|
| 1 | Renovation ofexisting Tables with brick filler, wooden frame, Granite top with drawer and doors |
| 2 | Brick Filler 3 Feet Height and 1 feet width for Table (7 x 4 Sq.feet) |
| 3 | Wooden Table frame for Table (7 x 4 Sq.feet) Material-Mahogany |
| 4 | Granite Table Top for Table (7 x 4 Sq.feet)-Pure Black 20 mm thickness |
| 5 | Drawer ( 18 \"x 6\", MDF exterior), cupboard (2.5 x1.5x2 feet, 18 mm Marine Plywood(Grade 710)) and door (2.5 x1.5 feet) for Table (7 x 4 Sq.feet) |
| 6 | Renovation ofShelf |
| 7 | Shelf: a) Box 9.5x7x1.5 feetandb) Box20 x 7x 1.5 feetwith partitions anddoorsMaterial : Box-Marine Plywood 18 mm (Grade 710)Door- MDF exterior |
| 8 | Renovation of cupboards |
| 9 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior 3 x 3 x 1 feet |
| 10 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior 2 x 3 x 1 feet |
| 11 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior6 x 4 x 1 feet |
| 12 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior 9 x 6 x 1 feet |
| 13 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior 20 x 7 x 1 feet |
| 14 | Box Marine Plywood 18 mm (Grade 710) and door MDF exterior 20 x 4 x 1 feet |
| 15 | Renovation of Windows |
| 16 | Window frame 3 x 1.5.feet with Mahogany wood and 4 mm glass |
| 17 | Renovation ofvent |
| 18 | Fabrication using GI Net for 200 sq. feet forvent |
| 19 | Renovation ofelectrical fittings, lighting, Plumbing and rearrangement & repair of existing Gas Pipelines (50 m) |
| 20 | Electrical: Plug and Power Plug ( 20 nos), Switches (20)LED tubes (20 nos), electrical wiring (70 meters), exhaust fans (10), fans (20) Plumbing: Laying PVC pipe (75 m), Square Wash Basin Ceramic with binary taps (13 sets)Gas supply:Reinstallation ofGas piping (90 m ) Copper with 45 burner points (standard, branded items only |
| 21 | Painting |
| 22 | Painting of Walls & Ceilings (5250 sq feet).Painting of above mentioned tables, shelves, cupboards, windows and vent (Enamel and Water -based enamel branded paints) |
| 23 | Dismantling unwanted structures, miscellaneous unforeseen work(Applicable normal rate) |
| 24 | Labour Charge (Applicable normal rate) |