| 1 | Basement Central AC Plant Part-IComprehensive maintenance and providing services for operation including general maintenance of complete central AC plant 3 x 225 TR with all accessories and sub assemblies (including Sunday and Holidays) for the following plants and eqipments: -(a) Basement Central AC Plant(i) Screw type Chiller unit 3 x 225 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby)(ii) LT control panel with accessories(iii) 3 x Condensor Water Pump (02 working + 01 standby)(iv) 3 x Chiller Water Pump (02 working + 01 standby)(v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line(vi) Cooling tower water tanks 15000 ltrs x 06 Nos (vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+7) and TC(EC) building (G+1) and Make up Water tanks at roof top(b) CH (EC) Main Hospital Building (G+7) and TC(EC) building (G+1)(i) 6 x Air Handlig Units(ii) Air Duct opening grills(iii) 43 x Fan Coil Units |
| 2 | NOTES :- 1.Maintenance of AC plant andentire system/equipmentsof capacity 3x 225 TRin summer, winter andmonsoon season as per the period of contract includingdaily/periodical checks i.equarterlymaintenance requirement as per manufacturer\"s instructions.The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season.2. Cleaning of inside and out side of the installation and the costthereofshall be deemed to be included in the unit rate quoted against this item. 3. Contractor shall rectify the fault within 4 hrs or as directed by Enng-in-Charge. 4. Contractor shall maintain temperature of AC plants as per direction ofEnng-in-Charge or his rep within design limit as specified in PS.3. During entire contract period any defective componentsor any other materials which is not specified in sch \"A\" but repair/replace to make plant/ mechinery fully functional.The cost of the same is deemed included quoted rates and no extra cost shall be paid to the contractor in this effect. 4. The cost of transportation and other necessary equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly5. Make and model of part to be replaced shall be same as existing at site or as per OEM.6. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levels at no extra cost. 7.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. The cost of the same shall be deem to be included above quoted rate8. All labour charges for taking out old spares/ items and replacing spares, testing, commissioning transportation etc shall be deemed to be included in the above quoted rates. In case any expert technician/engineer required for major faults of pant shall be provide by contractorwithout any extracost of depertment.11.Above central AC installation shall be run24 Hr x 7 days. |
| 3 | Supply only following spares for chilled water pumps 40HP - 03Nos. Make - Kirloskar, Model No - UP 100/38: - |
| 4 | Bearing Housing Driving End, make: Kirloskar |
| 5 | Bearing Housing Driven End,make: Kirloskar |
| 6 | Bearing No 6309, Make - TATA/ SKF/ NBC |
| 7 | Impeller |
| 8 | Shaft |
| 9 | Shaft sleeve |
| 10 | Oil seal |
| 11 | Set of \"O\" Rings |
| 12 | Tyre coupling cover for Pump-Motor coupling |
| 13 | Pump motor coupling with MS key |
| 14 | Supply only following spares for Condenser pump set 30HP 03 Nos, Make : Kirloskar, Model No. UP 125/30A : - |
| 15 | Bearing Housing Driving End |
| 16 | Bearing Housing Driven End |
| 17 | Bearing No 6306, Make - Tata/ SKF/ NBC |
| 18 | Impeller |
| 19 | Shaft |
| 20 | Shaft sleeve |
| 21 | Oil seal |
| 22 | Set of \"O\" Rings |
| 23 | Tyre coupling cover for Pump-Motor coupling |
| 24 | Pump motor coupling with MS key |
| 25 | Supply only Refrigerent Gas R-22 in returnable container for chiller unit of 225 TR, Make :Mafron, Floron or equivalent |
| 26 | Supply only following spares for Chiller unit 225 TR, Make : Trane |
| 27 | Solenoid valve coil oil line, Make - Trane / Parkar |
| 28 | Solenoid valve coil Loader/ Unloader line, Make - Trane / Parkar |
| 29 | Compressor oil |
| 30 | HP Switch, Make : Danfos / Indfos / ALCO |
| 31 | LP Switch, Make : Danfos / Indfos / ALCO |
| 32 | Condensor Refrigerant sensor |
| 33 | Discharge line temperature sensor |
| 34 | Evaporator leaving/ entering water pair sensor |
| 35 | Condensorleaving/ entering water pair sensor |
| 36 | Miscellaneous items for AHUs - 09 Nos of sizes (12.5 TR TO 160 TR): - |
| 37 | Material and labour for fabrication work and installation of AHU cabinet of height upto 1.60 mtr as per existing size with 16 SWG GI sheet including MS channels of required size and length as per existing with legs as per site requirement and arrangement for mounting of AHU motor with adjustable base frame, and making opening for chilled air duct outlet including dismantling of old AHU cabinet all as specified and as directed by the Engr-in-Charge. [Note: - For payment purpose, the top portion of the AHU cabinet will be measured only] |
| 38 | Material and labour for insulation of inner surface of AHU cabinet with acoustic insulation comprising of layers of 12 mm thick acoustic rigid fibre glass sheet covered with onionskin paper fastened with 26 SWG aluminium perforated sheet fixed with bolts and nuts including taking out of old insulation all as specified and as directed. |
| 39 | Fine filter of size .620 x 508 x 45 mm for AHU cooling coil |
| 40 | Fine filter of size 600 x 500 x 40 mm for AHU cooling coil |
| 41 | Ball Bearing No 6306, Make SKF for motor capacity 5 HP |
| 42 | Ball Bearing No 6308, Make SKF for motor capacity 7.5 HP |
| 43 | Bearing for blower (Pilo Block bearing Model No UC207, Make - FYH /NTN |
| 44 | Bearing for blower (PiloBlock bearing Model No UC206, Make - FYH /NTN |
| 45 | V belt of size B-94 |
| 46 | V belt of size B-93 |
| 47 | V belt of size B-92 |
| 48 | V belt of size B-90 |
| 49 | V belt of size B-89 |
| 50 | Supply only following spares for LT Panel: - |
| 51 | 3 pole power contractor AC3 rating 40 Amp, make: L&T, type ML 3 ofor equivalent |
| 52 | 3 pole power contractor AC3 rating 32 Amp, make: L&T, type ML 2 ofor equivalent |
| 53 | 3 pole power contractor AC3 rating 25 Amp, make: L&T, type ML1.5 ofor equivalent |
| 54 | Thermal overload relay direct mounting 14 to 23 Amp, make: L&T, Cat No SS94135OODO or equivalent |
| 55 | Thermal overload relay direct mounting 20 to 33 Amp, make: L&T, Cat No SS94136OOEO or equivalent |
| 56 | Thermal overload relay direct mounting 30 to 50 Amp, make: L&T, Cat No SS94136OOGO or equivalent |
| 57 | Analog Timer 415V, 50 Hz 3-30 seconds, make: L&T, type ET 100/ ST 100 or equivalent |
| 58 | Descaling and cleaning ofcondensors & evaporators by using Kirloskar recommended cleaning solution followed by mechanical cleaning of condensor tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge. |
| 59 | Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes in every 3 months or as and when ordered by Engineer-in-Charge.[Note: Rates quoted by contractor for item No 10 to 12 deemed to be inclusive of necessary arrangement viz. necessary water jet pumps, coil cleaning chemicals, tools etc] |
| 60 | Material and Labour for cleaning of HVAC duct thoroughly including taking necessary photographs before and after cleaning all as specified and as directed by the Engr-in-Charge |
| 61 | Material and Labour for MS Flange with rubber gasket including electric welding with MS pipes suitable for fixing with the following sizes of MS pipes: -[Note: - Bolts, nuts and washers will be measured and paid under separate item] |
| 62 | 40 mm bore |
| 63 | 50 mm bore |
| 64 | 80 mm bore |
| 65 | 100 mm bore |
| 66 | 150 mm bore |
| 67 | 200 mm bore |
| 68 | Material and Labour for Mild steel screw bolts (machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut all as specified and as directed. |
| 69 | Material and Labour for fittings for MS Pipes such as Bends, Tapers, \"Y\" junction, double branch, cross, Tee pieces (single & double branch), any type and angle/ radius and straight connecting pieces all as specified and as directed. |
| 70 | Material and Labour for insulation of MS Pipe with PUF slab (Density 36 kg/ cm2) upto 50 mm thick and not less than 40 mm thick with and including applying bituminous compound and cladding with sheet metal cladding with aluminium not less than 22 gauge thick complete suitable for insulating the following sizes of MSpipe including taking down of existing pipe: - |
| 71 | 20 mm bore |
| 72 | 25 mm bore |
| 73 | 40 mm bore |
| 74 | 50 mm bore |
| 75 | 80 mm bore |
| 76 | 100 mm bore |
| 77 | 150 mm bore |
| 78 | 200 mm bore |
| 79 | Defi Tech Bldg Central AC Plant Part-IComprehensive maintenance of complete central AC plant 3 x 200 TR including chillers, pumps, motors cooling towers, AHUs, Cooling tower pipe line, chilled water pipeline, air duct, valves, LT panel and its accessories complete, maintanance and repair as and when required to run the plant with full efficiency without break down including saturday, sunday and holidays and mechanic with adequate experience should be available to rectify in case any fault observed and all as specified and directed by Engineer-in-ChargeNote:-In this quated rate followingwork included in quated rate.(a) Defi Tech AC Plant(i) Screw type Chiller unit 3 x 200 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby)(ii) LT control panel with accessories(iii) 3 x Condensor Water Pump (02 working + 01 standby)(iv) 3 x Chiller Water Pump (02 working + 01 standby)(v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line(vi) Cooling tower water tanks (vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+5) (b) CH (EC) Defi Tech building(i) 15 x Air Handlig Units(ii) Air Duct opening grills(iii) 15 Treated frush air unit |
| 80 | NOTES :- 1.Maintenance of AC plant andentire system/equipmentsof capacity 3x 200 TRin summer, winter andmonsoon season as per the period of contract includingdaily/periodical checks i.equarterlymaintenance requirement as per Engineer in chargeinstructions.The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season.2. Cleaning of inside and out side of the installation and the costthereofshall be deemed to be included in the unit rate quoted against this item. 3. Contractor shall rectify the fault within 24 hrs or as directed by Enng-in-Charge. 4. Contractor shall maintain temperature of AC plants as per direction ofEnng-in-Charge or his rep within design limit as specified in PS.3. During entire contract period any minor defective componentswhich is not specified in sch \"A\" but repair/replace to make plant/ mechinery fully functional.The cost of the same is deemed included quoted rates and no extra cost shall be paid to the contractor in this effect. 4. The cost of transportation and other necessary minr equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly5. Make and model of part to be replaced shall be same as existing at site or as per OEM/ Engineer n cahrge.6. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levelst. 7.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. The cost of the same shall be deem to be included above quoted rate8. All labour charges for taking out old spares/ items and replacing spares, testing, commissioning transportation etc shall be deemed to be included in the above quoted rates. In case any expert technician/engineer required for minorfaults of pant shall be provide by contractorwithout any extracost of depertment.11.Above central AC installation shall be run24 Hr x 7 days |
| 81 | Supply only following spares for AC Plant of 200x3 . Make - Kirloskar. |
| 82 | Repair & Maintenance of upto 1.0 HP Motor sutaible for TFA |
| 83 | Re- winding of moter of capacoty 7.5 HP |
| 84 | Re- winding of moter of capacoty 10 HP |
| 85 | Re- winding of moter of capacoty 12.5 HP |
| 86 | Rewinding of moter of capacoty 20 HP |
| 87 | Re- winding of moter of capacoty 25 HP |
| 88 | Supply only 20HPVFD for secondary pump |
| 89 | Supply only VLT suitable for 200 TR AC Plant 15KW /20 HP. (Make :- DANFOSS or equivalent make as approved by Garrison Engineer. |
| 90 | Supply only K Smart AC Panel controller |
| 91 | Supply only K Smart CARD suitable for AC temprature controller |
| 92 | Supply only PCB Board with display( For AHU ) |
| 93 | Supply only V-Beltwith following size-A-69,A-56,A-56,A-50,A-42,A59,A-39,A-60,A-79 . |
| 94 | Supply only Contractor 3TF47 |
| 95 | Supply only Contractor 3TF51 |
| 96 | Supply only DO(Drier Core) |
| 97 | Supply only MCCB , 100 Amp ,4 Pole |
| 98 | Supply only MCCB63 Amp 4 Pole |
| 99 | Supply only MCB 20 Amp, 3 Ph |
| 100 | Supply only GI duct 24WG , Tata /JINDAL |
| 101 | Supply onlynitrile ruber 13mm |
| 102 | Dismantling of existing MS pipes carefully dismantling from chilled water pipe line with gas cutting where necessary and Supply and laying MS Pipes \"medium\" grade as per IS: 1239 (Part-I) of make: TATA/ SAIL/ JINDAL with electric welding where necessary andlaid in floors or fixed to walls and ceilings etc all as specified and as directed of the following sizes: - |
| 103 | 20 mm bore |
| 104 | 25 mm bore |
| 105 | 40 mm bore |
| 106 | 50 mm bore |
| 107 | 80 mm bore |
| 108 | 100 mm bore |
| 109 | 150 mm bore |
| 110 | 200 mm bore |
| 111 | Material and Labour for MS Flange with rubber gasket including electric welding with MS pipes suitable for fixing with the following sizes of MS pipes: - |
| 112 | 40 mm bore |
| 113 | 50 mm bore |
| 114 | 80 mm bore |
| 115 | 100 mm bore |
| 116 | 150 mm bore |
| 117 | 200 mm bore |
| 118 | Supply only cyphon with bib cock guage |
| 119 | Supply only thermometer |
| 120 | Material and labour for HEPA filter of EU 13 normal flow, media construction microscopic fiber glass +aluminium sepeartor of 99.99% efficiency, particals to be filtered down to 0.3 mircon, initial pressure drop 25mm of water gauge, final pressure drop 60mm of water guage including dismentaling of existing old HEPA filter. |
| 121 | Supply only AHU airfilters .5 micron suitable for AHU |
| 122 | Supply only AHU pre air filters .5 micron suitable for AHU |
| 123 | Supply only Pilow type filter suitable for TFA 0.5 micron |
| 124 | Supply only Solonoid Valve Kit CXH9 |
| 125 | Supply only Pressuer Transducer 44.8 BAR |
| 126 | Supply only Pressuer Transducer 10. BAR |
| 127 | Supply only Electronic Expention valve E6U |
| 128 | Material and labour for dismantling of old butterfly valves and fixing of new Butterfly valve of make: C&R/ Kartar/ Pelicon or equivalent in other approved make all as specified and as directed suitable for the following sizes of pipe: - |
| 129 | 40/ 50 mm bore |
| 130 | 80 mm bore |
| 131 | 100 mm bore |
| 132 | 150 mm bore |
| 133 | 200 mm bore |
| 134 | Supply only Gas ket Kit for CXH5 Compresser |
| 135 | Supply only Gas ket Kit for CXH5 Condensor |
| 136 | Supply only Spiral target valve |
| 137 | Supply onlycooling tower fills block |
| 138 | Supply only Spiral Eliminator block (fill block) |
| 139 | Supply only Float Valve |
| 140 | Supply only Header PVC line 6\" |
| 141 | Supply only Header branch PVC line 2\" |
| 142 | Supply only MCX 31 Contactor 82.5A |
| 143 | Supply only MN 5 over load 30 to 50 A |
| 144 | Supply only Ball bearing for screw chiller compress for200 TR |
| 145 | Supply only Compressor Oil |
| 146 | Supply only Compressor Oil Filter |
| 147 | Supply only Refigeration Filter |
| 148 | supply only Operating Sensors for Screw compressor 200 TR |
| 149 | Supply & Testing nitrogen for leak testing |
| 150 | Supply only refrigerant 134A |
| 151 | Supply only PCB Display Boardfor Screw compressor 200 TR |
| 152 | Supply only Actuator valve |
| 153 | Supply & fixing in repair water seel for condenssor pump |
| 154 | Descaling and cleaning ofcondensors and evaporators by using DAIKIN recommended cleaning solution followed by mechanical cleaning of condensor and evaporators tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge. |
| 155 | Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes in every 3 months or as and when ordered by Engineer-in-Charge.[Note: Rates quoted by contractor for item No 31 to 32 deemed to be inclusive of necessary arrangement viz. necessary water jet pumps, coil cleaning chemicals, tools etc] |
| 156 | Repair & servicing of Treated Fresh Air unit of AHU |
| 157 | Supply & fixing in repair canvas cloth suitable for AHU & TFA including taking down old canvas |
| 158 | Material and labour for painting with one coat of red oxide primer and two coats of black japan paint including preparation old/ new surface of steel of any description all as specifierd and as directed. |
| 159 | Mother & Child Block Central AC Plant Part-IComprehensive maintenance of complete central AC plant 3 x 200 TR including chillers, pumps, motors cooling towers, AHUs, Cooling tower pipe line, chilled water pipeline, air duct, valves, LT panel and its accessories complete, maintanance and repair as and when required to run the plant with full efficiency without break down including saturday, sunday and holidays and mechanic with adequate experience should be available to rectify in case any fault observed and all as specified and directed by Engineer-in-Charge.Note:-In this quated rate followingwork included in quated rate.(a) Mother & Child Block(i) Screw type Chiller unit 3 x 200 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby)(ii) LT control panel with accessories(iii) 3 x Condensor Water Pump (02 working + 01 standby)(iv) 3 x Chiller Water Pump (02 working + 01 standby)(v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line(vi) Cooling tower water tanks (vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+3) (viii) 2 x Hot Water Pump (Standby)(b) Mother & Child Block(i) 05 x Air Handlig Units(ii) Air Duct opening grills(iii) 01 Treated frush air unit |
| 160 | Material and Labour for insulation of MS Pipe with PUF slab (Density 36 kg/ cm2) upto 50 mm thick and not less than 40 mm thick with and including applying bituminous compound and cladding with sheet metal cladding with aluminium not less than 22 gauge thick complete suitable for insulating the following sizes of MSpipe: - NOTES :- 1.Maintenance of AC plant andentire system/equipmentsof capacity 3x 200 TRin summer, winter andmonsoon season as per the period of contract includingdaily/periodical checks i.equarterlymaintenance requirement as per Engineer in chargeinstructions.The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season.2. Cleaning of inside and out side of the installation and the costthereofshall be deemed to be included in the unit rate quoted against this item. 3. Contractor shall rectify the fault within 24 hrs or as directed by Enng-in-Charge. 4. Contractor shall maintain temperature of AC plants as per direction ofEnng-in-Charge or his rep within design limit as specified in PS.3. During entire contract period any minor defective componentswhich is not specified in sch \"A\" but repair/replace to make plant/ mechinery fully functional.The cost of the same is deemed included quoted rates and no extra cost shall be paid to the contractor in this effect. 4. The cost of transportation and other necessary minr equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly5. Make and model of part to be replaced shall be same as existing at site or as per OEM/ Engineer n cahrge.6. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levelst. 7.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. The cost of the same shall be deem to be included above quoted rate8. All labour charges for taking out old spares/ items and replacing spares, testing, commissioning transportation etc shall be deemed to be included in the above quoted rates. In case any expert technician/engineer required for minorfaults of pant shall be provide by contractorwithout any extracost of depertment.11.Above central AC installation shall be run24 Hr x 7 days. |
| 161 | Supply only following spares for AC Plant of 3 x 200 TR . Make - DAIKIN. |
| 162 | Supply onlycooling tower fills block |
| 163 | Supply only Spiral Eliminator block (fill block) |
| 164 | Supply only Spiral target valve |
| 165 | Supply only Float Valve for existing size of cooling tower |
| 166 | Supply only PCB Board with display( For AHU ) |
| 167 | Supply only V-Beltwith following size-A-69,A-56,A-56,A-50,A-42,A59,A-39,A-60,A-79, B-69 . |
| 168 | Supply only Contractor MNX A1 |
| 169 | Supply only Contractor MNX A2 |
| 170 | Supply only MCCB , 100 Amp ,4 Pole |
| 171 | Supply only MCCB63 Amp 4 Pole |
| 172 | Supply only MCB 20 Amp, 3 Ph |
| 173 | Supply onlynitrile ruber 13mm |
| 174 | Supply only SS cyphon withbib cock guage |
| 175 | Supply only thermometer |
| 176 | Supply only Pre Air Filter 5 micron suitable for AHU |
| 177 | Supply only Fine Filter 5 micron suitable for AHU |
| 178 | Supply only Solonoid Valve Kit |
| 179 | Supply only Electronic Expention valve E6U |
| 180 | Material and labour for HEPA filter of EU 13 normal flow, media construction microscopic fiber glass +aluminium sepeartor of 99.99% efficiency, particals to be filtered down to 0.3 mircon, initial pressure drop 25mm of water gauge, final pressure drop 60mm of water guage including dismentaling of existing old HEPA filter. |
| 181 | Material and labour for dismantling of old butterfly valves and fixing of new Butterfly valve of make: C&R/ Kartar/ Pelicon or equivalent in other approved make all as specified and as directed suitable for the following sizes of pipe: |
| 182 | 40/ 50 mm bore |
| 183 | 80 mm bore |
| 184 | 100 mm bore |
| 185 | 150 mm bore |
| 186 | 200 mm bore |
| 187 | Supply only MN 5 over load 30to 50 A |
| 188 | supply Only Operating Sensors for Screw compressor 200 TR |
| 189 | Supply only refrigerant 134A |
| 190 | Supply only PCB Display Boardfor Screw compressor 200 TR |
| 191 | Descaling and cleaning ofcondensors and evaporators by using Kirloskar recommended cleaning solution followed by mechanical cleaning of condensor and evaporators tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge. |
| 192 | Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes in every 3 months or as and when ordered by Engineer-in-Charge.[Note: Rates quoted by contractor for item No 13 to 14 deemed to be inclusive of necessary arrangement viz. necessary water jet pumps, coil cleaning chemicals, tools etc] |
| 193 | Supply and fixing of Change over Switch handle only having capacity of 1250 Amps complete all as specified and as directed. |
| 194 | Note: Schedule of credit (SCHEDULE OF CREDIT)amount of Rs __________ mentioned on Page No _______ shall be deducted from the total quoted amount of BOQ. |