Design, Drawing, Construction, Testing, Commissioning Of Intake Well 6M Dia 27.36 M Height Approach Bridge 30 M Length, Approach Road, Raw Water Electric Sub Station 160 Kva/33/0.415 Kv With All Required Work,Raw Water V.T. Pumps And Motors 3No -140156 Lph Discharge And 60.0M Headat Near Village Near Basantpur , 5.0 Mld Conventional Type Water Treatment Plant, Clear Water Centrifugal Pumps And Motors 134563 Lph And 110M Head -3No,Clear Water Electric Sub Station 250 Kva/33/0.415 Kv With All Required Work At Village Near Kera, 610 Kl Capacity 30 Staging Mbr-1 No At Village Khairtal, Providing, Laying, Jointing And Testing Commissioning Of Raw Water Pumping Main Di K-9 350 Mm Dia Length10550 M And Clear Water Pumping Main 300 Mm Dia Di K-9 Length 9380 M, Clear Water Gravity Mains Pipe Di K-7 500Mm Dia – 100 M., 400 Mm Dia – 4890 M.,350 Mm Dia 20 M 300Mm Dia – 4829M. Clear Water Gravity Mains Opvc Pipe, 250Mm Dia – 9111M , 200Mm Dia – 15674M., 160Mm Dia – 15260M , 110Mm Dia – 26671M . Total Length- 76555 M With All Required Valves Specials As Per Attached Key Plan Map, Providing And Fixing Bulk Flow Meters Upto Inlate Of Following 19 Villages Oht, ,Nala Crossing And Work Include Taking Permission Todepttt. Like Cseb,Pwd, Wrd Etc. Allied All Civil Works Including Boundary Wall Around Wtp Campus. Work Completionis 1 Year Including Rainy Season 3 Month Testing 9 Month Trial And Run After Completion Of All Components Of The Scheme Including Chemicals, With Defect Liabilities Period Of 1 Year., Under 19 Villages Of Multi Village Water Supply Scheme Kera , Block- Nawagarh, District- Janjgir Champa (C.G.)Name Of Villages :- 1.Kera, 2.Nagaridih, 3.Kanasda, 4.Mudpar, 5.Pachari, 6.Misda, 7.Barra , 8. Bhathali, 9. Katoud, 10. Tenduwa, 11. Tushma, 12. Khapradih,13. Patharra, 14. Kirit, 15. Kotiya, 16. Siud, 17. Rogda, 18. Salkhan , 19. Kukda.