phase busbars, neutral busbar with shrouds, earth busbar with colour coded interconnecting wires, blanking plates, circuit identification tags, double door with IP43 (industrial type) 7 segment 8-way TPN MCB DB(PDB) consisting of following:
168Incomer: 63 A FP MCB
169Outgoings:
1703 Nos 40A DP RCCB (100 MA) for Phase Control, 24 Nos 16A/10A SP MCBs to feed the small powers.DB shall have top cable adopter box with necessary fixing accessories etc., to enable termination of incoming cable and outgoing wires, and shall be as per IS standards and directions of Engineer-In-Charge.
171LDB - I:
172The scope of work includes supply of pre-fabricated, pre wired DB’s provided with insulated phase busbars, neutral busbar with shrouds, earth busbar with colour coded interconnecting wires, blank plates, circuit identification tags, double door with IP43 (industrial type) 7 segment 8 way TPN MCB DB(PDB) consisting of following,
173Incomer: 63 A FP MCB
174Outgoings: 3 Nos 32 A DP RCCB (30 MA) for Phase Control24 Nos 10A SP MCBs to feed to lighting circuit.
175DB shall have top cable adopter box with necessary fixing accessorise etc to enable cable and outgoing wires, and shall be as per IS standards and directions of Engineer-In-Charge.
176SUPPLY OF METAL GLAD PLUG and SOCKET, single PHASE, Neutral and EARTH (INDUSTRIAL TYPE)
177Supply, installation, testing and commissioning of single phase 3 Pin socket type to connect the 3 tone A/C unit at Board Room at Entrance respectively.
178Supply of 32 A 1 Ph IP 66 Protected industrial type socket above falls ceiling on the surface or flush with wall as per the site requirements.
179Supply, installation, testing and commissioning of 32 DP MCB control box for controlling the A/C 3 tone unit in a suitable enclosure at table top level on the surface or flush with wall as per the site requirements.
180SUPPLY & LAYING OF LT UG CABLES
181The scope of work includes supply, laying, testing and commissioning of AYFY/AYWY/ PVC armoured Aluminium conductor cables along walls, cable trays including supply and fixing of clamps, nuts, bolts, screws, identification tags at beginning and end each cables. The cables shall be properly dressed. (NB: Measurements may change upon site requirements)
182Supply & Erection of 4C x 25 Sq.mm Aly UG cable (From the existing main panel to PDB I floor Main Distribution board)
183Supply & Erection of 4C x 16 Sq.mm Aly UG cable( From the existing main panel to PDB-II)
184Supply & Erection of 4C x 10 Sq.mm Aly UG cable (From the main Floor distribution board to LDB -I)
185SUPPLY & INSTALLATION OF LT CABLE TERMINATION
186Supply & Installation of all materials and termination of the following YWY/AYFY copper flexible LT UG cables using double compression type cadmium plated brass cable glands suitable crimped type cable lugs(copper), cable identification tags and including gland earthing using Cu conductor of adequate size.
187Termination of 4C x 25 Sq.mm Alu UG Cable
188Termination of 4 C x 16 Sq.mm Alu UG Cable
189Termination of 4 C x 10Sq.mm Alu UG Cable
190Supply of SOCKETS
191The scope of work includes supply of the below mentioned sockets as per the specifications of this tender and directions of Engineer-In-Charge.
192Supply, erection, testing and commissioning of 1 No. 16A/6A socket outlet controlled by 1 No. 16A switch
193Supply, erection, testing and commissioning of 1 No. 6A socket controlled by 1 no 6A switch (board socket).
1942 Nos 6A malty utility 5 pin sockets controlled by 1 No.6A switch for computer power points long the patrician wall of the cabin or on the wall on surface or flush with surface.
195Switch boards for controlling light points
196One no 6A switch controlling one light point
197One no 6 A switch controlling 2 points
198One no 6 A switch controlling 3 points
199One no 6 A switch controlling 8 points
200Two way controlled light point switch
201INSTALLATION OF CONDUIT
202The scope of work includes Installation and laying of conduits in concealed or surface mounted for circuit/main/telephone/video conferencing/data wiring with clamps, saddles, pull boxes and all other conduit accessories as per the specifications of this tender and directions of Engineer-In-Charge.
203Installation of 32 mm PVC conduit
204Installation of 25 mm PVC conduit
205Installation of 20mm conduit
206SUPPLY OF DATA WIRING
207The scope of work includes supply, fixing and connection of modular type of Anchor make (Roma) or approved equivalent RJ-45 computer socket Cat-6 with shutter, metal box and cover plate, complete with labour and materials as per direction of the Engineer-in-Charge.
208CAT-6 CABLING:
209The scope of work includes supply and laying of 4 pair CAT-6 type cable in PVC pipe/Casing Caping with all necessary accessories for computer networking, as per the specifications of this tender and directions of Engineer-In-Charge.
210Only ISI marked wires of make Finolex/Polycab/Havells/KEI/RPG/V-GUARD shall be used.
211TELEPHONE SYSTEMS
212The scope of work includes supply and laying of 2 pair,0.5/0.9 mm annealed unarmoured Telephone cable laid in already installed PVC conduits with all necessary Accessories from the Telephone JB to officer’s table, all complete with labour and materials, as per the specifications of this tender and directions of Engineer-In-Charge.
213The scope of work includes supply and fixing of Telephone RJ 11 Jack with shutter in GI box along with modular base and cover plate, concealed in wall / partition, all complete with labour and materials, as per the specifications of this tender and directions of Engineer-In-Charge. The make shall be Anchor or equivalent.
214SUPPLY AND ERECTION OF POINT WIRING MATERIAL
215The scope of work includes supply of concealed/surface point wiring using 660V/1.1KV grade copper conductor PVC insulated FRLS copper wires (with proper R, Y, B colour code), as per the specifications of this tender and directions of Engineer-In-Charge.
2163 R of 2.5 Sq. mm cu conductor wire (Circuit mains)
2173 R of 1.5 Sq. mm cu conductor wire (point wiring)
2183 R of 2.5 Sq. mm cu conductor wire (6A power sockets)
219Power point wiring with the following size of wires.
2202 R of 6 sq.mm cu conductor wire with 1R of 2.5 Sq. mm cu wires. (For A/C 3 tone unit)
2212 R of 4 sq.mm cu conductor wire with 1R of 2.5 Sq. mm cu wires. (For 16 A power plus)
222JUNCTION BOXES.
223Suitable size junction boxes to terminate power wiring cable, which in turn should be enable to take the pipe along with wires in to the patrician walls and other area where wiring in done in a concealed pattern.Size 200mm x 50 mm
224SUPPLY OF ELECTRICAL FIXTURES
225The scope of work includes supply of following light fixtures including necessary hardware such as clamps, nuts, bolts, screws, nails, suspension rods and materials required for terminations, interconnections, earthing from terminal block/ceiling rose to light fitting, as per specifications of this tender and directions of Engineer-In-Charge.
226RC 380 B LED 36W 6500 G6 600X600
2273 Watts ALTRA Spot Tilt WW
22810 W WIZ AURA W1 F1
22955 W /Pro Glow NXT Strip Lighting /BP 264 LED
23025W Cove Glow strip Light with driver 72 LED/Mtrs
2312 Mtrs 17mm / Aluminium profile
232Supply and associated AC Works for Lobby
233Supply of Ceiling Mounted Fresh air Fan, Low Noise Fans
234Fresh air fan, 150 CFM ducted type fitted with Grille Make:Ecoair,, ,Equivalent ,,
235INSTALLATION WORK-LOWSIDE
236Installation of 1.84 TR 4 Way Cassette Unit
237Installation of Fresh Air Fan-150 CFM
238Supply & Installation of copper pipe with insulation with 19 MM thick Nitrile Rubber Insulation & polyshield coating-Cu Piping Thickness as per OEM Standards Make: Mandev,Mexflow,Uniflow ,ARMAFLEX,KFLEX
239Supply and Installation of Drain Pipe with 9 MM thick nitrile rubber insulation Make:Supreme ,Finolex,Astral
24032 mm Dia
24125 MM Dia
242Supply & Installation of Interconnecting Cable-4C x 2.5 Sqmm Make :Lapp,Beldon,Polycab,Finolex
243Outdoor unit stand
244Nitrogen Pressure Testing, Vaccumissing etc
245Bird/Insect Screen Mesh of SS, SS Cowl @ 45 Deg
246Air Transfer Grilles-400 MM x 100 MM Make:Cosmic,Airmaster,Systemaire
247Supply of cassette AC for Lobby
248SUPPLY OF 4 WAY CASSETTE UNIT
2491.84 TR, Smart Featured 4 Way Cassette Unit, 5 Star, Inverter Model, Twin Rotary Compressor, 5 Years Warranty on Compressor, 5 Years Warranty on PCB, 5 Year Warranty on Outdoor Casing only, LCD Wireless Remote Controller, Cooling only Model, Capable of working with R32 Refrigerant, 100% copper model, Indoor unit air quantity @ High Speed- 1350 CMH, unit shall be capable of accessing through Mobile App for easy operation. Additional Protective corrosive resistance coating for both Indoor & Outdoorheat transfer coils, PCB etc Make: Panasonic/Daikin/Mitsubishi Electric/Toshiba
250Supply & associated AC Works Board room
251Supply of Ceiling Mounted Fresh air Fan, Low Noise Fans
252Fresh air fan, 275 CFM ducted type fitted with Grille Make:Ecoair,,,Equivalent.
253INSTALLATION WORK-LOWSIDE
254Installation of 3 TR 4 Way Cassette Unit
255Installation of Fresh Air Fan-275 CFM
256Supply & Installation of copper pipe with insulation with 19 MM thick Nitrile Rubber Insulation & polyshield coating Make:Mandev,,Mexflow,,Uniflow
257Supply and Installation of Drain Pipe with 9 MM thick nitrile rubber insulation Make:ARMAFLEX,KFLEX
25832 mm Dia Make:Supreme,,Finolex,,Astral
25925 MM Dia
260Supply & Installation of Interconnecting Cable-4C x 2.5 Sqmm
261Outdoor unit stand Make:Lapp,Beldon,,,Polycab,,,Finolex.
262Nitrogen Pressure Testing, Vaccumissing etc
263Bird/Insect Screen Mesh of SS, SS Cowl @ 45 Deg
264Air Transfer Grilles-400 MM x 100 MM Make:Cosmic,,,Airmaster,Systemaire.
265Supply of cassette AC for Board Room
266SUPPLY OF 4 WAY CASSETTE UNIT
2673.0 TR, Smart Featured 4 Way Cassette Unit, 4 Star, Inverter Twin Rotary Compressor, 5 Years Warranty on Compressor, 5 Years Warranty on PCB, 5 Year Warranty on Outdoor Casing only, LCD Wireless Remote Controller, Cooling only Model, Capable of working with R32 Refrigerant, 100% copper model, Indoor unit air quantity @ High Speed- 2200 CMH, unit shall be capable of accessing through Mobile App for easy operation. Additional Protective corrosive resistance coating for both Indoor & Outdoorheat transfer coils, PCB etc
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail