Directorate General Defence Estates has published Tender For Design, Engineering And Medical Gas Pipeline System At Cantonment General Hospital On Turnkey Basis, Delhi Cantt. Submission Date for this Tender is 22-06-2023. Medical Gas Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | MGPS INSTALLATION OXYGEN SYSTEM |
2 | Supply, Installation, Testing and Commissioning of a 2700 Litres per day, Bulk Liquid Medical Oxygen Source of Supply, complete with; (1): One (1) x 6.0 Kl double walled Vacuum-Insulated Cryogenic Bulk Storage Tank, of standard cylindrical shell design, with vertical configuration, suitable for storing Liquid Medical Oxygen as the primary source of supply; constructed as per ASME Sec. VIII/EN-13458-2/ Div-1 or equivalent, suitable for working pressure of 16 to 18 Kg/ cm2 at cryogenic temperature (-196°C up to 20°C), fabricated from austenitic steel (stainless steel 304 or SS 310) inner pressure vessel that is supported in a mild steel or Carbon steel outer shell; (2): two 2 x 5400 LPM Capacity ambient heated VIE vaporisers arranged in Duplex configuration (3): Two 2 number Line Pressure Regulators conforming to ISO 10524-2:2018, suitable for Medical Oxygen; (4): a set of transfer pipes, pipe fittings, etc. as per design; duly connected to hospital Supply main pipeline and as per the Technical Specifications, as provided. |
3 | Note: The Liquid Medical Oxygen System Installation shall be specifically governed by The Static & Mobile Pressure Vessel (Unfired) (also known as SMPV (U) Rules) Rules- 1981 of Indian Explosive Act- 1984 & amendments there-of). The cryo tank will be supplied empty to the site. The cryo tank shall be provided with suitable legs/ saddles for grouting to the foundation. The foundation bolts, nuts and washers required for fastening the tanks to the foundation shall also be provided. The cryo tank shall be provided with lifting lugs for handling. The manufacturer will provide specific Test Certificate in accordance with the Pressure Equipment Directive EU 97/23/EC and EN 13458. It shall be suitable for Vaporisers to be installed separately. |
4 | Supply, Installation, Testing and Commissioning of 2 x 10 Duplex Cylinder manifold, complete with automatic changeover panel, with flow capacity of over 2000 LPM, suitable for 2 source supply, suitable for connection to Hospital Supply Line, complete with middle frame, pigtails, wall brackets & chains for individual D Type Bulk Cylinders, along with non-return valves for every cylinder, required control valves, LED display, etc., as per technical specifications provided. |
5 | NITROUS OXIDE SYSTEM |
6 | Supply, Installation, Testing and Commissioning of 2 x 2 Cylinder duplex manifold, complete with automatic changeover panel with flow capacity of over 100 LPM, suitable for 2 source supply, complete with middle frame, wall brackets & chain for individual D Type Bulk cylinder along with non return valves for every cylinder, required control valves, LED display, etc., as per technical specifications provided. |
7 | COMPRESSED AIR SYSTEM FOR MEDICAL AIR 4 & SURGICAL AIR 7 |
8 | Supply, Installation, Testing and Commissioning of a Non-Lubricated Multi-Scroll (8x5), Air Compressors; each with +/- 5 HP motor (Total 40 HP), delivering 100 cfm compressed air.Each compressor in the Medical Air Plant will be able to backup the other compressor.Each Compressor will have, an After Cooler.The Medical Air Plant will have One (1) number Air REceiver of 2000 Litre water capacity, 2 Number multi stage air Filtration Sets, 2 Number Air Dryer, 2 set of all needed Valves, Pressure Regulators, Pressure Safety Valves, etc., suitable for 100 CFM air flow, as per technical specifications provided.The Air Intake for Air Compressors will be individual Air intakes, complete with coarse Air Filters where required, and active charcoal filters where required, valves and copper pipes or a properly sized Intake Air Header complete with 20 micron Air Filters and active charcoal filters valves and copper pipes, as per Technical Specifications provided.The Medical Air Plant will provide a Header with 2 out ports, one For Medical Air 4 and the second for Surgical air 7.These Two Hospital Supply pipelines will be provided with their respective Pressure Regulators for MA4 and SA7, |
9 | Supply, Installation, Testing and Commissioning of 2 x 4 D TypeCylinder manifold, complete with automatic changeover, regulator, middle frame, wall brackets & chain for individual D Type Bulk cylinder along with non return valves for every cylinder, required control valves, etc., as per technical specifications provided. |
10 | VACUUM SYSTEM |
11 | Supply, Installation, Testing and Commissioning of Medical Vacuum Plant comprising of 440 V x 3 phase, Single Stage, Air Cooled, Oil-Sealed Rotary Vane Medical Vacuum Pump, rated for 50 cfm, with 3 HP motors in duplex configuration. The pump assembly will include an integral anti-suck back valve, exhaust oil separator delivering 99.9% oil-free air, oil level sight glass, and an exhaust pressure gauge. Each pump will be protected by a temperature switch, check valve, and pump isolation valve, source isolation valve and flexible connector. The Medical Vacuum Plant will be complete with One (1)number vacuum vessels, each of 2000 Litre Water capacity, 2 bacteria Filtration Units, all needed Valves, Pressure Regulators, etc. as per technical specifications provided. |
12 | ANAESTHETIC GAS SCAVENGING (DISPOSAL) SYSTEM (AGSS) |
13 | Supply, Installation, Testing and Commissioning of an active extraction and disposal system for waste anaesthetic gas, comprising of a dedicated radial blower in simplex configuration, conforming to IS/ISO 7396-2, rated for continuous duty (AGSS Simplex Pump), as per technical specifications provided. It shall provide a maximum flow rate of 80 LPM, with a 1 kPa resistance to flow and minimum flow rate of50 LPM, with a 2 kPa resistance to flow. The air cooled AGSS pump shall be skid mounted with motor control unit, directly coupled impeller assembly, starter/isolator, moisture drain flask and flexible connector to connect the plant to the pipeline. It shall be supplied complete with alarm pressure switch, a remote start switch with a red Plant Emergency indicator & a mains on Green indicator, a digital display providing readout of the vacuum level in the pipeline. It shall be provided one for each Operating Room and will be sized for one Terminal unit per Operating Room, irrespective of the no. of the Terminal units installed. An additional unit will be supplied as reserve AGSS Unit |
14 | Supply, Installation, Testing and Commissioning of discharge Outlets which can be manifolded upto 3 units, one each for each AGSS Pump. |
15 | Supply, Installation, Testing and Commissioning of integrated Scavenging, Receiving and transferring Units with Connecting Hoses, with AGSS Type connections, complete with two, flow adjustable, relief valves, as per technical specifications provided. One such Unit shall be provided for each operating room. |
16 | Supply, Installation, Testing and commissioning of AGSS Warning and alarm systems and a transmitter for integration with Hospital BMS System including its line fault monitoring unit, indicator panel and cables. |
17 | COMBINED ELECTRICAL CONTROL PANEL FOR MEDICAL AIR AND VACUUM |
18 | Supply, Installation, Testing and Commissioning of combined Electrical Control Panel,suitable for the installed Compressed Air Plant and Vacuum Plant Systems complete with all needed contactors, relays, switches, Hour meters, suitable for Cascading, Sequencing and Duplexing Control, with all needed wiring, cable trays, etc. complete with its enclosure, as per technical specifications provided. |
19 | Copper Pipe as per BS EN 13348 (Approximate Lengths) |
20 | Supply and Installation of following Copper Pipes, for fabricating the pipe carcass for this MGPS installation, including all required copper fittings of all sizes, as per technical specifications provided. |
21 | 42 mm OD x 1.2 mm thick |
22 | 28 mm OD x 0.9 mm thick |
23 | 22 mm OD x 0.9 mm thick |
24 | 15 mm OD x 0.9 mm thick |
25 | 12 mm OD x 01 mm thick |
26 | LVAas per DIN ISO 228/1 for Oxygen PN 10 |
27 | Supply, Installation, Testing and Commissioning of Degreased Isolation Valve complete with its assemblies, all for Oxygen Use, of sizes as under, as per technical specifications provided. |
28 | 15 mm |
29 | 22 mm |
30 | 28 mm |
31 | 42 mm |
32 | AVSU |
33 | Supply, Installation, Testing and Commissioning of Top Entry Area Valves Service Units complete with NIST Connection, pressure gauzes, mounted in a box, of sizes as per technical specifications provided. |
34 | 4 Gas Services |
35 | 3 Gas Services |
36 | 2 Gas Services |
37 | MEDICAL GAS DIGITAL LCD ALARM SYSTEM |
38 | Supply, Installation, Testing and Commissioning of main Panel, Slave Panel and other alarm panels, including the required MGPS LAN, all needed Active and Passive Components, as listed below and as per technical specifications provided. |
39 | Master Control, Monitoring and Alarm Panel, complete with its CPU,UPS, Display Units, Active and Passive components, all needed TCP/IP switches, Alarm Signal Module, a central control unit that receives signals and data that is generated by various sensors, transducers, devices, etc., monitoring MGPS status, on 24 x 7 basis, capable of interfacing with third party Communication System and Software provided by the Gas Supplier to monitor the status of Liquid Medical Oxygen, Hospital Information System, Hospital’s Message Integration Engine (MIE), Hospital Paging System, connections to all PLC controlled panels, as deployed in MGPS installation, MGPS LAN and a digital and Graphic coloured display unit to provide either Normal Condition Display or Emergency Condition display. It will automatically activate the Alarm Signal Module which will activate the alarms. Simultaneously, it will activate the Hospital’s Message Integration Engine to broadcast notifications. It will provide large size Audio-visual display panels. The panels will provide physical, labelled, visual alarm indicators. MGPS Monitoring, Control and Alarm System Master Panel Display will be provided in the Central MGPS Plant Room & Manifold Room or where the MGPS Duty Technician is located, and in other locations (Slave Monitor Displays), as per Hospital Policy and as per Technical Specifications provided. |
40 | MGPS Monitoring, Control and Alarm System Software |
41 | Slave Repeater Panel (minimum 380 mm HD, Audio-visual, Display Units) for Master Control and Alarm Panel at locations to be specified by the Project Engineer complete with its CPU, LAN. TCP/IP switches and Software Bridge Connections, as per Technical Specifications provided. |
42 | Local Alarm Indicator Panels (MGPS) For 4 Gas Services |
43 | Local Alarm Indicator Panels (MGPS) For 3 Gas Services |
44 | Local Alarm Indicator Panels (MGPS) For 2 Gas Services |
45 | MGPS TERMINAL UNITS |
46 | Supply, Installation and Testing of Panel mounted, front loading MGPS Terminal Units conforming to IS/ISO 9170, complete with its tail pipe, matching probe made of stainless Steel, suitable for 6 Types of Gas Services, as listed in Technical specifications. |
47 | Supply, Installation and Testing of Pendants mounted, front loading MGPS Terminal Units conforming to IS/ISO 9170, complete with its tail pipe, matching probe made of stainless Steel, suitable for 6 Types of Gas Services, as listed in Technical specifications. |
48 | Supply, Installation and Testing of Pendants mounted, front loading, 1H AGSS Terminal Units conforming to IS/ISO 7396-2 and IS/ISO 9170, complete withmatching probe made of stainless Steel, as listed in Technical specifications. |
49 | MEDICAL GAS CYLINDERS |
50 | Supply of Empty, Certified, Medical Gas Cylinders, Bulk Type, High pressure, conforming to IS 728, colour coded for specific Gas, as per specifications provided. |
51 | For Oxygen |
52 | For Nitrous Oxide |
53 | For Medical Air |
54 | Supply of Medical Gas Cylinder Transport Trolley as per Technical Specifications provided. |
55 | ACCESSORIES |
56 | Supply of Oxygen flow meters with humidifier, as per Technical Specifications provided |
57 | Supply, Installation and Testing of Ward Vacuum Unit with Regulator, Collection Jar of 600 ml with Bracket, suitable for 0-760 mm Hg, as per Technical specifications |
58 | Supply, Installation and Testing of Ward Vacuum Unit with Regulator, Collection Jar of 600 ml with Bracket, suitable for 0-300 mm Hg, as per Technical specifications |
