| 1 | Repair for the work of AMMA Cement Godown at Union office Campus in Thottiampatti Panchayat |
| 2 | Replace the existing damaged Asbestos Cement Sheet Roof including all charges etc Complete |
| 3 | Roofing with Asbestos cement sheet of 6mm thick including all charges etc., complete |
| 4 | Brick work in cement mortor 1:5 mix using country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including cost and conveyance of all materials of all materials to site and labour charges etc. complete |
| 5 | Plastering with cement mortor 1:5 mix 12mm thicknessincluding cost of conveyance of all materials to work site and all labour charges etc. Complete |
| 6 | Distempering two coats over one coat of Primary Coatwith best approved colour including all charges including cleaning, preparing the surface etc., complete |
| 7 | Distempering two coats with Exterior Emulsion over one coat of Primary Coatwith best approved colour including all charges including cleaning, preparing the surface etc., complete |
| 8 | Painting two coats for NEW IRON / OLD IRON / OLD WOOD work including all labour charges etc., complete |
| 9 | Pointing with CM 1:3 mix for R R work including cost and conveyance of all charges to work site and all labour charges etc complete |
| 10 | Special Ceiling Plastering with CM 1:3 using10mm thickness including cost and conveyance of all charges to work site and all labour charges etc complete |
| 11 | Wiring with 2x1.5 sqmm (22/0.3) PVC inslulated SC unsheathedcv. Conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accesseries and with T.W switch box with painting of suitable colour of open PVC Light/Fan Point including all other charges etc., complete |
| 12 | Supply and fixing of 4\" - 18w LED tube light with fitting including all charges etc complete |
| 13 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation. |
| 14 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation. (Pumping main) |
| 15 | Supply and Fixing of RCC 300mm hume Pipe including cost and conveyance of all charges etc complete |
| 16 | Supply and Delivery of following PVC pipes PVC pipes |
| 17 | Conveyance of following rigid PVC pipes, Lowering to trenches and laying to proper grade and alignment |
| 18 | Refilling the excavated earth including all labour charges etc., complete |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |