Supply Different Size Of Pvc Column Pipe, Star-Delta Starter, Submersible Cable And 12.5 Hp To 15.0 Hp Repaired Pump Motor Set Including Withdrawl, Repairing, Lowering And Surging With Necessary Materials At Rajarhat Zone Ward No. 04 To 09 ( Total 22 Nos. Pump ) Under Bidhannagar Municipal Corporation, Maintenance For One Year.Name Of The Pump :- ( I ) Tetuntala , Purbachal ( Ii ) Purbayan ( Iii ) Natun Para , Chandrani ( Iv ) Jagardanga ( V ) Salua Muslim Para ( Vi ) Tetultala , Baishali ( Vii ) 1 No. Niranjan Pally ( Viii ) Kali Park ( Ix ) Tarun Sengupta Upanagari 1No. Gopal Pur ( X ) Prantic Abasan , Salua, Mondal Para ( Xi ) Dashodran ( Xii ) Sardar Para, Kaikhali ( Xiii ) Tegharia , Mondal Para, Pump No.03 ( Xiv ) Mondal Ganti Football Ground ( Xv ) Mondal Ganti Frinds Club ( Xvi ) East Mall Pump No.-2 ( Xvii ) Shitala Mandir Charaktala ( Hulf Project ) ( Xviii ) Pachampara Arjun Pur Near Play Gorund ( Xix ) Raghunathpur Beside Charigram Asram ( Xx ) Raghunath Pur , Near Hotel Host ( Xxi ) Sree Ram Garden Battala Vip Road ( Xxii ) Raghunathpur, Uttarpara Near Jubak Sangha- 1 Supply And Delivery Of 125Mm.Dia Heavy Duty Pvc Column Pipe Length 10- 0 ( 3.10Mtr ) Make - Ashirbad / C.R.I. / Raksha 2 Supply And Delivery Of 3 Inch Dia Heavy Duty Pvc Column Pipe Length 10-0 ( 3.10Mtr ) Make - Ashirbad 3 Supply Of 3 / 5 Dia 16 Long Special Type Short Pcs. With Both End V Thread As Per Pvc Pipe Thread, As Same Thread With Locking Arrangement With One Side Flange For Matching Cidf Bend Flange. 4 Supply And Delivery Of 3 / 5 Dia ( 5 / 6 ) Standard Duty Pvc / Ms Adopter. 5 Supply Of Star Delta Starter, 3 Phase, 440V For 12.5 Hp To 15 Hp Including Fitting Fixing On Old Panel Side Wall With Ms Clamp Including All Labour Charges And Inter Connection Complete. 6 Supply And Connection Of 6 Sq. Mm Flat 3 Core Copper Conductor Pvc Submersible Cable Of Finolex Make With Water Seal Compound Joint Including Less For Unseviceable Cable. 7 Supply And Connection Of 4 Sq. Mm Flat 3 Core Copper Conductor Pvc Submersible Cable Of Finolex Make With Water Seal Compound Joint Including Less For Unseviceable Cable. 8 Supply Fitting And Fixing Of 100 Amps. Main Switch 415N / 100 Amps. In Iron Angle Frame Including All Materials And Labour Charges 9 Supply And Fittings Ms Top Resting Clamp 14 X 80 Mm. Section For Submersible Pump Motor Set In Two Part. 10 Supply Of Pump Motor Safety Clamp With Ring, Plastic Rope Dog Clamp Rope From Motor Clamp To Top Rest Clamp Fixing. 11 Supply Of Ss Patty For Making Clamp To Central Guard Of Pvc Column Pipe Including Ss Nuts And Bolts. 12 Withdrawl Of Old Submersible Pump Motor Set Along With Column Pipes And Other Accessories From Deep Tubewell. 13 Dismanting 17.5 Hp To 20 Hp Submersible Pump Motor Assembly Along With Nrv Repairing And Through Overhaulling The Submersible Pump By Replacing Gm Bush, Bearing Lock, Impeller Cooler Ring, Neck Ring, Bowel Bush, Ss Bolt, Nut, Stud, Washer, Ss Key, Valve Gate Etc. By Supplying New One Including Necessary Machining, Turning Etc. And Re-Assembling The Pump Unit Including Less For Unserviceable Materials. 14 Repairing 17.5 Hp To 20 Hp Submersible Motor By Rewinding And Through Overhauling By Replacing Sand Guard, Thrust Bearing, Bush Bearing, Oil Seal. Ss Bolt, Washer, Nut, Stud Etc. By Supplying New One Including Necessary Machining Turning Etc. And Re-Assembling The Pump Unit Including Less For Unserviceable Materials. 15 Lowering The Submersible Pump Motor Set Complete Unit Including Inter Connection Complete. 16 Repairnig Of Auto Starter, Dol-Starter, Min Switch And Required Od Materials Point Such As No-Volt Coil, Magnate Coil, Contract Point With Assembly, Fixed Contract, Fuse Grip, Hrs Fuse And Necessary Small Materials Including All Labour Charges. ( 1 No. Electrician And 1 No. Halper ) For Smooth Services In Proper Position As Per Direction Of Eic. ( For One Year ) 17 Surging Of Existing Tube Well With Chemical Treatment And Bucket Wash ( Prior To Use Of Compressor Machine ) And Developing The Tube Well With Compressor Machine At Least 3 ( Three ) Days At 8 ( Eight ) Hours Per Day Till The Yield Is Obtained At Least By 75% Of The Total Specified Yield Of The Tubewell ( Measured By V Notch Tank ) And Draw Down Is Within The Permissible Limit Of 10% Variation And Water So Obtained After Such Washing And Developing Will Be Free From Sand And Bacteria For Which Test Report From The Public Analyst Is To Be Obtained. ( The Rate Is Inclusive Of All Labour And Materials Including Hire Charges Of Tools And Plants And Cost Of Materials. ) For Tube Well Of Size Bigger Than 100Mm Dia. With Top Enlargement To Have Yield Of 6000 Gallons Per Hour.