59 | Supply, Installation and Testing of Ward Vacuum Unit with Regulator, Collection Jar of 600 ml with Bracket, suitable for 0-150 mm Hg, as per Technical specifications |
60 | Supply, Installation and Testing of Theatre Suction Unit, trolley mounted with 2 Number2000 ml Collection Jars, as per Technical specifications |
61 | Supply Installation and Testing of Medical Gas Hose, complete with antistatic, colour coded, pressure pipe and terminal units, as required for different gases, and crimped to size, one for each Outlet, each hose with 5 Meter pipe, as per Technical specifications. |
62 | Supply, Installation, Testing and Commissioning of Twin Adapter, Terinal Outlet Spliter, Gas specific connection with non-interchangeability, Designed for use with BS Probe connectors, conforming to IS/ISO 7396, as per technical specifications provided. |
63 | Supply Installation and Testing of Cylinder Storage Racks, fabricated from welded steel, finished with epoxy powder coating in Black colour, complete with restraining steel chains, as per sizes approved and approved samples conforming to Technical Specifications as provided. |
64 | Supply, Installation, Testing and Commissioning of Standard Bedhead panels for General wards |
65 | Supply, Installation, Testing and Commissioning of Standard Bedhead panels for HDU (Acute Care) Wards |
66 | Supply, Installation, Testing and Commissioning of Standard Bedhead panels for Intensive Care Wards |
67 | Supply, Installation, Testing and Commissioning of Ceiling Suspended fixed Pendant with a Pendant Head, conforming to ISO 11197, Medical Supply Units, with BS MGPS Terminal Units, as per technical specifications provided. |
68 | Supply, Installation, Testing and Commissioning of Ceiling Suspended Pendant with one Arm and a Pendant Head, conforming to ISO 11197, Medical Supply Units, with BS MGPS Terminal Units, as per technical specifications provided. |
69 | Supply of Fire Extinguishers, as per approved sample, as under |
70 | Supply, Erection, Testing & commissioning of ISI marked Carbon dioxide type fire extinguisher with cylinder fully charged with CO2 gas of 4.5 kgcapacity complete with squeeze lever discharge valve, pressure gauge, discharge tube, horn, C.I. (for wall mounting etc.) conforming to I.S. 2878 |
71 | Supply, testing, commissioning of dry powder type (gas cartridge) with cylinder initially fully charged with dry powder (a b c type) of 5 kg capacity complete with standard discharge valve with tube (for wall mounting etc.) conforming to I.S - 217 |
72 | Running, operation and routine maintenance (as regards replacement of parts same is deemed included in one year waranty period of MGPS) including provisioning of all manpower, Supervisors, Inspectors as per RFP for the first year complete for successful running/ mainteanance of installation including all incidental expenses. |
73 | Running, operation, routine and comprehensive maintenace including replacement of defective parts, spares etc in all respect as also provisioning of all manpower, Supervisors, Inspectors as per RFP for the second year complete for successful running/ mainteanance of installation including all incidental expenses. |
74 | Running, operation, routine and comprehensive maintenace including replacement of defective parts, spares etc in all respect as also provisioning of all manpower, Supervisors, Inspectors as per RFP for the third year complete for successful running/ mainteanance of installation including all incidental expenses. |
75 | Running, operation, routine and comprehensive maintenace including replacement of defective parts, spares etc in all respect as also provisioning of all manpower, Supervisors, Inspectors as per RFP for the fourth year complete for successful running/ mainteanance of installation including all incidental expenses. |
76 | Running, operation, routine and comprehensive maintenace including replacement of defective parts, spares etc in all respect as also provisioning of all manpower, Supervisors, Inspectors as per RFP for the fifth year complete for successful running/ mainteanance of installation including all incidental expenses. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail